Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Time to build the Malakand Tunnel
08-07-2012, 01:09 PM
Post: #1
Time to build the Malakand Tunnel
Time to build the Malakand Tunnel


ISLAMABAD - The National Highway Authority has done a feasibility study for the construction of Malakand tunnel to provide a short route for the people of Malakand, Upper Dir, Lower Dir and Swat. A Korean Company, M/s Chunil, prepared the feasibility study of the 2.9-kilometre-long tunnel. Malakand Pass lies between Dargai-Batkhela and is situated at an altitude of 470 metres and 663 metres, respectively. A tunnel is needed at this site as the existing road traverses steep gradients and dangerous winding curves with various recurring land slides. This makes movement of freight carriers difficult besides causing extra-consumption, breakdowns and accidents. It may be mentioned here that the then president of Pakistan, during his visit to Swat in 2005, had directed the Ministry of Communications to conduct feasibility for Malakand tunnel. The feasibility conducted by M/s Chunil Engineering Consultants of South Korea studied three alignments. The recommended alignment envisages Dargai as starting point of the tunnel and Batkhela as end point. It also envisages road tunnels of 3.172km, two-lane 8.663km road and three bridges of 152.5 metres on each carriageway.
PC-1 for Phase-I, including design, construction and supervision of Rs 9.043 billion was approved by ECNEC in May 2011. In November 2011, a meeting between representatives of Exim Bank of South Korea, Economic Affairs Division, Ministry of Communications and NHA was held in which financing of the project was agreed upon and Exim Bank showed its readiness to provide $ 78 million loan for the purpose. The tunnel will provide a short route not only to people of Dir, Malakand and Swat and adjacent localities but would also be an easy access to Central Asian States, providing the market access to the country for its products.
The National Highway Authority has opined that at the time when Lowari tunnel is being constructed, it would not be much useful to start work on Malakand tunnel. However, the public representatives of the areas think otherwise. Talking to APP, Awami National Party Senator Zahid Khan said that Malakand tunnel was not less important than the Lowari tunnel. If Lowari tunnel provides all-weather road access to the people of only district Chitral, Malakand tunnel will prove an alternate short route to the people of four districts.
Pakistan Muslim League-Nawaz Senator Nisar Muhammad was of the view that linking Malakand tunnel to the completion of Lowari tunnel was unfortunate. He said that if a donor was ready to invest in this project, the NHA should start work on this project, otherwise the loan offer may be withdrawn as Korea may not be ready to shift the amount towards Lowari tunnel.
In January, Korean government had pledged $78 million through Economic Development Cooperation Fund (EDCF) for the construction of a 9.7 km Malakand Tunnel project. The loan provided by Korea was to be administrated by Exim Bank of Korea having nominal interest rate of 0.1 percent per annum with maturity period of 40 years including a grace period of 10 years.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  CDA Plans to Build Affordable Hostels in Islamabad LRE-Azan 0 997 02-11-2023 05:48 PM
Last Post: LRE-Azan
  When the right time's to invest in Pakistan property? LRE-Azan 0 4,370 09-15-2018 02:06 PM
Last Post: LRE-Azan
  Chinese Company Contracted To Build Pakistan Largest Airport Salman 0 5,195 07-13-2017 04:38 PM
Last Post: Salman
  Rawalpindi Development Authority to build 31-storey tower CMY 0 5,741 12-28-2013 08:53 AM
Last Post: CMY
  NHA to build new motorways, expressways Salman 0 8,131 10-30-2013 01:36 PM
Last Post: Salman
  Lowari Tunnel – Construction Work Expected To Complete In Three Years Salman 0 6,215 10-23-2013 12:23 PM
Last Post: Salman
  No plan to build 'new Islamabad' on the cards: CDA chief tells Senate body Salman 0 10,118 10-05-2013 12:10 PM
Last Post: Salman
  SC takes suo motu notice of Margalla Hills Tunnel Project Salman 0 6,311 09-30-2013 03:44 PM
Last Post: Salman
  CDA to build 44-kilometre-long cycling track in Islamabad Salman 0 6,167 09-30-2013 03:42 PM
Last Post: Salman
  Pak to build twin capital across Margalla Hills Salman 0 7,102 09-13-2013 01:19 PM
Last Post: Salman
  Authorities Plan To Build Underpasses And An Overhead Bridge In The DHA Lahore Salman 0 8,646 09-12-2013 08:22 PM
Last Post: Salman
  CDA to build more parks, playgrounds Salman 0 6,323 08-28-2013 11:48 AM
Last Post: Salman
  All NHA projects to be completed in stipulated time: Arbab Salman 0 9,430 08-17-2013 12:55 PM
Last Post: Salman
  RDA expedites work, but project unlikely to be completed on time Salman 0 5,298 06-01-2013 03:29 PM
Last Post: Salman
  CDA to build flyovers at Peshawar Mor, IJP Road crossing Salman 0 6,042 04-01-2013 04:31 PM
Last Post: Salman
  Mareer Tunnel project to be completed in time Salman 0 5,466 03-11-2013 07:51 PM
Last Post: Salman
  Mareer Chowk tunnel project to be completed by March 15 Salman 0 5,350 01-10-2013 01:25 PM
Last Post: Salman
  Amended design of Mareer Chowk Railway Tunnel still awaits approval Salman 0 5,885 11-30-2012 02:14 PM
Last Post: Salman
  Work on Mureer Tunnel to start by month-end Salman 0 5,060 11-19-2012 12:15 PM
Last Post: Salman
  Marrer Tunnel construction to start soon Salman 0 4,595 11-12-2012 12:41 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)