Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Home-built JF-17 to be unveiled on 23rd
11-18-2009, 08:26 AM
Post: #1
Home-built JF-17 to be unveiled on 23rd
[Image: ISLJF-17-JPG+copy.jpg?MOD=AJPERES]

The JF-17 aircraft will replace PAF’s ageing fleet of A-5s, F-7s and Mirages.—File photo

ATTOCK: The first multi-role JF-17 Thunder jet fighter, jointly developed with China, produced at the Aircraft Manufacturing Factory (AMF) of the Pakistan Aeronautical Complex will roll out in Kamra, Attock on Nov 23.

This would be a milestone, marking the fulfilment of Pakistan Air Force’s goals of achieving self-sufficiency and strengthening its fighting capability, ISPR said on Tuesday.

The ceremony for handing over the aircraft would be held in December after the formation of a full JF-17 squadron.

The final assembly of the aircraft began on June 30 in the presence of Chief of Air Staff Air Chief Marshal Rao Qamar Suleman.

The JF-17 aircraft, which will replace PAF’s ageing fleet of A-5s, F-7s and Mirages, will be armed with an array of conventional and precision-guided bombs, short- and beyond-visual-range air-to-air and air-to-surface missiles, enabling the air force to carry out day and night operations.

Kamra’s AMF started maintenance, repair and overhaul of Chinese-built aircraft in 1972 and progressed to become the country’s only aircraft manufacturing facility in 1975 by assembling Mushak and Super Mushak aircraft under licence from Sweden’s Saab Scania. Later, it began producing aerial target drones.

The turning point came when the factory took part in the design, development and co-production of the Karakoram-8 aircraft with China.

The offer for joint development of a fighter aircraft was made to by the Chinese in 1992.

The JF-17 project started in 1995 with the establishment of the JF-17 Programme Management Office (PMO) at the Air Headquarters, which finalised air staff requirements, outlining the aircraft’s operational capability and performance characteristics, besides negotiating the contract for co-development activity.

In 1998, a memorandum of understanding was signed for co-development and co-production.

Since then, the JF-17 PMO is managing all aspects of design and development process and is overseeing the complete process till its final certification.

JF-17’s development contract was signed in June 1999, but sanctions slapped after October 1999 caused a setback and it was feared that the programme might be suspended.

A new approach was adopted in January 2001, giving the project a fresh impetus. As a result, the first prototype aircraft was completed in just 30 months, an unprecedented achievement in any modern jet fighter programme.

JF-17’s maiden flight was undertaken on Sept 3, 2003, in Chengdu, China.

Two aircraft of the small batch production were received by Pakistan on March 21, 2007, at PAC, Kamra. These aircraft participated in the March 23, 2007 fly-past.

On Jan 22, last year, a ceremony was held to launch the manufacturing of JF-17 Thunder’s sub-assemblies.

At present, the PAF has eight JF-17s after it received six aircraft in March last year for testing and evaluation. These aircraft took part in the fly-past on Pakistan Day last year.
http://www.dawn.com/wps/wcm/connect/dawn...3rd--bi-14
Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  DHA Multan Construction Waiver Scheme 2024-25: Save Big on Your Dream Home! LRE-Azan 0 167 10-23-2024 06:26 PM
Last Post: LRE-Azan
  Milestone Announcement: Possession Handover Date Unveiled for Plots in LDA City’s Jin LRE-Azan 0 632 12-30-2023 04:50 PM
Last Post: LRE-Azan
  Exciting Developments Unveiled by DHA Quetta: Expressway Reopens, Cutting-Edge Lab La LRE-Azan 0 636 09-14-2023 04:33 PM
Last Post: LRE-Azan
  Luxurious 5-star beachfront project unveiled LRE-Azan 0 597 08-21-2023 06:06 PM
Last Post: LRE-Azan
  Islamabad: CDA Built a New Temporary Dumping Site in Sector H-16 LRE-Azan 0 1,285 11-02-2021 06:38 PM
Last Post: LRE-Azan
  Metro Bus project to be launched on 23rd Salman 0 5,205 03-22-2014 06:07 PM
Last Post: Salman
  Underpass, not flyover, to be built near Mehran Hotel Salman 0 4,609 01-02-2014 01:25 PM
Last Post: Salman
  ‘Commercial projects built on residential plots to be razed’ Salman 0 7,134 06-20-2013 12:37 PM
Last Post: Salman
  11 new pedestrian bridges being built Salman 0 4,044 12-21-2012 01:50 PM
Last Post: Salman
  Illegally built shops, rooms demolished Salman 0 6,205 11-17-2012 01:29 PM
Last Post: Salman
  President wants expressway to Zulfikarabad built Salman 0 4,735 11-02-2012 04:34 PM
Last Post: Salman
  1,500km roads will be built in Sindh: CM Salman 0 4,981 09-19-2012 04:22 PM
Last Post: Salman
  Parking plazas to be built at Ferozepur Road: CM Salman 0 4,898 03-22-2012 07:13 PM
Last Post: Salman
  Karachi Development News : 10 more pedestrian bridges to be built Salman 0 4,281 03-09-2012 12:13 PM
Last Post: Salman
  The construction of first home at the KPC Journalist Housing Scheme Hawksbay has begu Salman 0 5,753 02-13-2012 02:40 PM
Last Post: Salman
  3000 more Ashiana house will be built: CM Lahore_Real_Estate 0 3,338 12-29-2011 11:36 AM
Last Post: Lahore_Real_Estate
  Karachi Development News : DHA City masterplan unveiled to real estate agents Salman 0 6,629 12-22-2011 12:06 PM
Last Post: Salman
  DHA City Karachi Master Plan to be Unveiled on Dec 21, Salman 0 4,306 12-20-2011 12:44 PM
Last Post: Salman
  Building home becomes dream due to whopping hike Lahore_Real_Estate 0 3,696 12-19-2011 12:29 PM
Last Post: Lahore_Real_Estate
  Final master plan of DHA City Karachi unveiled Salman 0 7,495 11-01-2011 02:44 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)