The following warnings occurred:
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 802 - File: showthread.php PHP 7.4.29 (Linux)
File Line Function
/showthread.php 802 errorHandler->error





Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Lowari Tunnel nearly done
08-13-2012, 12:43 PM (This post was last modified: 08-13-2012 12:44 PM by Salman.)
Post: #1
Lowari Tunnel nearly done
Lowari Tunnel nearly done

[Image: attachment.php?aid=1036]
ISLAMABAD - Almost 45% of construction work has been completed on the Lowari Tunnel project, on Nowshera-Dir-Chitral Road (N-45), with an expenditure of over Rs 6 billion. The project is to be completed in July 2017, with a total expected expenditure of Rs 12 billion.
An official from the Ministry of Communications told agencies on Sunday that the project, on completion, would facilitate all-weather and all year-round transportation. This would not only benefit Khyber Pakhtunkhwa but would open new avenues of development and establish durable road links with Afghanistan and Central Asian States.
He said that when the Lowari Tunnel project began in 2005 it was planned to be constructed in two phases. In the first phase, the 8.54 km long tunnel was to be constructed with access roads, while in the second phase a railway track was to be laid.
The main tunnel has a 7.14 meter maximum height and 7.55 meter maximum width. There are two access roads on both sides of the tunnel, from Dir and Darosh that are 9.3 km and 9.2 km long, respectively.
The auxiliary tunnel is two km long. The project could not be completed in October 2008 as planned, in October 2009 the present government decided to change the project design from a rail tunnel to a road tunnel. Work on the project was discontinued again in June 2011, primarily due to financial constraints. There was an allocation of Rs 164 million under the 2010-11 PSDP but most of the funds had not been released.
As one of the longest tunnels in Asia, the Lowari Tunnel is of great national importance and would contribute to the socio-economic wellbeing of the area. After its completion, rich minerals and other natural resources could be exploited, this would result in promoting trade and industry, as well as tourism, in the region, the ministry official added.
Lowari Tunnel will open the Chitral valley to the world, establishing durable road links with Central Asian Republics and Afghanistan.


Attached File(s)
.jpg  Lowari-Tunnel.jpg (Size: 50.14 KB / Downloads: 4504)
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
Lowari Tunnel nearly done - Salman - 08-13-2012 12:43 PM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Lowari Tunnel – Construction Work Expected To Complete In Three Years Salman 0 6,214 10-23-2013 12:23 PM
Last Post: Salman
  SC takes suo motu notice of Margalla Hills Tunnel Project Salman 0 6,309 09-30-2013 03:44 PM
Last Post: Salman
  Mareer Tunnel project to be completed in time Salman 0 5,462 03-11-2013 07:51 PM
Last Post: Salman
  Mareer Chowk tunnel project to be completed by March 15 Salman 0 5,349 01-10-2013 01:25 PM
Last Post: Salman
  Amended design of Mareer Chowk Railway Tunnel still awaits approval Salman 0 5,884 11-30-2012 02:14 PM
Last Post: Salman
  Work on Mureer Tunnel to start by month-end Salman 0 5,059 11-19-2012 12:15 PM
Last Post: Salman
  Marrer Tunnel construction to start soon Salman 0 4,593 11-12-2012 12:41 PM
Last Post: Salman
  Time to build the Malakand Tunnel Salman 0 6,095 08-07-2012 01:09 PM
Last Post: Salman
  Mureer tunnel work from Sept Salman 0 3,644 08-06-2012 12:42 PM
Last Post: Salman
  Mareer Chowk tunnel project would be started soon as Salman 0 4,529 05-19-2012 12:11 PM
Last Post: Salman
  Rawalpindi Devlopment News : Mareer Chowk tunnel’s PC-1 sent for approva Salman 0 4,409 04-02-2012 04:45 PM
Last Post: Salman
  SC told Margalla tunnel project shelved Salman 0 4,522 03-30-2012 12:22 PM
Last Post: Salman
  Mareer Chowk tunnel project to be started soon Salman 0 4,019 02-02-2012 01:27 PM
Last Post: Salman
  Mareer Chowk Tunnel project to be started soon Lahore_Real_Estate 0 3,544 02-02-2012 12:06 PM
Last Post: Lahore_Real_Estate
  Lowari Tunnel to provide road links with Afghanistan, CAS Salman 0 4,828 12-10-2011 12:06 PM
Last Post: Salman
  PM directs NHA to resume work on Lowari Tunnel Salman 0 3,904 11-22-2011 02:08 PM
Last Post: Salman
  Lowari converted into road tunnel LahoreEstate 0 3,525 10-30-2009 11:03 AM
Last Post: LahoreEstate
  Korean engineers arrive to work on Lowari Tunnel LahoreEstate 0 3,159 10-18-2009 05:21 AM
Last Post: LahoreEstate
  Gulf investors continue to see light at the end of tunnel LRE 0 3,250 08-27-2009 09:43 PM
Last Post: LRE
  India building bullet proof tunnel for safety of Kasab Naveed Yaseen 0 3,506 03-07-2009 09:30 AM
Last Post: Naveed Yaseen

Forum Jump:


User(s) browsing this thread: 1 Guest(s)