Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Sixth road fly over to be completed by Jan 6
01-02-2013, 12:44 PM
Post: #1
Sixth road fly over to be completed by Jan 6
RAWALPINDI - Sixth road fly over costing around Rs 1. 04 billion will be completed by January 6. Completion of this fly over would save an estimated amount of Rs 350 million annually being incurred on other resources by the government to ensure steady traffic on the interaction.
The fly over project, which was started on September 24, 2012, had reached the final phase of completion. Prior to construction of the fly over, it took every vehicle four to five minutes to cross the intersection and now the same route would be covered in a round-off time of 45 seconds.
The fly over was being constructed under the supervision of the Highway Department by contractors of the National Logistics Cell (NLC) and Habib construction company.
Work on the project had picked up pace and was set to be completed before schedule as the original time for its accomplishment was set at 120 days, but now it would be completed within a time frame of a 100 days.
Punjab Highway SE Farhat Munir said the fly over bridge was 245 metres long and the Faizabad side of the project had been completed. Ramps having a length of 100 and 115 metres have also been built on both sides of the fly over, he added.
He said payment of Rs 100 had been made to the Water and Power Development Authority (WAPDA), Sui gas, the Water and Sanitation Agency (WASA), Pakistan Telecommunication Company Limited (PTCL) and other departments on account of utility services. Meanwhile, Rs 8 million had been paid to the Rawalpindi Development Authority (RDA) for installation of signals and Rs 3 million would be spent on landscaping of the fly over, he added. In addition, 144 girders, 14 pillars and 76 piles made of concrete have been utilized in the fly over project, he informed.
It is important to mention here that the sixth road venue would become a signal free intersection with the completion of this fly over project
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 636 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Good news: Margalla Avenue to be Completed ‘Very Soon’ – Chairman CDA LRE-Azan 0 1,200 01-21-2023 01:15 PM
Last Post: LRE-Azan
  HYDERABAD-SUKKUR MOTORWAY TO BE COMPLETED IN 2 YEARS LRE-Azan 0 900 01-18-2023 03:07 PM
Last Post: LRE-Azan
  Rawal Dam Chowk Interchange likely to be completed by June 2022 LRE-Azan 0 1,767 12-15-2021 05:48 PM
Last Post: LRE-Azan
  LWMC has Launched an Operation to make Mall Road a Model road of the City LRE-Azan 0 4,503 08-09-2018 06:35 PM
Last Post: LRE-Azan
  LOS dual carriageway to be completed by May Salman 0 4,431 01-27-2014 07:10 PM
Last Post: Salman
  Khaira Distributory Road that links Package 17 of Ring Road to Ferozepur Road Salman 0 10,602 11-30-2013 12:48 PM
Last Post: Salman
  Property Tax Survey Completed By Excise Department Salman 0 6,488 11-19-2013 04:51 PM
Last Post: Salman
  Railway bridge project to be completed by November 30 Salman 0 11,007 10-10-2013 01:22 PM
Last Post: Salman
  Road From LOS To Multan Road, Construction Work On The Go Salman 0 12,784 09-23-2013 03:18 PM
Last Post: Salman
  All NHA projects to be completed in stipulated time: Arbab Salman 0 9,430 08-17-2013 12:55 PM
Last Post: Salman
  Pir Wadhai project to be completed by June 31 Salman 0 4,923 06-04-2013 11:38 AM
Last Post: Salman
  RDA expedites work, but project unlikely to be completed on time Salman 0 5,298 06-01-2013 03:29 PM
Last Post: Salman
  7,100 MW Bunji Dam’s detailed engineering design completed Salman 0 5,201 05-07-2013 06:37 PM
Last Post: Salman
  Work restarts, project likely to be completed next month Salman 0 5,118 04-23-2013 12:08 PM
Last Post: Salman
  Work on service roads could not be completed despite passage of deadline Salman 0 4,848 03-12-2013 07:38 PM
Last Post: Salman
  Mareer Tunnel project to be completed in time Salman 0 5,465 03-11-2013 07:51 PM
Last Post: Salman
  Mareer Chowk tunnel project to be completed by March 15 Salman 0 5,350 01-10-2013 01:25 PM
Last Post: Salman
  Sixth Road flyover opened to traffic Salman 0 4,520 01-07-2013 12:27 PM
Last Post: Salman
  Sixth Road Flyover likely to be completed in five days Salman 0 4,935 01-01-2013 07:05 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)