Margalla Enclave Update: Park Road Link Nears

The newest progress report on Margalla Enclave focuses on road access and site works at the Rawalpindi–Islamabad project, which covers about 20,000 kanals near the Margalla Hills. The location combines green surroundings with commercial potential, and the update tracks how infrastructure is moving toward the stated mid-2027 possession target.

Road connectivity remains central. The society is served by carpeted road networks intended to connect key parts of the capital. The route gives direct access from central Islamabad, including points near the Convention Centre and Serena Hotel, toward the enclave.

Most of the main boulevard is finished. A remaining section of about one to two kilometers is still under construction. That stretch will join Park Road through a newly built flyover, creating a more direct corridor. Completion is projected within 20 to 25 days. When it opens, travelers will no longer need the older Kuri Road route. Future planning also includes an alternative tunnel link to the Convention Centre area, which would cut commute times to minutes.

At the site, work is aligned with CDA Sector J-2. Ground infrastructure is proceeding on a 24-hour schedule, with heavy earthmovers, road rollers and supply trucks handling leveling and utility installation. Solar street lights are already in place along completed road corridors, overhead water reservoirs have been built, and initial landscaping has been added to planned green belts.

The investment case in the update centers on appreciation. According to the source, Margalla Enclave has shown high appreciation and profit margins while many regional projects face slowdowns. Ground-level valuations point to capital gains over the medium term. A baseline investment of PKR 1.5 crore could yield more than PKR 1.25 crore to 1.5 crore within 12 to 18 months, driven by infrastructure handovers and possession timelines. Plot options include 5 marla, 10 marla and 1 kanal, with larger plots offering proportionate upside as amenities, road links and sector integration are completed.