Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Karachi: CDGK starts channelisation of Gujjar Nullah
08-18-2009, 06:55 AM
Post: #1
Karachi: CDGK starts channelisation of Gujjar Nullah
City District Government Karachi (CDGK) has, as of Tuesday, started the channelisation of the 13.5km-long Gujjar Nullah as well as the removal of encroachments along the drain.

The project which has an estimated cost of Rs2,700 million would include the construction of a 24-foot wide service road on either side of the Nullah. Engineer Sajid Usmani has been appointed as project director for this job.

Earlier, in a meeting chaired by City Nazim, Syed Mustafa Kamal, it was decided to launch an anti-encroachment operation at Gujjar Nullah, one of the city’s main drains. The meeting was attended by DCO Karachi, Javed Hanif; Town Nazim North Nazimabad, Mumtaz Hameed; Town Nazim North Karachi, Akhtar Hussain; Town Nazim Gulberg, Javed Malik; Town Nazim Liaquatabad, Hafiz Usama Qadri; EDO Revenue, Sajjad Abbasi; and other officers.

Addressing the meeting, Kamal said that the Gujjar Nullah was now virtually blocked due to encroachments along both sides of the drain, which had left a narrow passage not sufficient enough to allow heavy de-silting machinery to Work along the Nullah. He said that after rain water failed to flow through Gujjar Nullah smoothly, the subsequent overflowing caused accumulation of water in the adjoining areas - made up of at least four towns - including underpasses.

As a consequence millions of residents of Liaquatabad, North Nazimabad, Gulberg and North Karachi Town had to face difficulties during heavy rains. “Now, in order to provide relief to the people living in these areas, it has been decided to start work on the channelisation and construction of roads on both sides of the Gujjar Nullah on preferential basis,” the city Nazim said. He also directed that work should begin in all four towns simultaneously so that the project could be completed as soon as possible.

Kamal further said that in the first phase a 24 feet wide road would be constructed on either side of the drain along with the Reinforced Cement Concrete (RCC) wall on the edges while concrete support will be provided in the second phase.

He also instructed the Revenue and Works & Services Department to chalk out a joint strategy for the anti-encroachment operation in coordination with the towns’ administrations. The city Nazim said that the channelisation of Gujjar Nullah would solve the storm water and sewage-related problems of adjoining areas while it would also give a new way at the edges for the drainage needs of the Lyari Expressway.

http://www.thenews.com.pk/daily_detail.asp?id=193553
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Capital Administration Starts Surveying Nullahs In Islamabad Salman 0 4,789 03-26-2014 06:05 PM
Last Post: Salman
  NAB starts probe into FGEHF plots allotment, recruitment's Salman 0 5,290 02-25-2014 01:19 PM
Last Post: Salman
  Bahria Town Karachi Booking Starts Salman 0 8,084 01-27-2014 05:23 PM
Last Post: Salman
  LDA Competes Demolition Of Illegal Constructions Along LOS Nullah Salman 0 4,745 01-02-2014 01:24 PM
Last Post: Salman
  Lahore : Gowaha residents in trouble as rain floods Rohi Nullah Salman 0 6,052 06-19-2013 12:18 PM
Last Post: Salman
  Shahbaz orders fresh feasibility study on Nullah Leh Expressway Salman 0 4,705 02-26-2013 11:39 AM
Last Post: Salman
  CDA starts beautification of Jubilee Park in Sector F-7 Salman 0 3,482 02-21-2013 03:19 PM
Last Post: Salman
  CDA starts computerisation of estate records Salman 0 4,193 10-24-2012 02:13 PM
Last Post: Salman
  Fence construction demanded on nullah bridge Salman 0 4,217 10-08-2012 12:29 PM
Last Post: Salman
  Infrastructure development starts in G-14 Salman 0 4,532 09-24-2012 04:17 PM
Last Post: Salman
  Flyover : commuters’ ordeal for ninety days starts on 9th Salman 0 4,620 09-07-2012 01:33 PM
Last Post: Salman
  Work on 6th Road flyover starts Salman 0 4,784 09-04-2012 02:13 PM
Last Post: Salman
  Villagers, CDA sort out issues as road starts Salman 0 4,863 08-30-2012 07:05 PM
Last Post: Salman
  Alamgir starts tour to inspect NHA projects Salman 0 3,205 06-29-2012 07:45 PM
Last Post: Salman
  Dumping on bank of Leh Nullah continues Salman 0 3,982 04-18-2012 01:34 PM
Last Post: Salman
  CDA starts demarcation of C-15, C-16 sectors Salman 0 4,778 04-14-2012 02:23 PM
Last Post: Salman
  CDA starts C-15, C-16 demarcation Salman 0 3,899 04-12-2012 01:12 PM
Last Post: Salman
  Residents demand cleanliness of Nullah Leh Salman 0 4,422 04-07-2012 12:40 PM
Last Post: Salman
  Campaign against wall-chalking starts Lahore_Real_Estate 0 3,925 02-10-2012 12:38 PM
Last Post: Lahore_Real_Estate
  CDGK Parking Plaza still under-utilised after two years, Salman 0 3,704 01-23-2012 01:29 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)