Kalma Chowk: Underpass on hold over mass transit concerns
06-06-2011, 02:31 PM
Post: #1
Kalma Chowk: Underpass on hold over mass transit concerns
LAHORE:

The government has decided to put a hold on work on an underpass at Kalma Chowk amidst concerns about funding and the design of the project, The Express Tribune has learnt.

Chief Minister Shahbaz Sharif inaugurated the construction of a flyover on Ferozepur Road and an underpass connecting Gulberg and Garden Town at Kalma Chowk in March and directed the officials concerned to complete the project by August 14.

While work on the flyover is continuing, the underpass project has not started yet. Officials said that this was because of a lack of funds and concerns from the Chinese company due to build the Lahore Rapid Mass Transit System that the underpass would interfere with its plans to build infrastructure for a city metro.

Communication and Works chief engineer Munawwar Bashir said the original plan to complete construction during the summer had had to be shelved. “We realised that the underpass project would be disrupted by the monsoon,” he said.

“I cannot say when construction of the underpass will begin exactly,” he said. Asked how much the project would cost, he said that this had not been calculated yet.

A source said that the Chinese company had also objected to the flyover design, but Bashir denied this, saying that the flyover design left sufficient space for an underground train.

A Planning and Development official told The Express Tribune on the condition of anonymity that lack of funds was a concern, but the LRMTS was the main problem. He said that at the start of the flyover project, Planning and Development officials had warned Sharif that it would leave no money for other development projects, including the underpass.

He said that the company in charge of the LRMTS project had not decided yet whether the train would cross the Kalma Chowk junction under the ground or on elevated tracks, but earlier studies had suggested that building an underground tunnel was the best option. But an underpass at Kalma Chowk would scupper that option, he said.

The official said that the underpass would not be built until the Chinese company completed the feasibility study for the LRMTS project or gave the government the green light for it.

Kalma Chowk project director Sabir Khan denied that funding was an issue, but the government had not yet decided to start construction. He said that the chief minister had not been briefed about the underpass project as the National Engineering Services of Pakistan (NESPAK) was still preparing the feasibility report.

He said that the LRMTS project would not be affected by the underpass. “The project would only be disturbed if we used the piling technique while constructing the underpass,” he said.

Khan said Nespak would consider the train crossing when preparing its design for the underpass. He refused to give any technical details, saying that he could not comment until the design was finalised.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Deadline Set for the Opening of Shahdara Chowk and Ravi Bridge LRE-Azan 0 650 01-04-2024 01:58 PM
Last Post: LRE-Azan
  Deadline Set for Completion of Ghora Chowk and Cavalry Ground Projects in Lahore LRE-Azan 0 629 11-18-2023 04:09 PM
Last Post: LRE-Azan
  NHA and CDA Resolve T-Chowk Design Dispute Amicably LRE-Azan 0 559 11-14-2023 02:56 PM
Last Post: LRE-Azan
  Traffic Plan Amid Cavalry Chowk Underpass Construction Issued LRE-Azan 0 641 09-12-2023 05:47 PM
Last Post: LRE-Azan
  Margalla Town Underpass Construction Will Resume, According To CDA LRE-Azan 0 1,073 03-07-2023 04:12 PM
Last Post: LRE-Azan
  PCBDDA Plans to Open Kalma Chowk Underpass by February 2023 LRE-Azan 0 1,044 01-25-2023 02:06 PM
Last Post: LRE-Azan
  Lahore Gulberg to Defence Chowk to be Made 5km Signal Free Corridor LRE-Azan 0 1,492 01-01-2022 06:51 PM
Last Post: LRE-Azan
  Chief Minister Punjab (CM) Sardar Usman Buzdar has Launched the Gulab Devi Underpass LRE-Azan 0 1,609 12-27-2021 09:03 PM
Last Post: LRE-Azan
  Rawal Dam Chowk Interchange likely to be completed by June 2022 LRE-Azan 0 1,766 12-15-2021 05:48 PM
Last Post: LRE-Azan
  Lahore: Shadra Flyover And Band Road Underpass Approved LRE-Azan 0 1,547 12-02-2021 07:51 PM
Last Post: LRE-Azan
  Flyover on Azadi Chowk : LHC extends stay against demolition Salman 0 4,959 02-26-2014 10:23 PM
Last Post: Salman
  Rs. 1.5 billion Allotted For Azadi Chowk Flyover Salman 0 5,977 02-07-2014 07:34 PM
Last Post: Salman
  Work on Azadi Chowk Interchange, New Circular Road Project starts Salman 0 8,674 01-16-2014 01:55 PM
Last Post: Salman
  Mareer Chowk Railway Bridge finally becomes operational Salman 0 5,280 01-08-2014 02:43 PM
Last Post: Salman
  Underpass, not flyover, to be built near Mehran Hotel Salman 0 4,603 01-02-2014 01:25 PM
Last Post: Salman
  Rs 1,600m approved for Azadi Chowk shifting Salman 0 9,590 11-18-2013 12:16 PM
Last Post: Salman
  CDA to hold three-day auction of 56 commercial plots Salman 0 12,919 11-06-2013 02:58 PM
Last Post: Salman
  Islamabad bus rapid transit project looks scrapped Salman 0 7,377 10-25-2013 12:24 AM
Last Post: Salman
  CDA to hold auction of commercial plots Salman 0 11,921 10-10-2013 01:42 PM
Last Post: Salman
  Mareer Chowk Bridge launching delayed again Salman 0 10,863 08-06-2013 11:08 AM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)