Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Rawalpindi: Urban Traffic Control System to become operational after Eid
09-10-2009, 06:48 AM
Post: #1
Rawalpindi: Urban Traffic Control System to become operational after Eid
Rs 36m project to improve traffic on BBS Road:

* RDA installs six CCTV cameras, traffic signal polls from Marrir Chowk to Shamsabad
* Control room to be established at RDA offices

By Aamir Yasin

RAWALPINDI: Urban Traffic Control System (UTCS) Project worth of Rs 36 million will start functioning after Eidul Fitr, a senior official of Rawalpindi Development Authority (RDA) told Daily Times on Wednesday.

He said under UTCS Project RDA had installed traffic signal polls from Marrir Chowk to Double Road, Shamsabad. The RDA has purchased this system from a private company with five years maintenance warranty, he added.

Control room: The official said the UTCS would improve traffic flow on Benazir Bhutto Shaheed (BBS) Road. He said UTCS was used in developed countries to coordinate traffic signals, normally through a centrally located computer. He said the control room would be established at RDA offices located at Liaquat Bagh to monitor the traffic congestion.

He said there was an urgent need of UTCS to ease traffic flow on BBS Road as the number of registered vehicles in Rawalpindi and Islamabad had touched 600,000 and 100,000 figures respectively resulting in regular traffic congestion on roads.

CCTV: He said RDA had installed six close circuit television (CCTV) cameras at Marrir Chowk, Liaquat Bagh Chowk, Committee Chowk, Chandni Chowk, Rehmanabad Chowk and 6th Road Chowk to monitor traffic congestion on BBS Road.

He said RDA had requested the Punjab government to allocate more funds to install four CCTV cameras at Double Road, Kohati Bazaar, Naz Cinema and Asghar Mall Chowk.

RDA Director General (DG) Makeen Shahbaz told Daily Times that they had directed the consultant to install software for computer data of traffic flow within a week to make the UTCS Project operational by Eidul Fitr.

He said the consultant would feed the data of traffic flow at each signal from Marrir Chowk to Double Road and they would adjust the timings of signals and control it from the control room.

He said the traffic police and RDA official would man the control room to control the traffic flow.

RDA DG: The RDA DG, who is also traffic engineer, said UTCS would save the precious time and fuel of the commuters. He said after checking the effectiveness of UTCS at Liaquat Bagh, the project had been started from Marrir Chowk to Double Road, as the traffic congestion had become a routine on this portion of BBS Road.

http://www.dailytimes.com.pk/default.asp...009_pg11_4
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Rawalpindi Commissioner Confirms Limited Access to Rawalpindi Ring Road for Housing S LRE-Azan 0 625 01-10-2024 06:07 PM
Last Post: LRE-Azan
  DHA Quetta Announces Inauguration of Operational Site Office for Enhanced Community E LRE-Azan 0 618 11-14-2023 02:57 PM
Last Post: LRE-Azan
  LDA Announces New SOPs for Building Control in Accordance With Lahore Master Plan LRE-Azan 0 671 09-13-2023 07:35 PM
Last Post: LRE-Azan
  Despite Delays, CDA Discloses Its Urban Facelift Plan LRE-Azan 0 642 08-24-2023 05:11 PM
Last Post: LRE-Azan
  Ravi Urban Development Authority (RUDA) - Cash & Installment Files | Best Opportunity LRE-Azan 0 901 05-20-2023 04:23 PM
Last Post: LRE-Azan
  Pre-Urban Planning For Gujar Khan And Kotli Sattian Has Been Finished As Part Of The LRE-Azan 0 916 04-08-2023 02:13 PM
Last Post: LRE-Azan
  IJP Road to open to traffic by the end of month LRE-Azan 0 931 01-26-2023 03:05 PM
Last Post: LRE-Azan
  PESHAWAR News: CM KP Approves First Ever Urban Policy 2030 LRE-Azan 0 1,034 01-21-2023 01:21 PM
Last Post: LRE-Azan
  CPEC News : US $1.9 bln Suki Kinari hydropower project to become operational by year LRE-Azan 0 1,512 11-08-2021 02:32 PM
Last Post: LRE-Azan
  Commercialisation: LDA to assume control of buildings on 147 roads Salman 0 5,016 03-20-2014 02:54 PM
Last Post: Salman
  Sindh Building Control Authority Cautions People About Ocean Tower Salman 0 5,074 02-28-2014 01:40 PM
Last Post: Salman
  LDA’s Computer Services Control Handed Over To Project Manager Salman 0 4,110 01-15-2014 05:15 PM
Last Post: Salman
  Mareer Chowk Railway Bridge finally becomes operational Salman 0 5,281 01-08-2014 02:43 PM
Last Post: Salman
  CDA Plans To Make Non-Functioning Water Plants Operational Salman 0 11,727 11-05-2013 01:50 PM
Last Post: Salman
  Development Authorities To Get Control Over Housing Department Schemes Salman 0 10,726 09-20-2013 05:36 PM
Last Post: Salman
  Traffic System Destroyed In Bill Road Market, Traders Perplexed Salman 0 7,068 09-11-2013 07:35 PM
Last Post: Salman
  The Budget Bill For Urban Development Wing, WASA And TEPA, Passed Salman 0 6,880 07-30-2013 02:36 PM
Last Post: Salman
  The Budget Bill For Urban Development Wing, WASA And TEPA, Passed Salman 0 6,373 07-30-2013 02:36 PM
Last Post: Salman
  Rawalpindi Property News : Rawalpindi Residents Get Served With Multiple Property Ta Salman 0 9,800 07-11-2013 12:01 AM
Last Post: Salman
  Newly constructed flyover closed for traffic Salman 0 4,194 06-05-2013 06:40 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)