Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Two more train sets for the Lahore Orange Line Metro Train Reach Lahore
03-09-2018, 12:22 PM
Post: #1
Two more train sets for the Lahore Orange Line Metro Train Reach Lahore
Lahore Orange Line Metro Train (OLMT)

LAHORE: Two more train sets for the Lahore Orange Line Metro Train (OLMT) project reached Pakistan. A total of 21 trains have reached Pakistan so far, said Punjab Chief Minister’s Advisor and OLMT Steering Committee Chairman Khawaja Ahmad Hassaan.

After successful completion of elevated viaduct section of the OLMT package-1 (from Dera Gujjran, GT Road to Chaburji), Hassaan said. He added that now the focus has been shifted to project’s package-2 (from Chaburji to Ali Town) where efforts have been geared up for completion of remaining construction work of viaduct during the next week.
He highlighted that so far 772 out of the total 804 u-tub girders have been installed on package-2, along with a 13-kilometer stretch. The remaining 32 u-tub girders would be fixed on transoms during next week. Construction of 13 elevated metro train stations along this stretch has also been completed to a great extent where average 80% of development works have been accomplished on each station.

He said Chinese contractors, CR-NORINCO, have also deputed additional workforce for carrying out civil works at these places at a faster pace in order to complete development task at the earliest.

National Engineering Services Pakistan (NESPAK) General Manager Salman Hafeez told meeting participants that so far 85.9% civil works of the project have been completed. The progress of work on package-1 is 89.99%, on package-II 79%, on depot near Dera Gujjran 86.55% and on stabling yard near Ali Town, it has touched 87.83%. Progress on electrical and mechanical work on the project has reached nearly 47%, he maintained.

The meeting participants were told that half of the work for construction of the roof of underground General Post Office (GPO) station has so far been completed while remaining work would be completed within the next few days for opening the GPO Chowk for traffic by March 31. The GPO station is eight meters below the ground level and spread over an area of 22 kanals.

Anarkali Station’s 3D model, inspired by Mughal architecture, was also displayed to the meeting participants. The Anarkali Station is being rapidly constructed at Jain Mandar Chowk.

Hassaan directed the NESPAK and Parks and Horticulture Authority for chalking out a

comprehensive plan for beautification and traffic circulation in the busy commercial areas surrounding these two stations.

Lahore Development Authority (LDA) Chief Engineer Asrar Saeed, Traffic Engineer and Transport Planning Agency’s (TEPA) Chief Engineer Mazhar Hussain Khan, senior officials of LESCO

Source:
https://tribune.com.pk/story/1653964/1-o...ch-lahore/
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Lahore Smart City Development of the Railway Line Underpass Started Good News LRE-Azan 0 530 01-24-2023 02:53 PM
Last Post: LRE-Azan
  3 Marla Villas New Metro City Kharian BSM Developers To Book Call Lahore Real Estate LRE-Azan 0 996 04-20-2022 06:33 PM
Last Post: LRE-Azan
  Orange Line Metro Train Project Lahore Latest Development images LRE-Azan 0 5,335 05-12-2018 01:16 PM
Last Post: LRE-Azan
  Pakistan Railways has started Cargo Express Train LRE-Azan 0 2,019 12-19-2017 05:20 PM
Last Post: LRE-Azan
  The 2 More Trains Will be Reached In Lahore Today of Orange Line Project Lahore LRE-Azan 0 2,380 11-10-2017 01:03 PM
Last Post: LRE-Azan
  76 Percent Work has been Completed on Lahore Orange Line Metro Train LRE-Azan 0 2,676 11-04-2017 12:29 PM
Last Post: LRE-Azan
  Metro Train Engine Reached At Lahore Salman 0 2,117 10-02-2017 06:38 PM
Last Post: Salman
  12 Orange Train stations near completion Salman 0 2,432 09-28-2017 06:01 PM
Last Post: Salman
  CPEC railway line economic zone projects face delay Salman 0 2,258 09-22-2017 06:21 PM
Last Post: Salman
  Orange Line Metro Train To Be Fully Automatic Salman 0 2,153 09-13-2017 05:08 PM
Last Post: Salman
  Orange Line Metro Train (Progress) Salman 0 2,815 09-08-2016 05:04 PM
Last Post: Salman
  Underground Tunnel Progress (Metro Train Project) Salman 0 3,031 09-08-2016 12:01 PM
Last Post: Salman
  Orange Line Metro Project (Arch Bridge) Salman 0 2,924 09-06-2016 04:05 PM
Last Post: Salman
  Orange Line Train Lahore Salman 0 2,744 08-29-2016 05:37 PM
Last Post: Salman
  Orange Line Power Substation Land Singhpura Salman 0 2,545 08-02-2016 01:05 PM
Last Post: Salman
  Orange Line Metro Train Salman 0 2,703 07-25-2016 06:14 PM
Last Post: Salman
  Metro Train Construction Status Of Under Ground Track Salman 0 2,910 07-18-2016 12:25 PM
Last Post: Salman
  Metro Train Construction Updated Salman 0 3,039 07-01-2016 01:16 PM
Last Post: Salman
  Metro Train Development Update Salman 0 2,817 06-27-2016 03:49 PM
Last Post: Salman
  Orange Line Metro Train Development Status Salman 0 3,080 06-21-2016 03:51 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)