Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Rawalpindi: Benazir Bhutto Shaheed Road: CTP’s signal-free plan draws a blank
10-14-2008, 05:40 AM
Post: #1
Rawalpindi: Benazir Bhutto Shaheed Road: CTP’s signal-free plan draws a blank
By Imran Asghar
RAWALPINDI: The City Traffic Police’s (CTP) experiment to make Benazir Bhutto Shaheed Road signal-free has gone down like a lead balloon, as the road and its links roads could be seen chock-a-block with traffic all the time causing wastage of time and fuel and botheration to the motorists.

During a visit to Murree Road, Saidpur Road, Sadiqabad Road, Double Road and 5th and 6th Road on Monday, Daily Times found that there’re long lines of vehicles parked bumped to bumper, with traffic wardens manually controlling the traffic at some places where the traffic filters were out of order.

Several motorists and cabbies complained that closure of crossings at Chandni Chowk, 5th and 6th Road and Double Road was causing long snarl-ups. They were of the view that the link roads of Benazir Bhutto Shaheed Road were not so wide and spacious to absorb a sea of vehicles.

Muhammad Saeed, a cabbie, said that the CTP’s experiment did not match the ground realities. He said Islamabad Highway or other roads of the capital city of Islamabad could be declared signal-free because the roads there had been built keeping in mind the future requirements.

Younus Afsar, a motorist, said that the CTP’s plan had come a cropper because traffic coming from the link roads could not get directly onto Benazir Bhutto Shaheed Road. He said the experiment had benefited the motorists bound for Islamabad, but it was creating problems for the residents of Rawalpindi.

Ejaz Bashir, a motorist, said that less attention of traffic wardens to inner city roads was causing traffic jams. He said most of the roads including Saidpur Road, Asghar Mall Road, Banni Road and Jamia Masjid Road could not absorb traffic flow unless all the crossings on Benazir Bhutto Shaheed Road were reopened.

He further said that majority of the inner city roads were dilapidated and urged the CTP bosses to prepare another plan to regulate traffic.

Muhammad Yasir, a driver, said that during school hours it was hard to drive on Saidpur Road. He said Benazir Bhutto Shaheed Road could be signal-free if the CTP gave more attention to the inner city roads.

Chief Traffic Officer (CTO) Raja Riffat Mukhtar said that over 1,000 vehicles crossed each signal on Benazir Bhutto Shaheed Road in one minute and making the road signal free had proved a success.

He said lack of parking lots, congested roads, untrained drivers, slow-moving vehicles and other problems were hindering the flow of traffic on different roads of the city.

http://www.dailytimes.com.pk/default.asp...008_pg11_4
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Rawalpindi Ring Road Set for Grand Inauguration on August 14, 2024 LRE-Azan 0 1,058 01-25-2024 03:41 PM
Last Post: LRE-Azan
  Commissioner Announces Key Milestones and Schedule for Rawalpindi Ring Road Project LRE-Azan 0 1,187 01-23-2024 03:37 PM
Last Post: LRE-Azan
  Final Stages of Quetta Safe City Project Signal Progress in Counterterrorism and Poli LRE-Azan 0 556 01-19-2024 06:47 PM
Last Post: LRE-Azan
  Rawalpindi Commissioner Confirms Limited Access to Rawalpindi Ring Road for Housing S LRE-Azan 0 627 01-10-2024 06:07 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Anticipated Launch in August LRE-Azan 0 560 01-05-2024 07:12 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road (RRR) Project: 12% Completion, Anticipated Opening in August LRE-Azan 0 648 01-02-2024 06:14 PM
Last Post: LRE-Azan
  Signal-Free Walton Road Project: Tackling 18-Kilometer Infrastructure and Drainage Is LRE-Azan 0 600 12-11-2023 04:06 PM
Last Post: LRE-Azan
  Rawalpindi Master Plan Advances: Approval Granted for Land Classification Map LRE-Azan 0 483 12-05-2023 07:03 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 636 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Accelerates Towards Completion in One Year LRE-Azan 0 752 10-04-2023 07:17 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Faces Complication of Missing Land Record LRE-Azan 0 718 09-13-2023 07:36 PM
Last Post: LRE-Azan
  Good News: NHA to Restart Double-Road Construction Between Rawalpindi and Kahuta LRE-Azan 0 1,425 01-20-2023 06:23 PM
Last Post: LRE-Azan
  NHA ready to begin dualisation of Rawalpindi-Kahuta Road LRE-Azan 0 997 01-18-2023 03:04 PM
Last Post: LRE-Azan
  Lahore Master Plan News : New city centre in Gulberg a part of master plan-2050 LRE-Azan 0 1,123 01-16-2023 07:26 PM
Last Post: LRE-Azan
  Rawalpindi: Kachehri Chowk Signal Free project, Hearing of Objections Completed LRE-Azan 0 1,520 03-02-2022 06:54 PM
Last Post: LRE-Azan
  Lahore Gulberg to Defence Chowk to be Made 5km Signal Free Corridor LRE-Azan 0 1,498 01-01-2022 06:51 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Among Rs265.281bln Projects Approved By ECNEC LRE-Azan 0 2,059 12-23-2021 07:27 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project New Design is Ready LRE-Azan 0 1,675 11-20-2021 12:22 PM
Last Post: LRE-Azan
  Rawalpindi: Ring Road Project, Rs. 24 Billion Approved in PC-1 LRE-Azan 0 1,483 10-27-2021 01:04 PM
Last Post: LRE-Azan
  LWMC has Launched an Operation to make Mall Road a Model road of the City LRE-Azan 0 4,503 08-09-2018 06:35 PM
Last Post: LRE-Azan

Forum Jump:


User(s) browsing this thread: 1 Guest(s)