Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Tuwairqi Steel Mills’ first phase to be completed by December’
08-11-2009, 07:23 AM
Post: #1
Tuwairqi Steel Mills’ first phase to be completed by December’
KARACHI: Tuwairqi Steel Mills Limited (TSML) first phase would be completed by end December 2009, Zaigham Adil Rizvi, Director (Projects), Tuwairqi Steel Mills Limited said.

Zaigham said that the DRI production worldwide has increased from 84.6 million tonnes in 2000, to over 132.9 million tonnes in 2008. “There is a consistent growth in the production of Direct reduced iron (DRI) over the years owing to environment-friendly production process and consistent quality of the product,” he said.

The plant, currently under-construction, spreads over an area of 220 acres at Bin Qasim Karachi and employs the world’s most advanced Direct Reduction of Iron technology of the MIDREX process owned by Kobe Steel of Japan. The first phase of the project that constitutes a DRI plant would produce 1.28 million tonnes of high-quality DRI and is targeted for completion in December, 2009.

“In the first phase of the project 100 percent equity has been put by TSML, however in second phase we need to have foreign investment,” Zaigham said.

He was of the view that currently Pakistan is among the countries that rely mostly on imports when it comes to heavy mechanical structures and engineering goods. “By producing high-quality steel within Pakistan we can manufacture such equipment locally by value addition with the help of downstream industries,” he concluded.

TSML is Pakistan’s first private sector integrated environment-friendly steel manufacturing project of Al Tuwairqi Holding.

Saleem H Mandviwalla, Minister of State/Chairman, Board of Investment (BoI) visited the project site at Bin Qasim.

In line with the vision of Al Tuwairqi Holding, the minister also emphasised the dire need and exigencies of backward and forward integration of this project. The proposal of Jet Furnace project from Germany, which is substantially cost-effective in terms of electrical energy consumption, specifically attracted the attention of the minister and he pointed that the government would fully support this effort of Al Tuwairqi to bring this

technology to Pakistan.

State minister said that $20 million facilitation has been given to Tuwairqi Steel Mills Limited. “Because of financial crunch across the world some of the banks included in (9 banks consortium) backed out from financing and financing remained shot around 40 percent”, he said.

He further said, “We, at BoI, are very sure that this project would definitely serve as the catalyst of industrial growth in Pakistan”. Expressing his satisfaction over the construction activities at site he said that, “it is a matter of great pride for us that Pakistan would be producing one of the most preferred raw materials for quality steel making - Direct Reduced Iron, upon the completion of the first phase of TSML.”

Saleem said that government is facilitating local as well as foreign investors for the industrial growth of the country besides offering them lucrative incentives. “We are expecting a significant increase in foreign investment during this fiscal year,” he maintained.

He also informed about the Special Economic Zone, which spreads over an area of 2500 acres in Dabeji, where renowned Japanese companies would commence industrial activities, which would strengthen the national economy and create a number of job opportunities.

http://www.dailytimes.com.pk/default.asp...2009_pg5_7
Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Surge in Domestic Steel Prices Linked to Escalating Raw Material Expenses LRE-Azan 0 212 01-09-2024 03:44 PM
Last Post: LRE-Azan
  Steel Prices Experience a Decline as the Rupee Gains Strength Against the US Dollar LRE-Azan 0 221 12-19-2023 02:32 PM
Last Post: LRE-Azan
  Decline in Steel Prices Continues as Pakistani Rupee Strengthens Against USD LRE-Azan 0 269 10-25-2023 05:23 PM
Last Post: LRE-Azan
  Steel Bar Prices Witness a Significant Drop, Offering Relief to the Construction Sect LRE-Azan 0 243 10-13-2023 07:53 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 353 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Good news: Margalla Avenue to be Completed ‘Very Soon’ – Chairman CDA LRE-Azan 0 845 01-21-2023 01:15 PM
Last Post: LRE-Azan
  HYDERABAD-SUKKUR MOTORWAY TO BE COMPLETED IN 2 YEARS LRE-Azan 0 674 01-18-2023 03:07 PM
Last Post: LRE-Azan
  Rawal Dam Chowk Interchange likely to be completed by June 2022 LRE-Azan 0 1,482 12-15-2021 05:48 PM
Last Post: LRE-Azan
  LOS dual carriageway to be completed by May Salman 0 4,175 01-27-2014 07:10 PM
Last Post: Salman
  CBR Town Phase-2 Islamabad Balloting on December 21, 2013 Salman 0 9,990 12-19-2013 03:11 PM
Last Post: Salman
  Property Tax Survey Completed By Excise Department Salman 0 6,199 11-19-2013 04:51 PM
Last Post: Salman
  Railway bridge project to be completed by November 30 Salman 0 10,746 10-10-2013 01:22 PM
Last Post: Salman
  All NHA projects to be completed in stipulated time: Arbab Salman 0 9,151 08-17-2013 12:55 PM
Last Post: Salman
  Pir Wadhai project to be completed by June 31 Salman 0 4,721 06-04-2013 11:38 AM
Last Post: Salman
  RDA expedites work, but project unlikely to be completed on time Salman 0 4,967 06-01-2013 03:29 PM
Last Post: Salman
  7,100 MW Bunji Dam’s detailed engineering design completed Salman 0 4,972 05-07-2013 06:37 PM
Last Post: Salman
  Work restarts, project likely to be completed next month Salman 0 4,812 04-23-2013 12:08 PM
Last Post: Salman
  Work on service roads could not be completed despite passage of deadline Salman 0 4,655 03-12-2013 07:38 PM
Last Post: Salman
  Mareer Tunnel project to be completed in time Salman 0 5,154 03-11-2013 07:51 PM
Last Post: Salman
  Mareer Chowk tunnel project to be completed by March 15 Salman 0 5,095 01-10-2013 01:25 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)