Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Donors’ consortium to be set up for financing Basha Dam
03-10-2009, 07:52 AM
Post: #1
Donors’ consortium to be set up for financing Basha Dam
Tuesday, March 10, 2009
By Mehtab Haider

ISLAMABAD: The government will establish a consortium of all major multilateral and bilateral donors led by the Asian Development Bank (ADB) before the next budget for arranging $12.1 billion funding for the construction of Diamer-Basha Dam, it is learnt.

The World Bank (WB) may become part of the consortium for the project but it will not assume the driving seat in terms of providing funding for the multibillion dollar Basha Dam. In rupee terms, the cost of Basha Dam has been jacked up to Rs1 trillion as depreciation of rupee against dollar by 30 per cent alone increased its cost by Rs280 billion during the current fiscal year, said the official sources.

“When the rupee stood at 60 against a dollar, the cost of $12.1 billion translated into rupee was Rs720 billion, which was jacked up to around Rs1 trillion when the rupee touched 80 to a dollar,” official sources explained.

“Although, the government has not yet made official request to the World Bank for becoming part of the consortium as it is believed that the multilateral donors are not in competition with each other. When the ADB is on the driving seat the WB will not be involved up to that extent,” official sources, having knowledge about working of the multilateral donors, confirmed while talking to The News on Monday.

When Secretary Economic Affairs Division, Farukh Quayum was contacted for comments, he confirmed that the consortium of donors would be established by April 2009 in order to arrange financing for Diamer Basha Dam.

He said that the Islamic Development Bank (IDB) would also become part of the upcoming consortium for investing into Basha Dam. However, the sources said that it was understood that when the ADB would play major role in the construction of the Basha Dam other donors including the WB might become part of it but it would not play major role because these donors pursued projects in synchronization with each other.

The government, the sources said, is likely to establish donors consortium before the ministerial level meting of Friends of Pakistan in its scheduled meting of April 17, 2009 in Tokyo, enabling the donors to become part of the consortium.

The government is all set to divide Diamer-Basha Dam into two main categories for meeting financing requirements of $12.1 billion.

The tentative project cost of Diamer Basha Dam, the official document states, would be $12.1 billion, with total installed capacity of 4500 MW. There will be 12 units having capacity of 375 MW and the average annual generation of the dam will be 19000 GWH.

The Diamer-Basha Dam project is located on Indus River about 315 km upstream of Tarbela dam, 165 km downstream of Northern Areas capital Gligit and 40 km downstream of Chilas.

On the main dam, the type of the Diamer-Basha Dam will be Roller Compacted Concrete (RCC). The maximum height of the dam will be 270 m (height of its type in the world). On diversion system, there will be 2 number Diversion Tunnel (right side) and 1 number Diversion Tunnel (right side).

Regarding main spillways, there will be 14 gates and the size of gate will be 11.0 x 16.5 m. On the reservoir side, the maximum operating level of Diamer Basha Dam will be EI. 1160 m and minimum operating level of EI.1060 m. The Gross Capacity of the dam will be 9.0 BCM (7.3 Million Acre Feet (MAF). The live capacity of the dam will be 7.9 BCM (6.4 MAF).

Regarding the outlets of the Basha Dam, the technical feasibility illustrates that there will be 7 low level outlets and five sluicing. On sluicing tunnels, the Diamer-Basha Dam will have one right bank (through conversion of one diversion tunnel) and on the left bank there will be one additional tunnel.

http://www.thenews.com.pk/daily_detail.asp?id=166454
Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  SBP allows financing to dairy sector under LTFF Salman 0 3,421 03-17-2012 02:21 PM
Last Post: Salman
  Punjab banks on locals in donors conference Lahore_Real_Estate 0 3,850 09-29-2010 01:35 PM
Last Post: Lahore_Real_Estate
  Donors' conference in October: Kaira Lahore_Real_Estate 0 3,642 08-25-2010 12:21 PM
Last Post: Lahore_Real_Estate
  Germany to start financing renewable energy in Pakistan Lahore_Real_Estate 0 3,422 05-08-2010 11:40 AM
Last Post: Lahore_Real_Estate
  Land acquisition cost of Basha Dam rises to Rs32bn LRE 0 3,636 02-28-2010 06:25 PM
Last Post: LRE
  America Financing Both Sides in Afghanistan; Blackwaters after "Big Target" LRE 0 4,033 01-12-2010 09:45 PM
Last Post: LRE
  State Bank allows easy financing of small renewable power projects upto 10 MW Naveed Yaseen 0 4,585 12-02-2009 09:19 AM
Last Post: Naveed Yaseen
  Abu Dhabi power project secures $2.15 bln financing LahoreEstate 0 3,497 10-20-2009 09:08 AM
Last Post: LahoreEstate
  Govt to seek Chinese financing for replacing satellite LahoreEstate 0 3,319 08-30-2009 06:33 AM
Last Post: LahoreEstate
  KSE: Margin financing may be launched next week Naveed Yaseen 0 3,535 08-21-2009 06:22 AM
Last Post: Naveed Yaseen
  ECNEC approves 24 projects including Diamer-Basha Dam Naveed Yaseen 0 3,428 08-21-2009 05:50 AM
Last Post: Naveed Yaseen
  IP gas pipeline project: Chinese and Abu Dhabi-based firms offer financing: Asim Naveed Yaseen 0 3,391 07-12-2009 08:23 AM
Last Post: Naveed Yaseen
  WB refuses to finance Basha dam ! LRE 0 2,673 06-24-2009 01:37 PM
Last Post: LRE
  WB refuses to finance Basha dam, ADB demands consensus resolution by parliament Naveed Yaseen 0 2,649 06-24-2009 06:18 AM
Last Post: Naveed Yaseen
  'Taliban raise money through extortion, drugs, Al-Qaeda through donors' Naveed Yaseen 0 3,384 06-22-2009 07:56 AM
Last Post: Naveed Yaseen
  Shell Pakistan wins corporate donors award LahoreEstate 0 3,033 04-15-2009 08:39 AM
Last Post: LahoreEstate
  Furniture and pharmaceutical sectors: SBP extends long-term financing facility LahoreEstate 0 2,786 03-17-2009 08:26 AM
Last Post: LahoreEstate
  ADB to double assistance up to $3bn To finance Diamer-Basha dam LahoreEstate 0 2,808 02-27-2009 10:15 AM
Last Post: LahoreEstate
  Consortium for Gwadar rail link proposed LahoreEstate 0 2,974 02-14-2009 10:54 AM
Last Post: LahoreEstate
  Dams being built by India on River Indus pose danger to N Areas, Basha Dam, KKH Naveed Yaseen 0 3,607 02-14-2009 08:55 AM
Last Post: Naveed Yaseen

Forum Jump:


User(s) browsing this thread: 1 Guest(s)