The following warnings occurred:
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 802 - File: showthread.php PHP 7.4.29 (Linux)
File Line Function
/showthread.php 802 errorHandler->error





Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
CDA restores 2 MGD water supply to RCB
04-15-2009, 08:26 AM
Post: #1
CDA restores 2 MGD water supply to RCB
* Supply was cut from nine MGD to seven MGD on non-payment of outstanding dues
* Ministry of Defence assures CDA of dues payment
* WASA sees no water crisis this summer

By Aamir Yasin

RAWALPINDI: Capital Development Authority (CDA) on Tuesday restored two million gallons daily (MGD) water supply to Rawalpindi Cantonment Board (RCB) from Khanpur Dam that was cut off in January.

The CDA had reduced the supply from nine MGD to seven MGD as the RCB had failed to pay its share of loan to the authority, which had to pay foreign loans obtained for the Rs 6.82 billion Khanpur Dam Project (Metropolitan Water Supply Project) as well as huge interest, the sources told Daily Times.

The RCB gets nine MGD water from Khanpur Dam and pays the CDA for it, they said, adding, however RCB had made no payment to CDA for the last one-year citing funds’ shortage as a reason. The RCB water related outstanding payment to CDA now amounts to Rs 93 million, they added.

Presently, RCB receives 9 MGD water from Khanpur Dam and 5 MGD from 53 tube wells in the cantonment limits, while the daily water needs of the cantonment are 19 MGD, said the sources.

Ministry of Defence: The sources said RCB had requested the Ministry of Defence to play its role in restoration of water supply, as the civic body was facing acute water shortage and the situation would further worsen in summer season if the water supply were not restored.

After assurance from the Ministry, the CDA restored the water supply without any payment, they said. They said the RCB had not given any timeframe for payment of outstanding dues.

They said due to cut on water supply, the residents of cantonment localities were facing hardship, as the civic body had introduced water-rationing system.

They said more than 300 complaints were being registered daily with the RCB for past two months, as a few tube-wells were not sufficient to meet water requirement of thickly populated localities of cantonment.

WASA: Water and Sanitation Agency (WASA) on Tuesday ruled out the possibility of water shortage in the town in coming summer, claiming Rawal and Khanpur dams will have enough water in the days ahead for the next one year.

WASA Deputy Managing Director Chaudhry Naseer told Daily Times that water was being supplied to Rawalpindi city from Rawal and Khanpur dams, and 270 tube wells. He said water level was 33,000 acres feet in Rawal Dam against the storage capacity of 37,000 acres feet and 50,000 acres feet in Khanpur Dam against the storage capacity of 93,000 acres feet. The water is enough to last five to six months, he said.

Rains: The WASA official said more rains in the days ahead, especially during monsoon, would improve water situation in the dams.

“I can claim with confidence that there’ll be no water crisis this summer. We’ll have enough water in Rawal and Khanpur dams in future to meet the twin cities’ needs for the next 350 days,” he said.

Naseer said Khanpur Dam supplied 100 acres feet water to the agency, Rawalpindi Cantonment Board (RCB) and Capital Development Authority (CDA), and Rawal Dam 90 acres feet water to Rawalpindi city on a daily basis.

http://www.dailytimes.com.pk/default.asp...009_pg11_1
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
CDA restores 2 MGD water supply to RCB - LahoreEstate - 04-15-2009 08:26 AM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  300MW Plant In Gwadar will supply Free Electricity To Aarea issued LRE-Azan 0 5,223 01-17-2018 05:05 PM
Last Post: LRE-Azan
  Indian PM’s offer to supply 5,000MWIndian PM’s offer to supply 5,000MW Salman 0 4,279 03-31-2012 01:45 PM
Last Post: Salman
  CDA to acquire land for water supply project Lahore_Real_Estate 0 4,158 02-27-2012 12:20 PM
Last Post: Lahore_Real_Estate
  CDA claims of potable water, dirty as water supplied Salman 0 4,959 11-28-2011 11:04 AM
Last Post: Salman
  Five-day weekly gas supply to Faisalabad from today Lahore_Real_Estate 0 3,601 03-04-2011 05:12 PM
Last Post: Lahore_Real_Estate
  Gas supply to Punjab industry suspended Lahore_Real_Estate 0 4,108 12-13-2010 01:31 PM
Last Post: Lahore_Real_Estate
  Nato supply line will re-open when security improves: FO Lahore_Real_Estate 0 4,276 10-04-2010 02:27 PM
Last Post: Lahore_Real_Estate
  LHC restores security protocol for Dr Abdul Qadeer Khan Lahore_Real_Estate 0 3,934 09-28-2010 02:55 PM
Last Post: Lahore_Real_Estate
  Gas and oil supply disruption causes 3,500MW shortfall Lahore_Real_Estate 0 3,827 08-12-2010 12:07 PM
Last Post: Lahore_Real_Estate
  Trading firms may supply Indian sugar to Pakistan Lahore_Real_Estate 0 4,167 08-12-2010 11:57 AM
Last Post: Lahore_Real_Estate
  Turkmenistan plans to supply electricity to Pakistan Lahore_Real_Estate 0 3,597 08-12-2010 11:44 AM
Last Post: Lahore_Real_Estate
  NATO supply should be taxed LRE 0 4,033 06-30-2010 11:56 PM
Last Post: LRE
  Gwadar: NATO Team Arrives for Logistic Supply LRE 0 3,577 03-29-2010 02:31 AM
Last Post: LRE
  World Water Day today: Clean drinking water still a distant dream Lahore_Real_Estate 0 4,681 03-22-2010 03:25 PM
Last Post: Lahore_Real_Estate
  Substandard Floor Supply to "Sasta Tanoor" Project LRE 0 3,233 01-27-2010 11:38 AM
Last Post: LRE
  Water conservation campaign: CDA to impose heavy fines on residents for water wastage LahoreEstate 0 4,709 01-20-2010 10:02 AM
Last Post: LahoreEstate
  Murree villagers protest supply of gas to Shahbaz’s residence LahoreEstate 0 3,874 11-21-2009 07:18 AM
Last Post: LahoreEstate
  Sindh: Lease and transfer of land: Govt restores powers of nazims Naveed Yaseen 0 3,945 11-15-2009 06:22 AM
Last Post: Naveed Yaseen
  "Black Water" or "Green Water"...? LRE 0 10,040 10-12-2009 11:17 AM
Last Post: LRE
  KESC disconnects power supply to Pakistan Steel Mills Naveed Yaseen 0 4,059 10-04-2009 06:17 AM
Last Post: Naveed Yaseen

Forum Jump:


User(s) browsing this thread: 1 Guest(s)