Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Peshawar: Reconstruction of road Matani-Sherkera sought
09-26-2008, 08:01 AM
Post: #1
Peshawar: Reconstruction of road Matani-Sherkera sought
PESHAWAR: Angry with their elected representatives for turning a blind eye to their problems, the residents of Awami National Party stronghold Sherkera union council called upon the government to reconstruct Matani-Sherkera Road, which they said was the longstanding demand of people of the area.

“Former MPA elected from PF-10 Javed Khan Mohmand had allocated Rs11.4 million in the annual development program (ADP) for the reconstruction of the Sherkera-Matani Road in 2007, but still the fate of the road is in the doldrums,” nazim union council Sherkera, Said Amin told ‘The News’.

The nazim said the PC-1 of the road had already been prepared which was to reconstruct under Tameer-e-Sarhad programme and fund was earmarked in the ADP, but the government was yet to start work on the road.

Amin said the road had been built in 1960s by the then West Pakistan MPA, Jalalud-din Afridi. However, nobody after that bothered to repair or reconstruct it. He said the area was a stronghold of the ANP and its people voted for ANP nominees, MNA Arbab Zahir and deputy speaker of the provincial assembly Khushdil Khan.

Said Amin said despite the fact both the MNA and MPA have a say in the government affairs, the people of the area were facing various problems. He said the reconstruction of road was the longstanding demand of the area where people of Afridis, Yousafzai and Mohmand tribes are residing. He said some of the work on the road was carried out in the tenure of Muttahida Majlis-i-Amal however, work on three-kilometre road from Adezai to Sherkera was still pending, which needs to be reconstructed.

The UC nazim urged the federal and provincial governments to resolve genuine problems of the residents of the area. He said Town-IV was the most neglected town of the district Peshawar, which was faced with various problems.

Amin said the town, comprising 21 union councils, had been ignored in the past and its residents were facing various problems, including that of low voltage, loadshedding, non-availability of gas and shortage of irrigation water.

Nasrullah Khan Afridi, a school teacher, said 95 per cent population of the town had not been provided gas, however, he added the Sui Northern Gas Limited had laid pipeline passing through various union councils of the town which needs to be operationalised so that the people could get gas facility. He said since Town-IV has huge portion of land, therefore, a Hayatabad-like township could be developed on it, which would not only reduce burden on the city, but it would also usher in an era of development in the area.

Abdul Malik, a shopkeeper, said the law and order in the area was so poor that kidnapping for ransoms and incidents of dacoities were on the rise while the government had turned a deaf ear to it. He demanded of the government to establish a police post in the area to cope with the worsening law and order.

http://www.thenews.com.pk/daily_detail.asp?id=138054
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  LWMC has Launched an Operation to make Mall Road a Model road of the City LRE-Azan 0 4,179 08-09-2018 06:35 PM
Last Post: LRE-Azan
  Khaira Distributory Road that links Package 17 of Ring Road to Ferozepur Road Salman 0 10,129 11-30-2013 12:48 PM
Last Post: Salman
  Road From LOS To Multan Road, Construction Work On The Go Salman 0 12,503 09-23-2013 03:18 PM
Last Post: Salman
  Reconstruction Of LDA Plaza Gets Underway Salman 0 4,250 06-13-2013 01:31 PM
Last Post: Salman
  CDA to build flyovers at Peshawar Mor, IJP Road crossing Salman 0 5,429 04-01-2013 04:31 PM
Last Post: Salman
  CM lays foundation of Rs1.4 billion flyover,underpass at Peshawar Road Salman 0 5,348 12-03-2012 11:59 AM
Last Post: Salman
  Lahore Development News : Reconstruction Of Multan Road Salman 0 11,481 10-01-2012 12:22 PM
Last Post: Salman
  Peshawar road project delayed for want of funds Salman 0 5,348 08-13-2012 12:36 PM
Last Post: Salman
  Flyover at 6th Road sought Salman 0 3,556 08-06-2012 12:40 PM
Last Post: Salman
  Applications sought for bus rapid transit project Salman 0 4,184 07-04-2012 02:43 PM
Last Post: Salman
  LDA to widen road from Allama Iqbal Town to Multan Road Salman 0 7,839 05-29-2012 03:06 PM
Last Post: Salman
  Adyala Road reconstruction demanded Salman 0 3,556 05-07-2012 04:00 PM
Last Post: Salman
  Flood-hit areas: Balochistan seeks Rs 3.2 billion for reconstruction Salman 0 4,083 04-09-2012 12:02 PM
Last Post: Salman
  Mall Road, MM Alam Road and Gulberg to get CCTV cameras Lahore_Real_Estate 0 6,820 02-10-2012 12:39 PM
Last Post: Lahore_Real_Estate
  Reply sought in Walled City project case Lahore_Real_Estate 0 4,027 11-05-2011 04:50 PM
Last Post: Lahore_Real_Estate
  Two New Housing Schemes Start On Ferozpur Road And Raiwind Road Lahore Lahore_Real_Estate 0 14,623 05-21-2011 10:52 AM
Last Post: Lahore_Real_Estate
  Delay In Reconstruction Of FIA Building Lahore_Real_Estate 0 3,280 09-21-2010 11:51 AM
Last Post: Lahore_Real_Estate
  Road reconstruction, reopening hit snags Lahore_Real_Estate 0 2,871 09-21-2010 11:44 AM
Last Post: Lahore_Real_Estate
  World Bank to draft reconstruction plan for Pakistan Lahore_Real_Estate 0 3,501 08-12-2010 11:52 AM
Last Post: Lahore_Real_Estate
  Poor road engineering fails ITP road safety policy Lahore_Real_Estate 0 4,747 04-12-2010 01:03 PM
Last Post: Lahore_Real_Estate

Forum Jump:


User(s) browsing this thread: 1 Guest(s)