Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Sixth Road flyover opened to traffic
01-07-2013, 12:27 PM
Post: #1
Sixth Road flyover opened to traffic
RAWALPINDI : The newly-constructed Sixth Road Flyover was opened for traffic on Saturday evening.

Though the local administration wanted to wait for the return of PML-N MNA Hanif Abbasi from Saudi Arabia to inaugurate the flyover, the National Logistics Cell (NLC) managed its opening so that it could repair the service roads without any hindrance.

Sardar Naseem, the president of the party’s city chapter, MPA Raja Hanif Advocate and officials of the communication and works department and the NLC were present when the traffic was allowed to pass on the flyover at 4:20pm.

Chief Minister Shahbaz Sharif will formally inaugurate the bridge next week.

It may be recalled that the chief minister had laid the foundation of the flyover on September 25. The 248-metre-long bridge with 202-metre ramp has been constructed at a cost of Rs1.017 billion. This is the second flyover in the city and on Benazir Bhutto Road after the one built at Chandni Chowk.

“The construction work was completed two days back and the NLC requested the C&W department to open it. However, the department refused saying the provincial government’s consent was required,” an official of the department told Dawn.

He said the department stopped the NLC from opening the bridge by parking its tractors on it. Upon this, he added, the NLC authorities contacted the CM secretariat and got the permission for its opening.

A senior leader of the PML-N requesting not to be named said MNA Abbasi had managed to convince the chief minister not to inaugurate the flyover until he returned from Saudi Arabia after performing Umrah by January 9.

The flyover is constructed in the constituency of NA-56 from where Hanif Abbasi was elected. “He (Hanif Abbasi) wanted to cash in on the project as the elections are approaching,” he added.

“The bridge was completed on Friday and the construction company wanted to repair the service roads otherwise it will be difficult for it to move the machinery to the site. There was no issue between the company and the local administration over the opening of the flyover,” said Brig Mohammad Shahid of the NLC while talking to Dawn.

When contacted, Jamshaid Khan, an engineer of the C&W department, claimed that the flyover’s opening was never stopped but the construction work was completed on Saturday morning.

However, Commissioner Imdadullah Bosal said the construction company had recommended opening of the bridge while the C&W department had sought some time.

“The C&W department wanted to complete the remaining work without any hurdle so it had delayed the opening of the bridge,” he said.

“The lighting system, greenbelts beneath the bridge, patchwork and the construction of service roads along the bridge will take some time,” he said.

However, he added, the remaining work would be complete before the formal inauguration of the flyover
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  DHA City Karachi Sub-Office will be Opened Soon in Lahore LRE-Azan 0 468 12-19-2023 02:31 PM
Last Post: LRE-Azan
  Shahdara Flyover Construction Has Begun | A Traffic Plan Has Been Published LRE-Azan 0 836 03-01-2023 08:11 PM
Last Post: LRE-Azan
  IJP Road to open to traffic by the end of month LRE-Azan 0 908 01-26-2023 03:05 PM
Last Post: LRE-Azan
  Lahore: Shadra Flyover And Band Road Underpass Approved LRE-Azan 0 1,529 12-02-2021 07:51 PM
Last Post: LRE-Azan
  LWMC has Launched an Operation to make Mall Road a Model road of the City LRE-Azan 0 4,476 08-09-2018 06:35 PM
Last Post: LRE-Azan
  Greenvalley Opened Another Store In Bahria Town Rawalpindi Salman 0 7,023 03-06-2014 01:00 PM
Last Post: Salman
  Khaira Distributory Road that links Package 17 of Ring Road to Ferozepur Road Salman 0 10,551 11-30-2013 12:48 PM
Last Post: Salman
  Road From LOS To Multan Road, Construction Work On The Go Salman 0 12,763 09-23-2013 03:18 PM
Last Post: Salman
  Traffic System Destroyed In Bill Road Market, Traders Perplexed Salman 0 7,051 09-11-2013 07:35 PM
Last Post: Salman
  Newly constructed flyover closed for traffic Salman 0 4,172 06-05-2013 06:40 PM
Last Post: Salman
  Karachi Development News : Flyover road inaugurated Salman 0 5,235 05-30-2013 06:39 PM
Last Post: Salman
  Pirwadhai underpass opened to traffic, but flyover still closed Salman 0 4,304 03-22-2013 08:40 PM
Last Post: Salman
  WASA completes work at 6th Road Flyover: Dy MD Salman 0 4,995 03-13-2013 03:17 PM
Last Post: Salman
  Modern traffic signals vital for smooth traffic flow’ Salman 0 4,723 01-03-2013 06:17 PM
Last Post: Salman
  Sixth road fly over to be completed by Jan 6 Salman 0 4,130 01-02-2013 12:44 PM
Last Post: Salman
  Sixth Road Flyover likely to be completed in five days Salman 0 4,919 01-01-2013 07:05 PM
Last Post: Salman
  Ring Road Police take charge today City traffic police resent new authority Salman 0 6,509 01-01-2013 07:04 PM
Last Post: Salman
  Kalma Chowk closed for traffic Salman 0 4,602 12-19-2012 05:23 PM
Last Post: Salman
  Delay in 6th Road flyover feared Salman 0 4,220 12-15-2012 05:20 PM
Last Post: Salman
  CM lays foundation of Rs1.4 billion flyover,underpass at Peshawar Road Salman 0 5,603 12-03-2012 11:59 AM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)