Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Karachi: Signal-Free Corridor-III will greatly improve traffic flow: Kamal
03-02-2009, 06:02 AM
Post: #1
Karachi: Signal-Free Corridor-III will greatly improve traffic flow: Kamal
By Irfan Aligi
KARACHI: Talking exclusively with Daily Times, prior to his departure to Houston, USA, City Nazim Mustafa Kamal has highlighted the features and benefits of the Signal-Free Corridor-III, which will be constructed at a total cost of Rs 2.25 billion.
The total length of the corridor will be 16.7 km, the width of the roads will be 13.85 meters, with four lanes and two service roads on each side. The corridor will further comprise of 23 bus stops and 10 pedestrian bridges and will be provided electricity using 12-metre high poles and a drain will be made using an inlet chamber. He said that the City District Government Karachi (CDGK) is trying to provide relief to the people of the city by developing the Signal Free Corridor-III, which is aimed at improving the traffic flow in the city.
Kamal, while explaining the theory for erecting mega structures such as the signal free corridors, said that frequent traffic jams on various points at MA Jinnah Road have been brutally testing the nerves of the people for the past 40 years and during the summers the people face even more problems, especially those who travel in buses and coaches.
Even after constructing underpasses and flyovers, a lot was left to be done to ease the flow of traffic, as at least, 600 cars travel on the roads recklessly. The basic problem is that neither the MA Jinnah Road nor Sharah-e-Faisal can be expanded nor are there are any alternate routes that can be utilised. Therefore, the only way out was to construct as many under passes, flyovers and signal free corridors in the city as possible.
“We have made two signal free corridors and now will add the third corridor, which will really be a milestone in the history of the city,” said Kamal.
He added that the construction of the double track Preedy Street will cost Rs 203 million and it will be completed in six months. The length of the street will be 2.20-km and it will have a width of 52 to 58 feet. Kamal went on to say that, the Signal Free Corridor-III will link the main city centre to the suburban areas of Gulistan-e-Jauhar. It will start from Preedy Street in Saddar Town and will lead to Safura Goth via the new MA Jinnah Road to University Road.
The corridor-III project, consisting of four flyovers including one at Jail Chowrangi, one at NIPA with an elevated u-turn, one at Abul Hassan Esphahani Road and one at Samama Shopping Centre, will provide immediate relief to more than two million citizens. A double track road will be built from Saddar Dawa Khana to Preedy Street to Quaid’s Mausoleum to Jail Chowrangi.
The construction of an interchange at Jail Chowrangi will cost Rs 951.79 million and will be completed in six months. The bridge portion will measure 212 meters, while the left and right side loops will measure 152 meters and 202 meters, respectively. There will be four up ramps, including a ramp measuring 192 meters at Shaheed-e-Millat Road, 152 meters at Kashmir Road, 248 meters at PIB Colony and 200 meters at University Road.

http://www.dailytimes.com.pk/default.asp...09_pg12_10
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  CM Naqvi Drives Forward Controlled Access Corridor Band Road Project in Lahore LRE-Azan 0 1,008 01-24-2024 06:40 PM
Last Post: LRE-Azan
  Final Stages of Quetta Safe City Project Signal Progress in Counterterrorism and Poli LRE-Azan 0 556 01-19-2024 06:47 PM
Last Post: LRE-Azan
  The China-Pakistan Economic Corridor (CPEC) Achieves Milestones: 36 Projects Worth US LRE-Azan 0 642 01-06-2024 05:23 PM
Last Post: LRE-Azan
  Signal-Free Walton Road Project: Tackling 18-Kilometer Infrastructure and Drainage Is LRE-Azan 0 600 12-11-2023 04:06 PM
Last Post: LRE-Azan
  IJP Road to open to traffic by the end of month LRE-Azan 0 938 01-26-2023 03:05 PM
Last Post: LRE-Azan
  Rawalpindi: Kachehri Chowk Signal Free project, Hearing of Objections Completed LRE-Azan 0 1,520 03-02-2022 06:54 PM
Last Post: LRE-Azan
  Lahore Gulberg to Defence Chowk to be Made 5km Signal Free Corridor LRE-Azan 0 1,498 01-01-2022 06:51 PM
Last Post: LRE-Azan
  Rs21.814b signal-free Islamabad Highway corridor Salman 0 4,695 04-09-2015 04:15 PM
Last Post: Salman
  Govt gives green signal to Leh Expressway project Salman 0 4,960 02-20-2014 01:52 PM
Last Post: Salman
  Cantonment areas to have signal-free roads Salman 0 5,910 12-21-2013 12:34 PM
Last Post: Salman
  CDA to ensure hassle-free process for auction of plots Salman 0 6,524 11-18-2013 12:22 PM
Last Post: Salman
  Prime Minister Approves Pak-China Trade Corridor Salman 0 10,022 08-17-2013 12:56 PM
Last Post: Salman
  Newly constructed flyover closed for traffic Salman 0 4,197 06-05-2013 06:40 PM
Last Post: Salman
  Sixth Road flyover opened to traffic Salman 0 4,521 01-07-2013 12:27 PM
Last Post: Salman
  Modern traffic signals vital for smooth traffic flow’ Salman 0 4,749 01-03-2013 06:17 PM
Last Post: Salman
  Kalma Chowk closed for traffic Salman 0 4,629 12-19-2012 05:23 PM
Last Post: Salman
  Urban development: LDA approves Rs3b project for signal-free Qurtaba Chowk Salman 0 4,816 12-10-2012 12:29 PM
Last Post: Salman
  CM for smooth flow of traffic on MBS route Salman 0 4,543 11-30-2012 02:16 PM
Last Post: Salman
  4 flyovers to make traffic signal-free Salman 0 5,035 11-27-2012 03:15 PM
Last Post: Salman
  Efforts urged to maintain Islamabad polio free Salman 0 3,923 10-06-2012 11:16 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 2 Guest(s)