Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Rs165.2 bn Lahore Orange Line Metro Train project cleared
05-07-2015, 05:59 PM
Post: #1
Rs165.2 bn Lahore Orange Line Metro Train project cleared
ISLAMABAD: The Central Development Working Party (CDWP) has cleared the Lahore Orange Line Metro Train project worth Rs165.202 billion which will be constructed with Chinese assistance.

Seven projects worth Rs180,079.188 million, including the Lahore Orange Line Metro, were cleared in the CDWP meeting chaired by the Federal Minister Planning, Development and Reform Ahsan Iqbal.

The Lahore Orange Line Metro Train project is the Government of Punjab project from its own resources with concessional loan from the Chinese government. “It will be a landmark mass transit project for the poor people and the middle class to commute with world class facilities at affordable fare,” the minister said.

“Commercial spaces should be conceived at the metro stations architecture to help overcome the big difference in the operational cost and revenue of the mass transit. The design should also be consistent with local heritage,” he added. with local heritage”, he added.

The Lahore Orange Line Metro Train Project worth Rs165.202 billion was recommended to the Ecnec for final approval.The project envisages construction of 27.1 Km long dedicated signal free corridor for train mass transit system in Lahore. The proposed alignment of the project start from Ali Town passing through Niazbaig, Bund road, Chaubrugi, Anarkali, Lakshmi, Railway Station, UET, Shalamar Garden, Islam Park and finally terminates at Dera Gujran. The corridor will be capable of accommodating two trains running on both ways with design capacity of the system at 30,000 passengers/hr.

The minister asked the executing authority LDA (Lahore Development Authority) to ensure the completion of the mega project in record 27 months time as the period set by the Punjab government. He laid ample emphasis on transfer of technology for building the indigenous capacity to construct such mass transit system by signing MOU with the Chinese company.

Four projects worth Rs2,362.104 million were approved, three projects of Rs177,717.084 million were recommended whereas one namely Integrated Transportation Infrastructure Planning Unit was withdrawn due to lack of homework.

Provision of Academic and Allied Facilities at University of Malakand worth Rs996.317 million was approved in principle. Ahsan Iqbal stressed upon the need to construct signature buildings reflecting themes instead of ill-planned construction. Another university project of commencement of 4-year undergraduate programme in Water Resource Engineering and Petroleum Engineering at UET Taxila was also approved in principle. A committee was formed by the minister to revise the scope of the project.

Another project recommended to Ecnec was construction of 4-lane bridge across river Indus linking Layyah with Taunsa worth Rs6,976.00 million. However, it was cleared with the financing condition of two third from the provincial government of Sindh. Larkana Development Package of infrastructure projects worth 8113.084 million rupees were also cleared subject to cost rationalisation.

Construction of fall structure on Nara Canal, Re-sectioning of Ranto Canal and strengthening to NIP of Jamrao Canal mile 17-49 worth Rs227.448 million was approved by the CDWP. Energy project of government of Balochistan for feasibility study on environmental impact assessment worth Rs209.70 million was also approved in principle.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Breaking News: DHA Lahore Phase 7 Litigation Cleared, Development in Full Swing | Cur LRE-Azan 0 227 08-26-2023 02:52 PM
Last Post: LRE-Azan
  Lahore Smart City Development of the Railway Line Underpass Started Good News LRE-Azan 0 514 01-24-2023 02:53 PM
Last Post: LRE-Azan
  3 Marla Villas New Metro City Kharian BSM Developers To Book Call Lahore Real Estate LRE-Azan 0 983 04-20-2022 06:33 PM
Last Post: LRE-Azan
  Orange Line Metro Train Project Lahore Latest Development images LRE-Azan 0 5,316 05-12-2018 01:16 PM
Last Post: LRE-Azan
  Two more train sets for the Lahore Orange Line Metro Train Reach Lahore LRE-Azan 0 2,210 03-09-2018 12:22 PM
Last Post: LRE-Azan
  Pakistan Railways has started Cargo Express Train LRE-Azan 0 2,009 12-19-2017 05:20 PM
Last Post: LRE-Azan
  The 2 More Trains Will be Reached In Lahore Today of Orange Line Project Lahore LRE-Azan 0 2,370 11-10-2017 01:03 PM
Last Post: LRE-Azan
  SECP yet to finalise answers to objections on Multan Metro project Salman 0 2,154 11-09-2017 01:38 PM
Last Post: Salman
  76 Percent Work has been Completed on Lahore Orange Line Metro Train LRE-Azan 0 2,666 11-04-2017 12:29 PM
Last Post: LRE-Azan
  Metro Train Engine Reached At Lahore Salman 0 2,105 10-02-2017 06:38 PM
Last Post: Salman
  12 Orange Train stations near completion Salman 0 2,420 09-28-2017 06:01 PM
Last Post: Salman
  CPEC railway line economic zone projects face delay Salman 0 2,249 09-22-2017 06:21 PM
Last Post: Salman
  Orange Line Metro Train To Be Fully Automatic Salman 0 2,141 09-13-2017 05:08 PM
Last Post: Salman
  Project plan for Peshawar Metro Bus finalised Salman 0 2,526 02-07-2017 12:06 PM
Last Post: Salman
  Project plan for Peshawar Metro Bus finalised Salman 0 2,265 02-07-2017 11:56 AM
Last Post: Salman
  Orange Line Metro Train (Progress) Salman 0 2,802 09-08-2016 05:04 PM
Last Post: Salman
  Underground Tunnel Progress (Metro Train Project) Salman 0 3,017 09-08-2016 12:01 PM
Last Post: Salman
  Orange Line Metro Project (Arch Bridge) Salman 0 2,914 09-06-2016 04:05 PM
Last Post: Salman
  Orange Line Train Lahore Salman 0 2,731 08-29-2016 05:37 PM
Last Post: Salman
  Orange Line Power Substation Land Singhpura Salman 0 2,537 08-02-2016 01:05 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)