Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Chinese company: Wind mills set up in Punjab to generate power
01-17-2010, 07:02 AM
Post: #1
Chinese company: Wind mills set up in Punjab to generate power
Sunday, January 17, 2010
By Jawwad Rizvi

KALLAR KAHAR: A Chinese company, in a bid to tap the potential of wind power in Punjab, has set up four wind mills with a total capacity of producing 50 kilowatts of electricity.

Sunec Wind Power Generation (Pvt) Ltd of China has installed the wind mills in a model wind power generating farm at Pochal Khurd, 20 km from Kallar Kahar. After successful operation and getting desired results, the company will set up a 2.5-megawatt wind farm which may be operational this financial year.

Earlier, the Alternative Energy Development Board had identified a 165km-long wind energy corridor in Punjab which started from the famous tourist resort of salt range Kallar Kahar and ended at the valley of Soon Sakesar.

In the first phase, the Chinese company has completed installation of wind mills in the model farm. It is working on setting up 2.5MW-capacity wind mills by May and has plans to increase the mills that could generate 50 megawatts of power.

Talking to The News, Sunec Wind Power Generation Pakistan Director General Najib Ahmed Sharif, during a visit to the model farm, said the wind farm was situated on a mountain range 28,680 feet high, the second highest in Punjab after Murree.

Six Chinese engineers and technicians have been engaged in the project over the last one year. Najib said the total cost of the model farm was Rs27.5 million, adding work on the 2.5MW farm was in full swing as turbines had arrived from China which would be installed by the end of May.

Of the four wind mills currently installed, three have power generating capacity of 10 kilowatts each while one can produce 20 kilowatts.

Documentation process was also under way and that would be completed in the next two weeks, he said, adding the company had submitted a tariff petition to the National Electric Power Regulatory Authority (NEPRA). A power generation licence would also be awarded to the company in 15 days, he added.

Talking about the technical side of the project, he said minimum cut-in wind speed at the site was 2.4 to 3 MS (1 MS is equal to 3.6 km per hour) and maximum cut-out speed was 25 MS, equal to 120 km per hour. Thus, wind power would be generated easily.

Available historical data of the area showed that smooth winds blew throughout the day so there would not be any problem in generating wind power, he added. Najib pointed out that the Chinese would make all investment in the wind power project.

Sunec is a wind generating equipment maker in China and also sets up and operates wind farms there. The company is also working on cheap and durable solar energy solutions in Pakistan.

About problems faced by the company in setting up and running the project, the company director general said they could not be able to supply the power generated from the farm to the Pakistan Electric Power Company (PEPCO) due to load-shedding and were compelled to stop the wind mills. Because of that, he added, one turbine was damaged and the company imported the turbine again from China.

Similarly, he said, undue delay in approval of projects by different departments despite submission of all required documents was also hurting the investors who wanted to invest in the energy sector of Pakistan.

http://thenews.com.pk/daily_detail.asp?id=219083
Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Pakistan Aims to Generate USD 4.5 Billion in FY23-24 from Non-IMF Sources, Says Finan LRE-Azan 0 526 12-18-2023 02:10 PM
Last Post: LRE-Azan
  Chinese Company Official Terms Gwadar Seaport CPEC's Vital Axis LRE-Azan 0 685 08-22-2023 03:03 PM
Last Post: LRE-Azan
  Chinese Group Interested in Building an Industrial Plant in Punjab LRE-Azan 0 897 03-01-2023 08:09 PM
Last Post: LRE-Azan
  SSH, An International Construction Company, To Design Its First Signature Tower Proje LRE-Azan 0 1,004 02-11-2023 05:48 PM
Last Post: LRE-Azan
  Property transactions generate PKR 81 billion in revenue Federal Board of Revenue LRE-Azan 0 1,090 01-24-2023 03:22 PM
Last Post: LRE-Azan
  GHQ proposes strategic Gwadar oil refinery Chinese team arrive in Pakistan LRE-Azan 0 1,015 01-21-2023 12:17 PM
Last Post: LRE-Azan
  Chinese govt rolls out scholarships for Pakistani students LRE-Azan 0 4,762 11-07-2017 03:54 PM
Last Post: LRE-Azan
  Chinese Ambassador Engrossed To Invest In Automobiles Accessories LRE-Azan 0 4,676 11-07-2017 03:50 PM
Last Post: LRE-Azan
  Chinese Company Contracted To Build Pakistan Largest Airport Salman 0 5,192 07-13-2017 04:38 PM
Last Post: Salman
  750 Chinese Companies Operating In Pakistan Salman 0 4,664 07-08-2017 02:40 PM
Last Post: Salman
  Foreign investment to boost economy, generate employment; PM Salman 0 4,068 02-11-2014 12:22 PM
Last Post: Salman
  Punjab sets 1,000 megawatts power generation target in a year Salman 0 7,780 08-22-2013 12:17 PM
Last Post: Salman
  Sindh Engro Coal Mining Company To Develope 6000 MW With Colabration of China Power I Salman 0 9,046 08-16-2013 12:05 PM
Last Post: Salman
  Chinese company to set up 300MW solar power plant in Cholistan Salman 0 9,847 08-03-2013 12:55 PM
Last Post: Salman
  Nandipur power project : Chinese company agrees to resume work on CM’s prodding Salman 0 7,215 07-06-2013 05:19 PM
Last Post: Salman
  Agreement signed to hand over Gwadar Port to Chinese company Salman 1 13,555 02-20-2013 02:15 AM
Last Post: LRE
  Chinese firms willing to invest in Pakistan Salman 0 5,045 12-07-2012 12:31 PM
Last Post: Salman
  German investment in Punjab power projects safe: Shahbaz Salman 0 4,996 10-06-2012 11:15 PM
Last Post: Salman
  PSA Sold Gwadar Port Rights to Chinese Company @ $ 288.00 Million LRE 0 8,337 08-31-2012 09:29 PM
Last Post: LRE
  Gwadar port to be taken over by Chinese company: Minister informs Senate body | Pak Navy Asked to Vacate Land LRE 3 13,973 08-30-2012 10:49 PM
Last Post: LRE

Forum Jump:


User(s) browsing this thread: 1 Guest(s)