Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Caved in roads threaten China Chowk underpass
02-25-2013, 03:56 PM
Post: #1
Caved in roads threaten China Chowk underpass
ISLAMABAD, Feb 22: Only a few weeks after other, similar incidents, a new portion of the road linked to the China Chowk underpass has caved in.

Beyond the traffic jams and detours, residents, businessmen and government officials suggest that this pattern indicates poor policies and planning on the part of the CDA.

According to an official from the Engineering Wing, the link road on Fazal-e-Haq road “caved in a few days back”. So far, there have been no signs or reflectors placed nearby to warn drivers of the danger.

The engineering official said: “We were forced to close this portion of the road with small blocks, not the big ones, to warn commuters away from the damaged portions – there was no other option.”

The flyover at China Chowk, an official from the Finance Wing said, has become “a nuisance” for the Engineering Wing. The underpass was built at a cost of Rs700 million, between 2005 and 2007.

During those two years, he said, the CDA spent a total of over Rs20 billion on various development projects including roads, flyovers and underpasses.

“Now both the link roads are closed,” he said, referring to the Jinnah Avenue link road, which caved in a week ago. “The bridge is more congested every day.” A 10-metre long portion of road near the Polyclinic also caved in a few weeks ago, disrupting traffic and threatening the underpass.

“This situation is disturbing,” the official said. He recommended that CDA Chairman Syed Tahir Shahbaz and CDA board members visit the site soon. They should then forward the matter to a committee, which should be asked to submit a report within a few days.

The CDA spokesman, Ramzan Sajid, said: “Both the portions of the road caved in at the same time, I guess.” Saying that officials from the Engineering and Roads Divisions were “actively working” on the matter, he said it would be resolved within a week.

When asked about similar promises made by the CDA regarding the collapse of the road near Polyclinc, he blamed the rain for the slow repairs.

Comments from city residents, however, suggest that many are losing patience with the CDA, especially given the cost of these constructions.

“Why are portions of the roads connected to the underpass caving in so often?” asked the owner of a medical store, near China Chowk’s damaged partition.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Deadline Set for the Opening of Shahdara Chowk and Ravi Bridge LRE-Azan 0 650 01-04-2024 01:58 PM
Last Post: LRE-Azan
  Deadline Set for Completion of Ghora Chowk and Cavalry Ground Projects in Lahore LRE-Azan 0 629 11-18-2023 04:09 PM
Last Post: LRE-Azan
  NHA and CDA Resolve T-Chowk Design Dispute Amicably LRE-Azan 0 559 11-14-2023 02:56 PM
Last Post: LRE-Azan
  Traffic Plan Amid Cavalry Chowk Underpass Construction Issued LRE-Azan 0 640 09-12-2023 05:47 PM
Last Post: LRE-Azan
  Margalla Town Underpass Construction Will Resume, According To CDA LRE-Azan 0 1,073 03-07-2023 04:12 PM
Last Post: LRE-Azan
  PCBDDA Plans to Open Kalma Chowk Underpass by February 2023 LRE-Azan 0 1,044 01-25-2023 02:06 PM
Last Post: LRE-Azan
  Lahore Gulberg to Defence Chowk to be Made 5km Signal Free Corridor LRE-Azan 0 1,492 01-01-2022 06:51 PM
Last Post: LRE-Azan
  Chief Minister Punjab (CM) Sardar Usman Buzdar has Launched the Gulab Devi Underpass LRE-Azan 0 1,609 12-27-2021 09:03 PM
Last Post: LRE-Azan
  Rawal Dam Chowk Interchange likely to be completed by June 2022 LRE-Azan 0 1,765 12-15-2021 05:48 PM
Last Post: LRE-Azan
  Lahore: Shadra Flyover And Band Road Underpass Approved LRE-Azan 0 1,547 12-02-2021 07:51 PM
Last Post: LRE-Azan
  Commercialisation: LDA to assume control of buildings on 147 roads Salman 0 5,015 03-20-2014 02:54 PM
Last Post: Salman
  Flyover on Azadi Chowk : LHC extends stay against demolition Salman 0 4,959 02-26-2014 10:23 PM
Last Post: Salman
  Rs. 1.5 billion Allotted For Azadi Chowk Flyover Salman 0 5,976 02-07-2014 07:34 PM
Last Post: Salman
  Work on Azadi Chowk Interchange, New Circular Road Project starts Salman 0 8,674 01-16-2014 01:55 PM
Last Post: Salman
  Mareer Chowk Railway Bridge finally becomes operational Salman 0 5,280 01-08-2014 02:43 PM
Last Post: Salman
  Underpass, not flyover, to be built near Mehran Hotel Salman 0 4,603 01-02-2014 01:25 PM
Last Post: Salman
  Cantonment areas to have signal-free roads Salman 0 5,907 12-21-2013 12:34 PM
Last Post: Salman
  LDA to install 136,000 LED lights on city roads Salman 0 7,054 12-02-2013 01:52 PM
Last Post: Salman
  LDA Plans To Install LED Lights On Roads Salman 0 6,441 12-02-2013 01:48 PM
Last Post: Salman
  Rs 1,600m approved for Azadi Chowk shifting Salman 0 9,590 11-18-2013 12:16 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)