Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Zero Point to draw closer to airport as work on 3 roads starts today
05-23-2012, 11:27 AM
Post: #1
Zero Point to draw closer to airport as work on 3 roads starts today
Zero Point to draw closer to airport as work on 3 roads starts today

ISLAMABAD: The Capital Development Authority will start construction work on three mega road projects today (Wednesday) to cope with swelling volume of traffic as the city's population has reached to 1.7 million.

The projects to be kicked off include construction of Margalla Avenue, 11th Avenue and widening of Kashmir Highway. Margalla Avenue would run along foothills of Margalla Hills and will connect G.T. Road to Sector D-12. This Avenue will also provide an easy access to the new under-construction Islamabad Airport.

This nine-kilometre road would have two-lane with 24-feet width on each side, a 20-feet median and will also comprise a railway bridge. The estimated cost of the project is Rs 744 million; however two firms have offered equal bids of Rs 500 million in open bidding.

Close to this Avenue, the CDA would also launch two residential sectors of C-15 and C-16. The 11th Avenue is planned to connect the Kashmir Highway with the GT Road through Margalla Avenue in phase-I to provide an alternate approach from the GT Road to the Kashmir Highway.

Besides, the seven-kilometre Avenue would facilitate the inhabitants of sectors G-10, G-11, F-10 and F-11. The estimated cost of the project is Rs 1.04 billion and project would take around nine months to complete. The project involves one underpass at intersection of F-10/F-11 and G-10/G-11 and an interchange at the Nazimuddin Road and the Ibn-e-Sina Road.

Under the project, the 11-kilometre Kashmir Highway would be widened from existing two to five lanes from Peshawar Morr to the GT Road and would cost around Rs 4.8 billion. The project comprises six new bridges, three underpasses on 10th, 11th and 12th Avenues, a flyover on Golra Road. The designed speed of the road would be 120 kilometres per hour to help commuters reach from Zero Point to new airport within 15 minutes instead of current 45 minutes.

The Highway is said to be the future lifeline for Islamabad and the under-construction Benazir International Airport, at Fatehjang, is to complete in 2013.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Chinese Company Contracted To Build Pakistan Largest Airport Salman 0 5,192 07-13-2017 04:38 PM
Last Post: Salman
  Capital Administration Starts Surveying Nullahs In Islamabad Salman 0 4,788 03-26-2014 06:05 PM
Last Post: Salman
  Commercialisation: LDA to assume control of buildings on 147 roads Salman 0 5,016 03-20-2014 02:54 PM
Last Post: Salman
  NAB starts probe into FGEHF plots allotment, recruitment's Salman 0 5,283 02-25-2014 01:19 PM
Last Post: Salman
  Bahria Town Karachi Booking Starts Salman 0 8,078 01-27-2014 05:23 PM
Last Post: Salman
  CDA allocates Rs 4.3m for beautifying Zero Point Salman 0 3,944 01-20-2014 07:33 PM
Last Post: Salman
  Work on Azadi Chowk Interchange, New Circular Road Project starts Salman 0 8,674 01-16-2014 01:55 PM
Last Post: Salman
  Cantonment areas to have signal-free roads Salman 0 5,907 12-21-2013 12:34 PM
Last Post: Salman
  Plan for road to new airport rejected Salman 0 6,264 12-16-2013 11:38 AM
Last Post: Salman
  LDA to install 136,000 LED lights on city roads Salman 0 7,055 12-02-2013 01:52 PM
Last Post: Salman
  LDA Plans To Install LED Lights On Roads Salman 0 6,441 12-02-2013 01:48 PM
Last Post: Salman
  CDA Yet To Start Construction Of Footpaths Along ZPI (Zero Point Interchange) Salman 0 8,052 10-31-2013 02:29 PM
Last Post: Salman
  Another bid to push Rs8 billion Benazir airport link road fails Salman 0 9,096 10-03-2013 01:19 PM
Last Post: Salman
  Link road to Benazir Airport could become Rs8 billion scam Salman 0 8,663 09-30-2013 03:45 PM
Last Post: Salman
  CDA allocates Rs 8 millions for roads’ repair Salman 0 7,836 09-24-2013 11:43 AM
Last Post: Salman
  CDA yet to start maintenance work on damaged roads Salman 0 5,148 09-16-2013 04:41 PM
Last Post: Salman
  CDA also rejects new Rs8 bn link road to Benazir Bhutto airport Salman 0 6,856 09-16-2013 04:38 PM
Last Post: Salman
  RDA joins NHA in opposing Rs8 bn link road to Benazir Airport Salman 0 8,465 09-02-2013 12:41 PM
Last Post: Salman
  Link road to Benazir Airport could become Rs8 billion scam Salman 0 7,737 08-29-2013 12:29 PM
Last Post: Salman
  SC allows DHA to draw Rs 52m from frozen accounts Salman 0 8,134 08-02-2013 03:46 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 2 Guest(s)