Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Islabad: Kashmir Highway becomes drain on CDA funds
09-20-2008, 01:10 AM
Post: #1
Islabad: Kashmir Highway becomes drain on CDA funds
Under the new plan, the CDA will expand and rehabilitate the highway, which will have three flexible and two rigid lanes on each side. The work on the project is likely to start next month and it will be completed in 2010
— Official

By Fazal Sher

ISLAMABAD: Kashmir Highway has become a white elephant for the finance department of Capital Development Authority (CDA) as it has consumed million of rupees during the last few years and the civic body is again set to spend Rs 800 million on its expansion and rehabilitation work starting next month.

According to sources, the CDA had spent Rs 80 million on the Highway construction in year 2005-06 and Rs 30 million on its rehabilitation in 2006-07 as the road damaged soon after its construction. The CDA has again allocated Rs 800 million in the budget 2008-09 for expansion and rehabilitation of the highway, they said.

They said on the one hand the CDA spent million of rupees on the construction of highway, on the other it has not yet constructed the highway on its proper alignment due to wrong engineering. The CDA Road Directorate constructed the highway on the site of G-12 and G-13 service road instead of its exact alignment, sources said.

Sources said CDA despite having huge infrastructure had so far failed to establish a proper project monitoring directorate, which was the main reason of heavy expenditures on the construction of Kashmir Highway and other development projects. They said the road damaged several times due to use of substandard material.

An official of CDA said Kashmir Highway was one of the main arteries that linked GT Road and Islamabad International Airport. It has become more important because the Federal Capital is developing towards the western side and the authority needed to construct it according to international standards, he said.

The official said that according a survey repot of the consultant hired by the CDA, around 40,000 vehicles use the Kashmir Highway daily.

Under the new plan, CDA would expand and rehabilitate the Highway, he said, adding, the road will have three flexible and two rigid lanes on each side. The work on the project is likely to start in the next month and will be completed in 2010, he said.

He said CDA had divided the project into four separate contract packages. First phase contract package is construction of road from Peshawar Morr to Golra Chowk, second from Golra Chowk to Peshawar Morr, third from Golra Chowk to GT Road and fourth phase contract package is construction of six bridges on six lanes.

After its improvement and widening, Kashmir Highway will be able to bear the flow of traffic for 25 years, he said.

http://www.dailytimes.com.pk/default.asp...008_pg11_3
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Funds Approved for Various Development Projects, Including Link Road Interchange in K LRE-Azan 0 652 01-01-2024 02:03 PM
Last Post: LRE-Azan
  SBP & CDC Launched RAAST Payments Facility For Mutual Funds LRE-Azan 0 587 11-02-2023 06:37 PM
Last Post: LRE-Azan
  RAAST Online Funds Transfer Service to be Unavailable on Sunday LRE-Azan 0 681 09-02-2023 02:48 PM
Last Post: LRE-Azan
  Rs21.814b signal-free Islamabad Highway corridor Salman 0 4,689 04-09-2015 04:15 PM
Last Post: Salman
  Paved with gold: Metro bus roadwork to cost thrice as much as Kashmir Highway widenin Salman 0 4,779 03-28-2014 02:27 PM
Last Post: Salman
  CDA to complete Kashmir Highway project by May 31 Salman 0 4,673 02-25-2014 01:22 PM
Last Post: Salman
  CDA Chairman stresses early completion of Kashmir Highway Salman 0 4,992 02-12-2014 07:48 PM
Last Post: Salman
  CDA chairman inspects work on Kashmir Highway Salman 0 4,748 02-06-2014 12:45 PM
Last Post: Salman
  Billions of LOS project going down drain Salman 0 4,092 02-04-2014 12:20 AM
Last Post: Salman
  New CDA Chairman vows to expedite expansion of Kashmir Highway Salman 0 5,985 12-26-2013 05:13 PM
Last Post: Salman
  Work on Express Highway in Swat to begin shortly Salman 0 6,882 11-25-2013 01:32 PM
Last Post: Salman
  Kashmir Highway project: Instead of receiving funds, CDA conducting inquiry Salman 0 8,386 10-31-2013 11:58 AM
Last Post: Salman
  PM orders strict action against responsible behind Kashmir Highway embezzlement Salman 0 5,984 10-28-2013 03:19 PM
Last Post: Salman
  CDA’s Finance Wing Trammels The Kashmir Highway Construction Project Salman 0 5,312 10-21-2013 06:21 PM
Last Post: Salman
  Linkage of Gwadar Port with Karakorum Highway will multiply Pakistan exports to China Salman 0 8,608 09-24-2013 11:42 AM
Last Post: Salman
  Illegitimate Allocation Of Rs 1 Billion Funds For Progression Of Kachi Abadis Salman 0 7,772 09-04-2013 08:37 PM
Last Post: Salman
  Delay in widening of Kashmir Highway causing traffic jams Salman 0 9,909 08-01-2013 12:45 PM
Last Post: Salman
  Motorways funds diverted to big bosses areas, PM informed Salman 0 6,211 07-19-2013 12:13 PM
Last Post: Salman
  Construction Of Kashmir Highway Delayed, Residents Troubled Salman 0 5,192 07-17-2013 12:48 PM
Last Post: Salman
  CDA allocates Rs 334m for Kashmir Highway Salman 0 5,546 07-06-2013 05:18 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)