Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Four-hour load shedding in industrial areas announced
02-02-2011, 02:54 PM
Post: #1
Four-hour load shedding in industrial areas announced
* Reason said to be curtailment of gas supply by SSGC

KARACHI: The Karachi Electric Supply Company (KESC) on Tuesday announced four-hour-long load shedding every day for the feeders of two industrial areas, till the gas supply to the power-generating units is not resumed.

The industrial feeders have generally been divided into two groups - one belonging to Korangi and the other to SITE. The first group will experience load shedding from 4pm to 8pm while the other group from 6pm to 10pm. The industrial load shedding would continue till the gas supply to KESC is restored.

Although the KESC has never received full supply of gas as per its approved quota of 276 million metres cubic feet per day (mmcfd), its minimum winter requirement is even less than half of this quota, that is, 110 mmcfd. The Sui Southern Gas Company (SSGC) faces a shortfall of about 80 mmcfd due to technical fault in different gas fields located in Sindh.

A spokesman of SSGC said in a statement, the Bhit gas field operated by ENI developed a technical fault in its compressor, which forced the field to reduce gas supply by 50 mmcfd. Normally, Bhit gas field supplies 340 mmcfd gas to SSGC. The ENI will take two days to repair the fault, after which the supply will return to normal.

Additionally, as a result of a major power breakdown at the Zamzama gas field, operated by BHP, the gas production came to a halt at 12:30pm. Zamzama injects about 210 mmcfd to the SSGC’s system. Gas injection re-started at about 1:45pm and would take five to six hours to normalise.

After carefully reviewing the situation, SSGC’s Gas Load Management Committee decided to reduce gas supply to KESC from 80 mmcfd to 50 mmcfd till the normalisation of gas supply from the effected gas fields.

SSGC assures domestic and bulk customers that as soon as the supply position improves, the company will restore normal gas supply to the KESC.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Application Deadline Announced for Shops in Lahores Grand Souq CBD LRE-Azan 0 596 11-18-2023 04:12 PM
Last Post: LRE-Azan
  Increase in Profit Rates for National Savings Schemes Announced LRE-Azan 0 509 11-02-2023 06:34 PM
Last Post: LRE-Azan
  FBR Instructed to Real-Time Valuation of Properties in Upscale Areas LRE-Azan 0 572 10-17-2023 06:57 PM
Last Post: LRE-Azan
  FBR Unveils New Strategy for Taxpayer Registration in Remote Areas LRE-Azan 0 613 10-11-2023 07:14 PM
Last Post: LRE-Azan
  LDA Demolishes Illegal Buildings and Encroachments in Different Areas of Lahore LRE-Azan 0 957 08-19-2023 02:11 PM
Last Post: LRE-Azan
  Punjab Government approves Small Industrial Estate Policy 2023 LRE-Azan 0 904 04-01-2023 12:54 PM
Last Post: LRE-Azan
  Chinese Group Interested in Building an Industrial Plant in Punjab LRE-Azan 0 901 03-01-2023 08:09 PM
Last Post: LRE-Azan
  Bahria Town Karachi-2 Balloting Date Announced LRE-Azan 0 1,025 01-24-2023 03:12 PM
Last Post: LRE-Azan
  RUDA’s industrial zone emulates measures to fight pollution LRE-Azan 0 1,033 01-18-2023 02:57 PM
Last Post: LRE-Azan
  Pakistan, China ink framework agreement on industrial cooperation under CPEC LRE-Azan 0 1,783 02-06-2022 02:26 PM
Last Post: LRE-Azan
  NHA Work on 17 Road Infrastructure Projects is continuing in backward Areas LRE-Azan 0 4,904 01-17-2018 05:24 PM
Last Post: LRE-Azan
  GIEDA had Completely Ignored the Rules in allotting Commercial & Industrial plots LRE-Azan 0 5,675 01-03-2018 04:43 PM
Last Post: LRE-Azan
  LDA Announced To Hand Over Possession Of Plots In LDA Avenue 1 From 31th March Salman 0 14,433 03-26-2014 06:06 PM
Last Post: Salman
  Illegal settlements on the rise in forest areas of Islamabad Salman 0 5,250 03-18-2014 01:44 PM
Last Post: Salman
  CDA mulls shifting industrial zone Salman 0 4,778 02-26-2014 10:33 PM
Last Post: Salman
Smile Gawadar Industrial Estate Development Authority Newspaper Ad Salman 0 5,418 02-26-2014 10:16 PM
Last Post: Salman
  CDA focuses on commercial activity in industrial area Salman 0 4,716 01-20-2014 07:41 PM
Last Post: Salman
  Garments industrial zone renamed Punjab Apparel Park CMY 0 4,379 01-16-2014 09:11 AM
Last Post: CMY
  Bahria Town Announced Discount on Booking of Karachi Projects Salman 0 7,130 12-24-2013 02:32 PM
Last Post: Salman
  Cantonment areas to have signal-free roads Salman 0 5,911 12-21-2013 12:34 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)