Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Ichra flyover to be completed by end of March
02-02-2012, 12:03 PM
Post: #1
Ichra flyover to be completed by end of March
Lahore—The Construction of Ichra-Muslim Town Flyover at Ferozepur Road from WAPDA Hospital to Gaddafi Stadium would be completed by the end of March.

Communication and Works department Project Director Sabir Khan told media persons here Tuesday that the construction was in full swing on day and night basis and there was no shortage of funds from the government.

He added that matters related to the land acquisition, shifting of infrastructure and other litigations were resolved.

He said, it would take more time and cost than the Kalma Chowk Flyover which had been constructed in record 135 days with 660 metres length and Rs 2.3 billions cost.

Sabir Khan said that the estimated cost of Muslim Town Flyover was Rs 3.5 billions and it would be more than 200 percent larger than Kalma Chowk project.

Referring the design of the flyover, he said that it would be started from Police Workshop/Pakistan Industrial Technical Assistance Centre (PITAC) Ferozepur Road and ended in front of WAPDA Hospital.

One of the two main limbs of the bridge would be of 1.1 Kilometre and the other of 0.95 Km besides a 350 metres long branch lane from Kalma Chowk side which would be dropped at Wahdat Road intersection.

Apparently, it was a mega project needed a period of more than nine months to complete but the Chief Minister Muhammed Shahbaz Sharif has given the task to complete it within six months by utilizing the maximum resources and same technique as was used in Kalma Chowk project.

The project Director said that to save the existing infrastructure of Canal Under Pass, water supply ,sewerage and electrification, the engineers were moving carefully on the site.

We are confident to complete the project within the stipulated time and it would be opened for people by end of March, he said.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 636 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Good news: Margalla Avenue to be Completed ‘Very Soon’ – Chairman CDA LRE-Azan 0 1,200 01-21-2023 01:15 PM
Last Post: LRE-Azan
  HYDERABAD-SUKKUR MOTORWAY TO BE COMPLETED IN 2 YEARS LRE-Azan 0 900 01-18-2023 03:07 PM
Last Post: LRE-Azan
  Rawal Dam Chowk Interchange likely to be completed by June 2022 LRE-Azan 0 1,768 12-15-2021 05:48 PM
Last Post: LRE-Azan
  LOS dual carriageway to be completed by May Salman 0 4,433 01-27-2014 07:10 PM
Last Post: Salman
  Property Tax Survey Completed By Excise Department Salman 0 6,488 11-19-2013 04:51 PM
Last Post: Salman
  Railway bridge project to be completed by November 30 Salman 0 11,007 10-10-2013 01:22 PM
Last Post: Salman
  All NHA projects to be completed in stipulated time: Arbab Salman 0 9,432 08-17-2013 12:55 PM
Last Post: Salman
  Pir Wadhai project to be completed by June 31 Salman 0 4,925 06-04-2013 11:38 AM
Last Post: Salman
  RDA expedites work, but project unlikely to be completed on time Salman 0 5,302 06-01-2013 03:29 PM
Last Post: Salman
  7,100 MW Bunji Dam’s detailed engineering design completed Salman 0 5,203 05-07-2013 06:37 PM
Last Post: Salman
  Work restarts, project likely to be completed next month Salman 0 5,120 04-23-2013 12:08 PM
Last Post: Salman
  Work on service roads could not be completed despite passage of deadline Salman 0 4,852 03-12-2013 07:38 PM
Last Post: Salman
  Mareer Tunnel project to be completed in time Salman 0 5,467 03-11-2013 07:51 PM
Last Post: Salman
  Mareer Chowk tunnel project to be completed by March 15 Salman 0 5,353 01-10-2013 01:25 PM
Last Post: Salman
  Sixth road fly over to be completed by Jan 6 Salman 0 4,152 01-02-2013 12:44 PM
Last Post: Salman
  Sixth Road Flyover likely to be completed in five days Salman 0 4,938 01-01-2013 07:05 PM
Last Post: Salman
  6th Road flyover to be completed in December Salman 0 4,984 11-14-2012 01:15 PM
Last Post: Salman
  Shahrah-i-Quaideen Will Be Completed Soon Salman 0 3,998 11-02-2012 04:33 PM
Last Post: Salman
  Mareer Chowk underpass detailed design has been completed Salman 0 5,659 09-25-2012 03:46 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)