Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Karachi: City receives over 140mm rain, 20 killed
07-19-2009, 05:39 AM
Post: #1
Karachi: City receives over 140mm rain, 20 killed
By Azeem Samar

Karachi

The city received over 140 millimetres of rain in the first spell of monsoon showers on Saturday, collapsing the city’s infrastructure and wrecking havoc with civic life, inundating several major and minor arteries as well as causing numerous power outages.

The Meteorological Department’s observatory at Karachi Airport recorded 140mm of maximum rainfall till midnight. Earlier, the model observatory at Gulistan-e-Jauhar recorded 93.2 millimetres rain, while 82 millimetres (mm) rain were recorded at Gulshan-e-Hadeed. Till 6pm on Saturday, the Landhi observatory of Met office had recorded 77 mm rain, 37 mm rain at PAF Faisal, Masroor Base recorded 56 mm rain, at Meteorological Complex University Road 15.2 mm rain, and 64.6 mm rain in Saddar. The Met office recorded 28.5 degree Centigrade and 25.5 degree C maximum and minimum mercury-levels in the city with 92 per cent humidity.

Rain started in the wee hours of Saturday, and continued throughout the day in the form of downpour or intermittent drizzle. A major spell of rain took place after 3pm on Saturday, and then again shortly after 10pm.

The latter spell especially crashed telecommunication, drainage, and electricity systems across the metropolis, with several grid stations going offline and hundreds of feeders shutting down electricity to a number of areas. Several motor vehicles fell into disrepair on almost every major artery of the city, with a number of rain-related causalities also being reported.



Collapse of civic infrastructure

Inundation of streets, alleys and roads took place in every locality of the city, with various municipal authorities in the city including those under the jurisdiction of City District Government Karachi (CDGK), different cantonment boards, and other land controlling authorities in the city, starting de-watering operations in various affected areas. However, the task of clearing accumulated rainwater is stated to take at least a couple of days to complete.

A number of important arteries in the city were inundated following the downpour. The track starting from Jahangir Road to Teen Hatti Bridge, and then onwards to Gurumandir was completely blocked due to overflowing rainwater. All roads leading up to and around Saddar were also severely flooded, while a similar situation was witnessed at several points along MA Jinnah Road, including Purani Numaish. Accumulated rainwater could also be at the refurbished Sharea Faisal, including at Regent Plaza and some areas between Jinnah Terminal turning and Star Gate. Reports of severe flooding were also received from villages in and around Gadap and Bin Qasim towns.

The areas under the jurisdiction of Cantonment Board Clifton (CBC) and Defence Housing Authority (DHA), where a new storm water drainage system has been recently installed, also witnessed flooding and overflowing rainwater, especially in the low-lying parts of the cantonment. Pools of standing rainwater especially developed around parts of Khayaban-e-Badban, Khayaban-e-Bahria, Khayaban-e-Hilal, and Khayaban-e-Badar. DHA authorities however passed responsibility of maintenance on to CBC.

http://www.thenews.com.pk/daily_detail.asp?id=188771
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  DHA City Karachi Sub-Office will be Opened Soon in Lahore LRE-Azan 0 494 12-19-2023 02:31 PM
Last Post: LRE-Azan
  Pakistan receives US$2 billion in financial support from Saudi Arabia LRE-Azan 0 949 04-08-2023 02:21 PM
Last Post: LRE-Azan
  FBR receives details of property held by Pakistanis in UK LRE-Azan 0 4,058 07-18-2018 04:07 PM
Last Post: LRE-Azan
  DHA City Karachi Salman 0 8,956 04-01-2014 06:38 PM
Last Post: Salman
  DHA City Karachi Newspaper AD Salman 0 5,617 03-18-2014 01:54 PM
Last Post: Salman
  Thursday, February 20, 2014 - Karachi—Danish Ambassador visited DHA City Site Karachi Salman 0 5,633 02-20-2014 01:52 PM
Last Post: Salman
  DHA City Karachi: Agreement signed to establish Pakistan’s first smart city Salman 0 9,331 11-29-2013 01:13 PM
Last Post: Salman
  DHA CITY Karachi Deveopment Work Assessed By City Manangement Salman 0 12,866 11-08-2013 02:09 PM
Last Post: Salman
  DHA City Karachi Issues Tender Notice For Development Work Salman 0 12,686 10-31-2013 02:30 PM
Last Post: Salman
  CDA Receives Minor Response Form Buyers Salman 0 9,048 10-02-2013 08:04 PM
Last Post: Salman
  Lahore : Gowaha residents in trouble as rain floods Rohi Nullah Salman 0 6,048 06-19-2013 12:18 PM
Last Post: Salman
  CDA receives lacklustre response from bidders Salman 0 3,894 12-19-2012 05:25 PM
Last Post: Salman
  CDA receives healthy response to auction of plots Salman 0 4,851 11-22-2012 03:16 PM
Last Post: Salman
  Zulfikarabad city project reviewed in Karachi Salman 0 5,980 11-02-2012 04:45 PM
Last Post: Salman
  Capital rain-hit roads need maintenance Salman 0 4,645 09-24-2012 04:16 PM
Last Post: Salman
  Groundbreaking ceremony of DHA City Karachi today Salman 0 4,656 02-22-2012 12:30 PM
Last Post: Salman
  Groundbreaking ceremony of DHA City Karachi next month Salman 0 4,627 01-21-2012 11:52 AM
Last Post: Salman
  Karachi Development News : DHA City masterplan unveiled to real estate agents Salman 0 6,624 12-22-2011 12:06 PM
Last Post: Salman
  DHA City Karachi Master Plan to be Unveiled on Dec 21, Salman 0 4,303 12-20-2011 12:44 PM
Last Post: Salman
  Karachi Property News :Naya Nazimabad City Salman 0 8,541 11-20-2011 12:35 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)