Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Tarbela generation capacity to increase by 960MW 'soon'
06-20-2009, 08:20 AM
Post: #1
Tarbela generation capacity to increase by 960MW 'soon'
Print Facebook Digg StumbleUpon Text Size
ISLAMABAD (APP) - Federal Minister for Water and Power, Raja Pervez Ashraf said that the construction of Tarbela’s 4th extension project of 960 MW would begin soon, as Wapda had already initiated work on it after completing feasibility study and other required formalities.
Tarbela’s 4th extension hydro project will add additional electricity of 960 MW in the national system to strengthen the economy and enhance hydro generation project, the Minister said.
The total power potential of the project 2,100 MW originally which was enhanced to 3,478 MW and now it will be further enhanced to 4438 MW with the completion of Tarbela 4th Extension Project, he said.
The basic objective of the proposed project is to add more hydel power in the national system to strengthen the economy and enhance hydropower generation share, Raja Pervez Ashraf said.
Giving details of the project, he said that the Project having capacity of 960 MW by two turbines of Rated Capacity 480 MW would be initiated on priority basis aimed at enhancing hydel power generation.
The Project Tarbela 4th Extension will be built at Tarbela Dam which is situated on the Indus River at a distance of about 70 KM North West of Rawalpindi/Islamabad and about 50 KM upstream of Attock.
It may be mentioned here that Tarbela Dam Project is the capstone of the Indus Basin Plan envisaged as replacement of water previously fed by eastern rivers.
The project is considered backbone of the country’s economy and facilitates supply of irrigation water and production of power for industrial, agricultural and domestic uses. Civil works of Tarbela Dam was started in 1968 by the international contractors M/S TJV under design and supervision of M/S TAMS, was completed by 1974.


http://www.nation.com.pk/pakistan-news-n...960MW-soon
Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  FBR Set to Significantly Increase Immovable Property Valuations This Week LRE-Azan 0 79 10-23-2024 06:20 PM
Last Post: LRE-Azan
  Increase in Profit Rates for National Savings Schemes Announced LRE-Azan 0 507 11-02-2023 06:34 PM
Last Post: LRE-Azan
  Pakistan’s Cement Industry Reports Slight Increase LRE-Azan 0 954 02-08-2023 06:44 PM
Last Post: LRE-Azan
  The Dollar Price Increase In The Open Market Also Gold Price Increase Per Tola LRE-Azan 0 1,603 11-27-2021 02:28 PM
Last Post: LRE-Azan
  Rawalpindi: Huge Increase in Residential Property Commercialization Fees LRE-Azan 0 1,513 11-22-2021 08:17 PM
Last Post: LRE-Azan
  Pakistan’s first waste-to-energy plant with 40-megawatt Production Capacity LRE-Azan 0 4,460 07-18-2018 04:26 PM
Last Post: LRE-Azan
  Turkish investment: Punjab signs MoU on capacity building Salman 0 4,366 10-23-2013 12:14 PM
Last Post: Salman
  Punjab sets 1,000 megawatts power generation target in a year Salman 0 7,780 08-22-2013 12:17 PM
Last Post: Salman
  S Korean companies helping in 353MW hydropower generation Salman 0 5,116 01-17-2013 12:30 AM
Last Post: Salman
  CDA urged to use solid waste for energy generation Salman 0 4,572 07-14-2012 11:59 AM
Last Post: Salman
  CM invites Turk investment for power generation sector Salman 0 4,054 05-05-2012 12:21 PM
Last Post: Salman
  CDA committed to increase green cover in capital) Salman 0 4,582 04-30-2012 12:34 PM
Last Post: Salman
  CDA committed to increase green cover in capital Salman 0 4,471 04-14-2012 02:36 PM
Last Post: Salman
  Govt seeks Turkish cooperation in energy generation Salman 0 4,481 03-26-2012 11:43 AM
Last Post: Salman
  CDA proposes increase in property tax & water tariff Salman 0 4,489 03-20-2012 12:31 PM
Last Post: Salman
  Islamabists resent 3-time increase in plots transfer Salman 0 4,659 03-10-2012 12:29 PM
Last Post: Salman
  Electricity generation through renewable resources Salman 0 4,323 03-07-2012 12:59 PM
Last Post: Salman
  17% tax revenue increase achieved in last six months Salman 0 4,340 01-14-2012 02:52 PM
Last Post: Salman
  Wind power projects: 12 projects of 1,000 MW capacity to be functional in 2013 Salman 0 5,927 12-30-2011 03:37 PM
Last Post: Salman
  Pakistan exports increase by 7.6% during Jul-Nov 2011 Salman 0 4,300 12-21-2011 01:21 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)