Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
TEPA to build two parking plazas at Liberty market
08-03-2009, 05:06 AM
Post: #1
TEPA to build two parking plazas at Liberty market
Monday, August 03, 2009
By Our Correspondent

LAHORE

THE Traffic Engineering and Planning Agency (TEPA) will build two plazas for providing parking facilities to more than 460 vehicles in the busy commercial centre of Liberty Market, Gulberg.

These plazas will be constructed adjacent to UCH and liberty petrol pump. The Seven-storey parking plaza, to be built near UCH, will cover an area of three Kanals and 16 Marlas and cost an amount of Rs.500 million.

The building will be completed within a year time and will have the capacity of accommodating 206 vehicles with the average parking time of 12 hours per day. Shops will be constructed in the basement as well as on the ground, first and second floors of the plaza while the third, fourth and fifth floor and its rooftop will be used for parking vehicles. A modern restaurant will also be established on the first floor of the structure which will have the capacity of upward extension of two additional floors.

Safety and Security of the people have been ensured in these structures by using the structure of paramount importance, so the design includes open stairwells and ramps, security devices such as Road Blockers, Car scanners, CCTV, Public Address System, Fire alarm and fire fighting, audio and emergency buttons that call into the booth or local police station, elimination of potential hiding places such as under open stairs has also been arranged.

Handicap accessibility has been facilitated with vehicles close to stair and elevator cores having a direct path to key movement patterns of the garage.

The second parking plaza will be constructed at a cost of Rs. 559 million, close to the petrol pump. This five-storey building will accommodate 253 vehicles.

Two basements and ground floor will be used for parking of vehicles whereas commercial offices will be established on the upper two floors. It will also be equipped with the latest facilities as will be provided in the firs parking plaza.

http://www.thenews.com.pk/daily_detail.asp?id=191238
Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  CDA Plans to Build Affordable Hostels in Islamabad LRE-Azan 0 998 02-11-2023 05:48 PM
Last Post: LRE-Azan
  DHA Fairways Commercial Plazas Ceremoney held Salman 0 4,487 07-24-2017 03:21 PM
Last Post: Salman
  Chinese Company Contracted To Build Pakistan Largest Airport Salman 0 5,198 07-13-2017 04:38 PM
Last Post: Salman
  Rawalpindi Development Authority to build 31-storey tower CMY 0 5,742 12-28-2013 08:53 AM
Last Post: CMY
  Iqbal Town parking plaza ready for businessss Salman 0 6,363 12-16-2013 11:37 AM
Last Post: Salman
  CDA suffers setbacks in parking plazas project Salman 0 6,257 12-04-2013 01:36 PM
Last Post: Salman
  Construction of Iqbal Town parking plaza complete Salman 0 6,793 11-25-2013 01:28 PM
Last Post: Salman
  ‘Illegal’ parking sealed: CDA comes down hard on Centaurus Salman 0 12,702 10-31-2013 02:34 PM
Last Post: Salman
  NHA to build new motorways, expressways Salman 0 8,132 10-30-2013 01:36 PM
Last Post: Salman
  No plan to build 'new Islamabad' on the cards: CDA chief tells Senate body Salman 0 10,119 10-05-2013 12:10 PM
Last Post: Salman
  CDA to build 44-kilometre-long cycling track in Islamabad Salman 0 6,168 09-30-2013 03:42 PM
Last Post: Salman
  Pak to build twin capital across Margalla Hills Salman 0 7,102 09-13-2013 01:19 PM
Last Post: Salman
  CDA to auction all parking sites in capital Salman 0 5,392 09-13-2013 01:18 PM
Last Post: Salman
  Authorities Plan To Build Underpasses And An Overhead Bridge In The DHA Lahore Salman 0 8,647 09-12-2013 08:22 PM
Last Post: Salman
  CDA to build more parks, playgrounds Salman 0 6,325 08-28-2013 11:48 AM
Last Post: Salman
  The Budget Bill For Urban Development Wing, WASA And TEPA, Passed Salman 0 6,886 07-30-2013 02:36 PM
Last Post: Salman
  The Budget Bill For Urban Development Wing, WASA And TEPA, Passed Salman 0 6,376 07-30-2013 02:36 PM
Last Post: Salman
  CDA to build flyovers at Peshawar Mor, IJP Road crossing Salman 0 6,045 04-01-2013 04:31 PM
Last Post: Salman
  CDA fails to execute parking plaza plan in capital Salman 0 4,523 12-26-2012 12:23 PM
Last Post: Salman
  All parking systems to be automated soon Salman 0 3,754 12-07-2012 12:35 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)