The following warnings occurred:
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 802 - File: showthread.php PHP 7.4.29 (Linux)
File Line Function
/showthread.php 802 errorHandler->error





Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Karachi: Violence erupts against prolonged power outages
05-17-2009, 04:34 AM
Post: #1
Karachi: Violence erupts against prolonged power outages
The worsening power supply situation in the city took an ugly turn on Saturday as people resorted to violence and rioting against prolonged power breakdowns.

Around midday, people took to the streets near Ayesha Manzil, Shahrah-e-Pakistan, and in a few moments, their protest against prolonged power failures turned violent, hampering the flow of vehicular traffic on the main artery.

The protestors lit a bonfire by setting old tyres and other junk on fire and also pelted stones at passing vehicles. The police and local body representatives of the area had to intervene to assuage the violence.

According to some reports, the police had to fire tear gas canisters to disperse the protestors who had caused disruption in the smooth flow of traffic on a major road for a considerable period of time.

Official Karachi Electric Supply Company (KESC) sources said that the area in question was without electricity due to a fault in the underground cable system near Federal ‘B’ Area for which the KESC staff had been attending to the complaint. The work of the KESC complaint staff had been delayed owing to an undue intervention in the repair work by the city government personnel. Sources said that a complaint vehicle of a KESC contractor also came under attack by the protestors.

Meanwhile, the Gulberg police, on behalf of the state, registered a case against unidentified people for resorting to violence and protesting near Ayesha Manzil. The Gulberg police said that no arrests had been made so far.

Meanwhile, the mercury touched maximum 37 degree Centigrade with 57 per cent humidity, while residents of Federal ‘B’ Area, Nazimabad, Saddar, Malir, Gulshan-e-Iqbal, Clifton, and old areas of the city complained against prolonged instances of power breakdown.

The KESC said that around 7:30 pm the demand of electricity in the city was 2,294 Megawatts (MW), and that the power utility resorted to load-shedding of 275MW. Other independent sources privy to the power supply situation said that the privatised KESC resorted to a maximum load-shedding of around 400MW.

http://www.thenews.com.pk/daily_detail.asp?id=178002
Quote this message in a reply
Post Reply 


Messages In This Thread
Karachi: Violence erupts against prolonged power outages - Naveed Yaseen - 05-17-2009 04:34 AM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Controversy erupts as complaints of maladministration in property valuations rock FBR LRE-Azan 0 725 05-20-2023 04:27 PM
Last Post: LRE-Azan
  Punjab boils under prolonged power cuts Lahore_Real_Estate 0 3,337 10-03-2011 03:00 PM
Last Post: Lahore_Real_Estate
  Township industry warns of protest against outages Lahore_Real_Estate 0 4,086 09-30-2011 05:40 PM
Last Post: Lahore_Real_Estate
  Property tax recovery decline blamed on violence, old rates Lahore_Real_Estate 0 3,865 06-01-2011 12:20 PM
Last Post: Lahore_Real_Estate
  Film festival held to raise awareness about violence against women Lahore_Real_Estate 0 4,387 03-04-2011 05:12 PM
Last Post: Lahore_Real_Estate
  UK-based company plans to set up 21 megawatts power plant in Karachi Lahore_Real_Estate 0 4,529 10-13-2010 12:51 PM
Last Post: Lahore_Real_Estate
  Industrial Violence LRE 0 3,063 03-06-2010 11:39 PM
Last Post: LRE
  Karachi: City’s 1st rental power plant inaugurated LahoreEstate 0 4,529 01-14-2010 08:52 AM
Last Post: LahoreEstate
  Lahore: Massive power outages hit City again LahoreEstate 0 4,531 12-20-2009 10:33 AM
Last Post: LahoreEstate
  ‘Karachi to get rented power from next month’ LahoreEstate 0 3,460 11-23-2009 06:43 AM
Last Post: LahoreEstate
  Edhi wins top UN prize for non-violence Naveed Yaseen 0 3,305 10-21-2009 05:31 AM
Last Post: Naveed Yaseen
  Karachi:KESC threatens to stop DHA power supply LahoreEstate 0 4,529 09-28-2009 06:18 AM
Last Post: LahoreEstate
  Lahore: Model town community centre facing prolonged delays Naveed Yaseen 0 5,077 09-24-2009 05:12 AM
Last Post: Naveed Yaseen
  Thar Coal Power Project: Sindh, Engro sign agreement for power generation LahoreEstate 0 6,771 09-09-2009 06:37 AM
Last Post: LahoreEstate
  Pakistan saved China from embarrassment on Xinjiang violence: Chinese ambassador Naveed Yaseen 0 3,349 09-05-2009 05:25 AM
Last Post: Naveed Yaseen
  Karachi: DHA Cogen power, desalination plant recommissioned Naveed Yaseen 0 5,847 08-28-2009 05:30 AM
Last Post: Naveed Yaseen
  Current extra power production capacity idle, Rs 200bn for new power projects Naveed Yaseen 0 3,596 08-12-2009 09:21 AM
Last Post: Naveed Yaseen
  Power Generation: Two power plants to be operational soon: Mian Mansha LahoreEstate 0 4,342 08-09-2009 06:04 AM
Last Post: LahoreEstate
  Karachi: Island sees the light, puts wind-power to work LahoreEstate 0 3,728 07-31-2009 08:47 AM
Last Post: LahoreEstate
  Karachi: NEPRA may take control of KESC, Power tariff to increase by Rs 3 per unit Naveed Yaseen 0 2,990 07-26-2009 06:23 AM
Last Post: Naveed Yaseen

Forum Jump:


User(s) browsing this thread: 1 Guest(s)