Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
About 20,000MW need to be added in 10 years
10-05-2010, 01:39 PM
Post: #1
About 20,000MW need to be added in 10 years
ISLAMABAD: Pakistan needs to add a power generation capacity of about 20,000MW in 10 years at a cost of $32 billion, with the main focus on indigenous resources, to overcome energy shortages for sustainable economic growth.

While these estimates have been presented by a private consultant hired jointly by the Ministry of Water and Power and the World Bank, many energy sector stakeholders have criticised the government’s inability to introduce efficiency in the power sector and make maximum and cost-effective use of existing generation capacity. They have also raised questions about uneconomic fuel mix and failure to recover power bills.

IGI Securities, a vendor of the World Bank and the Water and Power ministry, told a two-day conference on power sector reforms that foreign investments in power sector had been almost non-existent over the last eight years and only four per cent of the total investment went into the power sector.

The participants were told that the government had prepared a 10-year plan (till 2020) which required about $32 billion investment in the sector to bridge the supply-demand gap. Of the total $32 billion, about $17 billion would be provided by the government and the remaining portion, $15 billion, to be raised through private investment. The plan envisaged generation of 4929MW of hydropower with an estimated cost of $8.3 billion. About, 3500MW electricity would be generated at a cost of $6.5 billion by using indigenous coal.

The IGI representative said that the immediate need for revival of the power sector was to change the existing fuel mix that depended heavily on imported fuel and, at the same time, to improve the balance-sheet of the power sector which was possible only through tariff increase.

Commercial banks extended more than Rs500 billion loans to the power sector project financing, fixed investment and working capital, but the poor credit worthiness of the sector was a major bottleneck to attract foreign investment. The 2002 power policy “did not produce results and a lot has to be achieved through tariff reforms and changing the tariff structure”.

Minister for Water and Power Raja Pervez Ashraf said that the circular debt had jeopardised the entire economy and, therefore, the government had launched comprehensive reforms in the sector. He agreed that deteriorating energy mix was a real problem, but gas shortfalls did not allow a major change.

He said the government was working on a plan to reduce line losses by unbundling power distribution companies and in the first instance Sukkur Electricity Supply Company would be carved out of the Hyderabad Electricity Supply Company.

He said that despite the reforms programme, 150,000 Wapda employees would remain protected and should not feel threatened by the process.

Deputy Chairman of Planning Commission Dr Nadeem ul Haque said the government would install smart meters to stop pilferage and electricity theft.

An annual report of the National Electric Power Regulatory Authority (Nepra) said the overall global economic meltdown had affected power industry and slowed down the completion of projects.

Nepra said that the generation capacity needed to be supplemented on a war footing to meet growing electricity requirement.

“The need of the hour is to develop a multi-pronged strategy, looking for short-term as well as long-term solutions”.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  ‘17 projects underway to generate 20,000MW’ Salman 0 3,732 06-01-2012 12:38 PM
Last Post: Salman
  4,000MW to be added from Thar coal by 2015: CM Salman 0 4,117 05-09-2012 11:56 AM
Last Post: Salman
  1,000MW wind power projects: Sindh govt assures AEDB of allocating land for projects Salman 0 6,312 04-24-2012 12:14 PM
Last Post: Salman
  Indian PM’s offer to supply 5,000MWIndian PM’s offer to supply 5,000MW Salman 0 4,073 03-31-2012 01:45 PM
Last Post: Salman
  ‘Balochistan to import 1,000MW power from Iran’ Salman 0 4,091 03-27-2012 12:13 PM
Last Post: Salman
  26 projects planned to get 37,000MW from River Indus Lahore_Real_Estate 0 3,764 08-04-2011 12:52 PM
Last Post: Lahore_Real_Estate
  Pakistan Business Council supports implementation of value-added tax Lahore_Real_Estate 0 3,562 05-20-2011 11:27 AM
Last Post: Lahore_Real_Estate
  9/11 and 9 years Lahore_Real_Estate 0 2,800 09-14-2010 12:14 PM
Last Post: Lahore_Real_Estate
  Rawalpindi Cantt Expanded: 111 Acres Added! LRE 0 3,095 01-15-2010 09:10 PM
Last Post: LRE
  Kerry-Lugar Bill (Text in Urdu Added) LRE 13 42,832 10-26-2009 09:31 AM
Last Post: LRE
  Country can produce 100,000MW of hydropower: WAPDA LahoreEstate 0 3,509 10-04-2009 04:57 AM
Last Post: LahoreEstate
  Karachi: KPT land may be added to Benazir Park Naveed Yaseen 0 3,261 09-19-2009 09:36 AM
Last Post: Naveed Yaseen
  India plans 6,000MW power project in Iran Naveed Yaseen 0 2,893 08-25-2009 07:43 AM
Last Post: Naveed Yaseen
  3,161MW to be added to national grid by year-end Naveed Yaseen 0 2,504 07-13-2009 10:50 AM
Last Post: Naveed Yaseen
  Above 600MW to be added to system by mid July LahoreEstate 0 2,584 07-05-2009 03:53 AM
Last Post: LahoreEstate
  Two more projects added to Signal-Free Corridor-III LahoreEstate 0 2,319 05-31-2009 06:28 AM
Last Post: LahoreEstate
  Iran gas to generate 5,000MW, says Asim LahoreEstate 0 2,625 05-27-2009 07:39 AM
Last Post: LahoreEstate
  Power generation to rise 3,000MW by Dec Naveed Yaseen 0 2,274 05-05-2009 06:13 AM
Last Post: Naveed Yaseen
  4000 MW power capacity to be added by December 2009: PEPCO, PPIB Naveed Yaseen 0 2,371 04-07-2009 09:08 AM
Last Post: Naveed Yaseen
  Sindh: Foreign firms to be given Thar Coal project block for 1,000MW project Naveed Yaseen 0 2,818 03-18-2009 08:11 AM
Last Post: Naveed Yaseen

Forum Jump:


User(s) browsing this thread: 1 Guest(s)