Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Karachi: DHA modifies Gizri flyover design after SHC decision
03-27-2009, 07:43 AM
Post: #1
Karachi: DHA modifies Gizri flyover design after SHC decision
The Defence Housing Authority (DHA) has announced that the design of the Gizri Flyover is being changed in light of the recent decision of Sindh High Court (SHC).

DHA Administrator Brig. Khalid Tirmizi told a representative delegation of the Defence Residents’ Society (DRS) on Thursday that the after the design of the flyover is changed, it will terminate at the Khyaban-e-Shamsheer and Khyaban-e-Hafiz intersection instead of the Total Petrol Pump.

The DRS delegation led by its president Zafar Iqbal was informed that the flyover project will be completed by December 2009. DHA’s Senior Project Director Brig. (retd) Iftikhar Hyder said that the process of addressing stipulated environmental concerns as required by the Environmental Protection Agency has been initiated.

The DHA administrator said that the repair work on the DHA Desalination Plant Project had been inordinately delayed due to a lingering financial dispute between the Cogen Company and the plant’s manufacturer. He claimed that the resolution of the dispute between the two stakeholders was getting closer, and it is hoped that the project would soon become operational.

It should be recalled here that the DHA executive board had been briefed on January 13, 2009, that the DHA Cogen desalination plant, which fell into disrepair on September 12, 2008, will restart functioning by early March this year after repair and replacement of its damaged parts.

Brig. Tirmizi said the security system in DHA and Clifton was being revamped by the DHA Vigilance Committee with the support of private security companies. He added that surveillance cameras are being stalled at 10 major entry points of the DHA.

DHA Storm Water Drainage Project Consultant Dr Lakhani said that work related to the reconstruction of damaged roads along the newly laid stormwater drains in the DHA was going on in full swing. The DHA administrator also reiterated the claim in categorical terms that the 50-kilometre-long road network being built at a cost of Rs700 million would be completed in all respects before June 30 this year positively.

Cantonment Board Clifton (CBC) Chief Executive Officer (CEO) Zeenat Ahmed informed the meeting that a survey revealed that 2500 manhole covers were missing at various locations in DHA. She added that the same are being replaced by newly manufactured versatile covers with improved specifications and strength. All open manholes in DHA will be fixed with new covers in six weeks, she concluded.

http://www.thenews.com.pk/daily_detail.asp?id=169368
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  NHA and CDA Resolve T-Chowk Design Dispute Amicably LRE-Azan 0 231 11-14-2023 02:56 PM
Last Post: LRE-Azan
  SSH, An International Construction Company, To Design Its First Signature Tower Proje LRE-Azan 0 699 02-11-2023 05:48 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project New Design is Ready LRE-Azan 0 1,383 11-20-2021 12:22 PM
Last Post: LRE-Azan
  Lahore Ring Ring Development Update : Govt considering change to Southern Loop design Salman 0 14,263 07-05-2013 02:41 PM
Last Post: Salman
  Karachi Development News : Flyover road inaugurated Salman 0 5,027 05-30-2013 06:39 PM
Last Post: Salman
  7,100 MW Bunji Dam’s detailed engineering design completed Salman 0 4,965 05-07-2013 06:37 PM
Last Post: Salman
  Flawed Interchange design to cost CDA Rs700 million Salman 0 4,204 12-28-2012 03:46 PM
Last Post: Salman
  Amended design of Mareer Chowk Railway Tunnel still awaits approval Salman 0 5,591 11-30-2012 02:14 PM
Last Post: Salman
  Foundation Stone Of Another Flyover Project In Karachi Has Been Laid Salman 0 4,369 10-17-2012 12:24 PM
Last Post: Salman
  Illegal industrial units Decision on relocation today Salman 0 4,152 10-15-2012 01:36 PM
Last Post: Salman
  Mareer Chowk underpass detailed design has been completed Salman 0 5,430 09-25-2012 03:46 PM
Last Post: Salman
  Rawalpindi Development News : Design of Railway underpasses to be handed over to RDA Salman 0 5,089 09-18-2012 02:58 PM
Last Post: Salman
  Road or no road: decision today Salman 0 3,974 07-10-2012 03:02 PM
Last Post: Salman
  Karachi Development News : Jail Chowrangi Flyover Salman 0 4,058 05-04-2012 12:51 PM
Last Post: Salman
  Shahbaz inaugurated Muslim Town Flyover (country’s largest flyover) Salman 0 5,882 04-30-2012 12:33 PM
Last Post: Salman
  Islamabad Property news :Firms fail to design Park Enclave Salman 0 4,615 03-29-2012 12:31 PM
Last Post: Salman
  Evictees protest govt’s decision to demolish Ittehad Colony Salman 0 4,451 03-08-2012 02:59 PM
Last Post: Salman
  Decision taken on Katchi Abadies’ proprietary rights Lahore_Real_Estate 0 4,332 03-01-2012 12:54 PM
Last Post: Lahore_Real_Estate
  No flaw in Cogen’s design, to become functional by end of 2012 Salman 0 4,227 02-02-2012 01:20 PM
Last Post: Salman
  Architectural planning, design of projects: Nespak accelerates pace of work Lahore_Real_Estate 0 4,428 11-02-2011 12:36 PM
Last Post: Lahore_Real_Estate

Forum Jump:


User(s) browsing this thread: 1 Guest(s)