Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Karachi: Kamal orders completion of Signal Free Corridor III in 2 months
04-18-2009, 08:06 AM
Post: #1
Karachi: Kamal orders completion of Signal Free Corridor III in 2 months
By Irfan Aligi
KARACHI: City Nazim Mustafa Kamal paid a surprise inspection visit at the site of the Signal-Free Corridor-III on Thursday.

During the visit, Kamal issued directives that the City District Government Karachi (CDGK) Works and Services (W&S) Department should ensure speedy completion of all phases of the SFC-III, so that the project can be opened for traffic in the next two months.

The pace of work on the construction of Preedy Street and Jail Chowrangi Flyover should be stepped up because these two loops are of pivotal importance in shedding the load of heavy traffic on Saddar and MA Jinnah Road, he said.

Kamal further issued directives to EDO W&S Department that he should submit a progress report of the work done on all projects of Corridor-III on a daily basis and initiate necessary actions against the contractor firm, consultant and project director concerned in case the report was not found satisfactory.

Kamal further directed the team of officers and engineers on the site to get the ongoing construction work finished on Jail Chowrangi-Kashmir Road loop and Shaheed-e-Millat Ramp to facilitate the people of the city. The on time completion of these phases would minimise 80 percent of the traffic problems of the city because it would shorten the distance between Sadder to Malir Cantt by 18 kilometres.

Meanwhile, Kamal was briefed on the occasion by officers in charge that 45 percent of the construction work on Preedy Street has been completed while 40 of the construction work on the Jail Chowrangi Flyover has been completed and both the channels will be open for traffic in the next two months.

It is pertinent to mention here that the SFC-III would cost Rs 2.25 billion and would have four flyovers at different junctions between Saddar and Malir Cantt. The entire length of SFC-III would be 18-km and the width would be 13.85-metres with 4-lane roads. Service roads would also be constructed additionally on either side. There would be 10 pedestrian bridges and 23 modern bus stops for the convenience of the citizens. Streetlights and a storm water drainage system will also be installed on this corridor. It is expected that the project would prove an alternative to Shahra-e-Faisal and MA Jinnah Road.

There are around 8,000 families that have voluntarily allowed the CDGK to demolish 1,385 homes and they will be rehabilitated in another area of the city. The CDGK has offered each affected family residential and commercial plots along with Rs 50,000 as immediate pecuniary relief.

http://www.dailytimes.com.pk/default.asp...009_pg12_3
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  CM Naqvi Drives Forward Controlled Access Corridor Band Road Project in Lahore LRE-Azan 0 1,009 01-24-2024 06:40 PM
Last Post: LRE-Azan
  PM Kakar Emphasizes Pakistan-China Collaboration for CPEC Project Completion LRE-Azan 0 633 01-23-2024 03:31 PM
Last Post: LRE-Azan
  Final Stages of Quetta Safe City Project Signal Progress in Counterterrorism and Poli LRE-Azan 0 556 01-19-2024 06:47 PM
Last Post: LRE-Azan
  The China-Pakistan Economic Corridor (CPEC) Achieves Milestones: 36 Projects Worth US LRE-Azan 0 642 01-06-2024 05:23 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road (RRR) Project: 12% Completion, Anticipated Opening in August LRE-Azan 0 648 01-02-2024 06:14 PM
Last Post: LRE-Azan
  Signal-Free Walton Road Project: Tackling 18-Kilometer Infrastructure and Drainage Is LRE-Azan 0 600 12-11-2023 04:06 PM
Last Post: LRE-Azan
  Deadline Set for Completion of Ghora Chowk and Cavalry Ground Projects in Lahore LRE-Azan 0 634 11-18-2023 04:09 PM
Last Post: LRE-Azan
  Chief Secretary Orders Swift Digitization of LDA Records within Two Months LRE-Azan 0 537 10-27-2023 01:55 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Accelerates Towards Completion in One Year LRE-Azan 0 752 10-04-2023 07:17 PM
Last Post: LRE-Azan
  Rawalpindi: Kachehri Chowk Signal Free project, Hearing of Objections Completed LRE-Azan 0 1,520 03-02-2022 06:54 PM
Last Post: LRE-Azan
  Lahore Gulberg to Defence Chowk to be Made 5km Signal Free Corridor LRE-Azan 0 1,498 01-01-2022 06:51 PM
Last Post: LRE-Azan
  Emergency and disaster management NOC Mandatory on Building Completion in Capital Isl LRE-Azan 0 1,542 11-08-2021 08:08 PM
Last Post: LRE-Azan
  Rs21.814b signal-free Islamabad Highway corridor Salman 0 4,696 04-09-2015 04:15 PM
Last Post: Salman
  CDA chief for speedy completion of parks’ uplift projects Salman 0 4,617 02-25-2014 01:18 PM
Last Post: Salman
  Govt gives green signal to Leh Expressway project Salman 0 4,961 02-20-2014 01:52 PM
Last Post: Salman
  CDA Chairman stresses early completion of Kashmir Highway Salman 0 4,995 02-12-2014 07:48 PM
Last Post: Salman
  Cantonment areas to have signal-free roads Salman 0 5,910 12-21-2013 12:34 PM
Last Post: Salman
  CDA to ensure hassle-free process for auction of plots Salman 0 6,525 11-18-2013 12:22 PM
Last Post: Salman
  Modern burn centre to be functional in 2 months Salman 0 6,535 10-28-2013 03:22 PM
Last Post: Salman
  KMC Administrator Ordains Early Completion Of Flyovers Salman 0 5,123 10-23-2013 12:22 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)