Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Home » Forums » Sweet Home Syndicate Syndicate content Archives August 2010 Sun Mo
08-05-2010, 01:14 PM
Post: #1
Home » Forums » Sweet Home Syndicate Syndicate content Archives August 2010 Sun Mo
* Five firms make offers to conduct feasibility study

* Constant delay in project likely to increase its cost from Rs 55 million to Rs 100 million

By Ikram Junaidi

Capital Development Authority (CDA) has received offers from five consultant firms regarding feasibility study of a mass transit system for Islamabad. Offers will be opened on August 16 and then it will take one and a half months to analyze the lowest bidder.

Sources told Daily Times on Tuesday that due to delay by the CDA, cost of the project is continuously increasing. It was Rs 55 million initially. After that a Swedish firm, M/s Reklers, demanded Rs 70 million. Now is the third time for the bidding and this time it is estimated that the lowest bid will be Rs 100 million.

The consultant will conduct field survey and traffic counts to establish database on the current needs of the twin cities, especially Islamabad. The terms of reference (TOR) include occupancy and travel time, origin and destination, public transport, passengers embarking and disembarking, stated preferences, willingness to pay and home interview-based surveys.

According to sources, the consultant will prepare travel demand forecasts by mode and well-defined corridors along with their linkages to phase-I and for subsequent phases up to 2030. They would also authenticate the forecast against a system, currently operational in comparable cities in Asia.

The survey would identify potential urban mass transit corridors and develop an integrated network plan for immediate phase-I, short-term phase II, medium-term phase III and long-term phase IV up to 2030 and beyond.

According to the new TOR, the survey also includes providing estimate of investment requirements, fare-box revenues for each mode, institutional arrangements for operation and implementation.

The study would define the mode of operation including private, public-private, built-operate-transfer (BOT) and participation of different authorities in terms of infrastructure and operations such as land reservation for surface right of way (ROW), terminals, workshop facilities, stops, parking facilities, development of land for commercial use.

The study also includes preparation of phase-wise action plan consisting of immediate phase I, short-term phase II, medium-term phase III and long-term phase IV.

The study would provide information about manpower and training requirement for each stage and mode of urban transport for all phases (construction, operation and maintenance), said the sources.

They said the study would include identification and availability of energy and fuel requirements for the transport sector. The survey would also identify the project’s environmental, social and financial aspects.

The consultant firm would also analyze possibilities of under ground railway system (Tube Stations) to make the transportation fast and decrease traffic on roads. It will be cheaper than road transportation.

CDA Director for Traffic Engineering and Transport Planning, Azam Khan Lodhi, said it would take about eight months to complete the study. He said CDA wanted to conduct an advanced study to make Islamabad equal to capitals of developed countries.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  DHA Multan Construction Waiver Scheme 2024-25: Save Big on Your Dream Home! LRE-Azan 0 159 10-23-2024 06:26 PM
Last Post: LRE-Azan
  Nespak secured 110 projects in 2010-11 Salman 0 4,150 03-23-2012 12:10 PM
Last Post: Salman
  Sweet Homes to make orphans progressive citizens Lahore_Real_Estate 0 4,556 03-02-2012 12:41 PM
Last Post: Lahore_Real_Estate
  The construction of first home at the KPC Journalist Housing Scheme Hawksbay has begu Salman 0 5,747 02-13-2012 02:40 PM
Last Post: Salman
  Building home becomes dream due to whopping hike Lahore_Real_Estate 0 3,691 12-19-2011 12:29 PM
Last Post: Lahore_Real_Estate
  Karachi Property News : Rainbow Sweet Homes Salman 0 5,654 11-15-2011 02:40 PM
Last Post: Salman
  HBFCL launches home renovation loan scheme Lahore_Real_Estate 0 3,865 10-05-2011 01:24 PM
Last Post: Lahore_Real_Estate
  Still I Love You (My Sweet Wife) ! LRE 1 5,286 06-26-2011 08:23 PM
Last Post: LRE
  Rahat pays off fine; can return home Lahore_Real_Estate 0 3,881 02-21-2011 02:23 PM
Last Post: Lahore_Real_Estate
  CDA failed to carry out survey in 2010 Lahore_Real_Estate 0 4,000 02-14-2011 04:37 PM
Last Post: Lahore_Real_Estate
  2010 ‘one of worst’ years for natural disasters: UN Lahore_Real_Estate 0 3,977 01-25-2011 12:24 PM
Last Post: Lahore_Real_Estate
  2010 Glimpses LRE 1 4,922 01-02-2011 01:43 AM
Last Post: LRE
  2010 remains a year of sufferings and struggle for Pakistan Lahore_Real_Estate 0 3,663 01-01-2011 11:40 AM
Last Post: Lahore_Real_Estate
  URBANISATION AND 2010 - Illegal housing societies grow unbridled Lahore_Real_Estate 0 3,984 01-01-2011 11:28 AM
Last Post: Lahore_Real_Estate
  America will be divided in Free States by 2010: Russian Economist & Ambassador LRE 2 7,869 12-28-2010 10:37 PM
Last Post: LRE
  Income tax on foreign investors: no advance ruling issued in 2010 Lahore_Real_Estate 0 4,331 12-23-2010 01:33 PM
Last Post: Lahore_Real_Estate
  PA passes Industrial Relations Bill 2010 Lahore_Real_Estate 0 4,056 12-09-2010 01:25 PM
Last Post: Lahore_Real_Estate
  Rawalpindi: Development work at Chaakra housing scheme from 25th Nov 2010 Lahore_Real_Estate 0 4,425 11-25-2010 04:39 PM
Last Post: Lahore_Real_Estate
  General Sales Tax Bill, 2010 Lahore_Real_Estate 0 6,019 11-25-2010 04:36 PM
Last Post: Lahore_Real_Estate
  ‘Colonisation of Govt Lands (Amend) Bill 2010’ approved Lahore_Real_Estate 0 3,630 11-16-2010 01:51 PM
Last Post: Lahore_Real_Estate

Forum Jump:


User(s) browsing this thread: 1 Guest(s)