DHA Cogeneration Plant not a dependable source anymore’
02-18-2009, 09:19 AM
Post: #1
DHA Cogeneration Plant not a dependable source anymore’
Wednesday, February 18, 2009
Karachi

The water requirements of Defence Housing Authority (DHA) are expected to double or even treble over the next couple of years, while the DHA Cogeneration Plant (COGEN) is no longer a dependable source to provide smooth supply of water to Defence residents, said Asad H. Kizilbash, Honorary General Secretary of the Defence Society Residents Association (DSRA) and Association of Defence Residents (ADR) on Tuesday.

“I fear a drought-like situation in Defence in a few years, as massive construction is taking place that necessitates a sizeable water supply,” said Kizilbash. “I have serious doubts about the technical workability of COGEN, as reports given by COGEN’s foreign officials show that COGEN systems have 25 per cent failure rates across the world,” he added. He further said that the plant is still shut down, and is financial arrangements are being awaited to import parts needed.

He also said that DHA is fast constructing houses on vacant plots between Phases I to VI. along with Phase VI and VIII, and this construction would greatly increase water requirements. The minimum water requirement of DHA is 12 million gallons per day (MGD), while the Karachi Water and Sewerage Board (KWSB) is supposed to provide 9 million gallons on a daily basis. However the KWSB only provides 7 to 8 MGD water to Defence, he said. COGEN was supposed to provide 3 MGD water, but it is closed now. As a result, DHA is facing a shortage of 4 to 5 MGD water everyday, he pointed out.

DHA wanted to install another COGEN plant, and the authority has probably ordered buying its engine as well. However, they are facing certain legal problems and questions are being raised regarding its efficiency, which is causing delays, he said.

“Instead of depending on one or two COGENs, I have recommended that a direct water pipeline should be taken from Pipri to Defence, because it would be a more dependable source,” he emphasised. There are flaws in DHA distribution system and Defence residents’ representatives are holding meeting with Cantonment to analyze the defects of distribution system, Kizilbash said.

He pointed out that efforts are being made for an alternate of water source, as it is understood that the intake arrangement consists of a 2 meter diameter open pipeline which is suspended 5 meters above the sea bed at a distance of 26 meters. According to COGEN officials, silting due to beachfront development and reclamation of land has reduced the depth of the intake source to only 3 meters from the original 5-meters, which is likely to create ongoing problems for the COGEN plant’s operations in the future, he added.

Technology is available to extend the length of the intake pipe to deeper levels to prevent any future problems, especially when another engine has been ordered to build another plant right next to the present plant to double its capacity. But due to lack of financing, the water intake arrangement is not likely to be improved, he added.

The most serious development, which might further delay the plant from operating, is the accusation of unethical transfer of ownership and breach of contract by the leading bank of their banking consortium, he said. Banks have further accused them of their inability to pay back their loans. UBL has sued them in the Sindh High Court and requested the court to appoint an Administrator, he added.

http://www.thenews.com.pk/daily_detail.asp?id=163244
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
DHA Cogeneration Plant not a dependable source anymore’ - LahoreEstate - 02-18-2009 09:19 AM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Chinese Group Interested in Building an Industrial Plant in Punjab LRE-Azan 0 896 03-01-2023 08:09 PM
Last Post: LRE-Azan
  Pakistan’s first waste-to-energy plant with 40-megawatt Production Capacity LRE-Azan 0 4,460 07-18-2018 04:26 PM
Last Post: LRE-Azan
  300MW Plant In Gwadar will supply Free Electricity To Aarea issued LRE-Azan 0 5,223 01-17-2018 05:05 PM
Last Post: LRE-Azan
  Chinese company to set up 300MW solar power plant in Cholistan Salman 0 9,847 08-03-2013 12:55 PM
Last Post: Salman
  Fast work on sewage treatment plant decided Salman 0 4,907 05-01-2012 01:49 PM
Last Post: Salman
  Turkish plant to start generating 56MW in Dec’ Salman 0 4,729 03-09-2012 12:18 PM
Last Post: Salman
  Defence power plant likely to fall under new management Salman 0 6,264 02-01-2012 01:15 PM
Last Post: Salman
  CDA fails to run sewerage treatment plant Lahore_Real_Estate 0 4,099 01-03-2012 11:53 AM
Last Post: Lahore_Real_Estate
  DHA to take back Cogen power plant from Ashmore Lahore_Real_Estate 0 4,226 08-18-2011 03:25 PM
Last Post: Lahore_Real_Estate
  17% GST likely on agri plant machinery Lahore_Real_Estate 0 4,137 06-01-2011 12:22 PM
Last Post: Lahore_Real_Estate
  Govt asks China to establish car plant in EPZs Lahore_Real_Estate 0 4,211 12-18-2010 03:52 PM
Last Post: Lahore_Real_Estate
  SC acts against shady rental plant deal Lahore_Real_Estate 0 4,177 12-08-2010 01:18 PM
Last Post: Lahore_Real_Estate
  UK-based company plans to set up 21 megawatts power plant in Karachi Lahore_Real_Estate 0 4,532 10-13-2010 12:51 PM
Last Post: Lahore_Real_Estate
  China to build 1GW nuclear power plant in Pakistan Lahore_Real_Estate 0 5,167 09-21-2010 11:49 AM
Last Post: Lahore_Real_Estate
  China in talks to export Pakistan bigger nuke plant Lahore_Real_Estate 0 4,083 09-20-2010 02:07 PM
Last Post: Lahore_Real_Estate
  UAE gifts power plant to Pakistan Lahore_Real_Estate 0 3,794 09-16-2010 12:02 PM
Last Post: Lahore_Real_Estate
  Aamer, Asif axed from awards list: source Lahore_Real_Estate 0 3,796 09-04-2010 12:34 PM
Last Post: Lahore_Real_Estate
  Shahbaz opens $32 million new Coca-Cola plant Lahore_Real_Estate 0 4,924 05-13-2010 12:57 PM
Last Post: Lahore_Real_Estate
  Gwadar: GDA demands Rs 1.5 Billion for Desalination Plant LRE 1 6,251 05-12-2010 09:58 AM
Last Post: LRE
  Water Treatment Plant Ordered to Companies Polluting Ravi LRE 0 3,821 04-03-2010 08:58 PM
Last Post: LRE