The following warnings occurred:
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 802 - File: showthread.php PHP 7.4.29 (Linux)
File Line Function
/showthread.php 802 errorHandler->error





Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Aviary to be completed by March
01-24-2009, 10:53 AM
Post: #1
Aviary to be completed by March
Islamabad

The construction work on the aviary in the spectacular Lake View Park would be completed by March at a cost of Rs12 million, which would be first of its kind in the country.

The aviary measuring 4 acres of land will have some unique species of birds from Australian cockatoos and parakeets to colorful South Africans macaws that would be provided with entirely natural environment in the facility.

Medical and quarantine facilities would also be available to the birds besides sunlight bulbs that would help protect them from frost and chill during winter and rainy seasons. Given the importance of vermin proof, effective measures would be taken to best prevent access by vermin including sparrows, predatory birds, rats, mice, snakes, lice and worms all of which are detrimental to the birds well-being.

Sanaullah Aman, a senior director at the Capital Development Authority (CDA) who had first prepared the plan for aviary when he was in-charge of Lake View Park project, told ‘The News’ that a team of experts hired by CDA suggested to import birds from Australia, Singapore, Japan and South Africa.

He said the aviary project was a part of Lake View project, which was aimed at providing a highly sophisticated recreational facility to the local visitors in line with the international standards.

The expression of interests (EoIs) were invited by local and foreign firms in September 2007, after which a firm was selected keeping in view its experience in development of wildlife habitat, environmental planning and availability of earth moving machinery, tower cranes and mixers.

Other features of the aviary include a hanging bridge between two observation gazebos over the lake, tame bird display areas, a souvenir shop, walkways, observation towers, elevated pathways, and a brooder and incubation room.

When contacted CDA Director Special Projects Sohail Ursani said the construction work on the aviary would hopefully be completed by March, which would be one of the exciting features of Lake View Park.

He said there are plans to procure rare species of birds at a cost of Rs10 million from such far off places as Australia, Singapore, Japan and South Africa.

All the species of birds would be provided with natural environment and these birds would also be protected against any harmful effects of local weather conditions, he said.

The aviary would be one of the most exciting features of the Lake View Park where some new attractive features are being furnished to make it a truly public recreational facility.

But there are many who have been showing reservations over some of the steps taken by CDA like introduction of motor-boating, apparently to enhance the scope of enjoyment for the visitors.

Those who oppose motor-boating are of the view that it has been continuously damaging the natural character of the park and after completion of aviary, the need for pure and natural environment would be further increased.

According to rough estimates, the motorboats in the Lake View Park in the peak season used to consume 500 litres of diesel per day. The latest research has revealed that a motor boat can consume only 70 per cent of diesel and emits remaining 30 per cent into the air, which means that 150 litres of raw diesel was being emitted daily in the air by these boats in the park.

http://www.thenews.com.pk/daily_detail.asp?id=158872
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
Aviary to be completed by March - LahoreEstate - 01-24-2009 10:53 AM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 636 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Good news: Margalla Avenue to be Completed ‘Very Soon’ – Chairman CDA LRE-Azan 0 1,200 01-21-2023 01:15 PM
Last Post: LRE-Azan
  HYDERABAD-SUKKUR MOTORWAY TO BE COMPLETED IN 2 YEARS LRE-Azan 0 898 01-18-2023 03:07 PM
Last Post: LRE-Azan
  Rawal Dam Chowk Interchange likely to be completed by June 2022 LRE-Azan 0 1,767 12-15-2021 05:48 PM
Last Post: LRE-Azan
  LOS dual carriageway to be completed by May Salman 0 4,431 01-27-2014 07:10 PM
Last Post: Salman
  Property Tax Survey Completed By Excise Department Salman 0 6,486 11-19-2013 04:51 PM
Last Post: Salman
  Railway bridge project to be completed by November 30 Salman 0 11,007 10-10-2013 01:22 PM
Last Post: Salman
  All NHA projects to be completed in stipulated time: Arbab Salman 0 9,429 08-17-2013 12:55 PM
Last Post: Salman
  Pir Wadhai project to be completed by June 31 Salman 0 4,922 06-04-2013 11:38 AM
Last Post: Salman
  RDA expedites work, but project unlikely to be completed on time Salman 0 5,297 06-01-2013 03:29 PM
Last Post: Salman
  7,100 MW Bunji Dam’s detailed engineering design completed Salman 0 5,200 05-07-2013 06:37 PM
Last Post: Salman
  Work restarts, project likely to be completed next month Salman 0 5,117 04-23-2013 12:08 PM
Last Post: Salman
  Work on service roads could not be completed despite passage of deadline Salman 0 4,845 03-12-2013 07:38 PM
Last Post: Salman
  Mareer Tunnel project to be completed in time Salman 0 5,463 03-11-2013 07:51 PM
Last Post: Salman
  Mareer Chowk tunnel project to be completed by March 15 Salman 0 5,350 01-10-2013 01:25 PM
Last Post: Salman
  Sixth road fly over to be completed by Jan 6 Salman 0 4,150 01-02-2013 12:44 PM
Last Post: Salman
  Sixth Road Flyover likely to be completed in five days Salman 0 4,935 01-01-2013 07:05 PM
Last Post: Salman
  6th Road flyover to be completed in December Salman 0 4,982 11-14-2012 01:15 PM
Last Post: Salman
  Shahrah-i-Quaideen Will Be Completed Soon Salman 0 3,997 11-02-2012 04:33 PM
Last Post: Salman
  Mareer Chowk underpass detailed design has been completed Salman 0 5,655 09-25-2012 03:46 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)