The following warnings occurred:
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 802 - File: showthread.php PHP 7.4.29 (Linux)
File Line Function
/showthread.php 802 errorHandler->error





Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
India shelves project to interlink rivers after Bangladesh complaint in UN
10-06-2009, 05:55 AM
Post: #1
India shelves project to interlink rivers after Bangladesh complaint in UN
* Minister says project to be human, economic, ecological disaster
* Jairam Ramesh says Kishanganga power project to continue

By Iftikhar Gilani

NEW DELHI: India has finally shelved an ambitious project to interlink rivers after Bangladesh lodged a complaint with the United Nations.

The project, envisaged by the previous National Democratic Alliance (NDA) government, was expected to cost Rs 5.6 trillion. India’s Minister of State for Environment and Forests Jairam Ramesh said on Monday that the project would be a “human, economic and an ecological disaster”.

Project: He, however, said the plans to divert River Neelam’s water to construct the 330MW Kishanganga power project near Wullar Lake would continue. The minister’s declaration came nearly a month after the Congress party’s general secretary and scion, Rahul Gandhi, opposed the idea at a press interaction in Chennai. He had raised questions on the environmental feasibility of the project. “It is a disastrous idea. It is an idea that will be extremely dangerous to the environment of the country,” he said.

Asked if no more environmental clearances would come on linking rivers, Jairam said he was not opposed to local-level inter-basin transfer of waters. Favouring Ken-Betwa (North India) and Krishna-Godavari (South India) linking projects, he said all other projects would be taken on a case-to-case basis.

Jairam said the issue of interlinking rivers had international ramifications as well. Bangladesh and Nepal had already expressed their apprehensions, with the former even lodging a complaint against India with the United Nations, he said.

When then prime minister Atal Bihari Vajpayee had abdicated office following the electoral rout of NDA in May 2004 polls, he had personally scribbled a request for his successor Dr Manmohan Singh, asking him to continue with his two ambitious projects – the Golden Quadrilateral – under which the four metros were to be connected directly through road to boost traffic and trade and the interlinking of rivers.

Vajpayee had set up a task force under Suresh Prabhu in October 2002 for activating the river-linking project in the background of the severe drought that year. The task force in its report divided the project into the Himalayan component involving northern rivers and peninsular component with southern rivers.

The Himalayan component envisaged construction of storage reservoirs

on the main Ganges and Brahmaputra rivers and their principal tributaries in India and Nepal so as to conserve monsoon flows for irrigation and hydro-power generation, besides flood control. It had identified 14 links involving, Kosi-Mech, Kosi-Ghagra, Gandak-Ganges, Ghagra-Yamuna, Sarda-Yamuna, Yamuna-Rajasthan, Rajasthan-Sabarmati, Brahmaputra-Ganges, Farakka-Sunderbans, Ganges-Damodar-Subernarekha and Subernarekha-Mahanadi rivers.

The peninsular component involved development of a ‘Southern Water Grid’ envisaging 16 linkages. The peninsular component included diversion of surplus flows of Mahanadi and Godavari rivers to Krishna, Pennar, Cauvery and Vaigai, diversion of west-flowing rivers of Kerala and Karnataka to the east and interlinking small rivers flowing along the west coast.

The task force had concluded that linking rivers would increase irrigation potential to 160 million hectare for all crops by the year 2050, while the maximum irrigation potential that could have been created through conventional sources had been estimated at 140 million hectare.

http://www.dailytimes.com.pk/default.asp...009_pg7_15
Quote this message in a reply
Post Reply 


Messages In This Thread
India shelves project to interlink rivers after Bangladesh complaint in UN - Naveed Yaseen - 10-06-2009 05:55 AM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Sector I-15: CDA shelves uplift plan Salman 0 9,331 11-09-2013 04:29 PM
Last Post: Salman
  Bangladesh after 40 Years! LRE 0 3,207 07-06-2011 04:33 PM
Last Post: LRE
  Karachiites lodge complaint against cleric for threatening Sherry Lahore_Real_Estate 0 3,076 01-10-2011 02:17 PM
Last Post: Lahore_Real_Estate
  Donations, Corruption & BanglaDesh Model (Nazeer Naji) LRE 0 3,623 10-28-2010 10:21 AM
Last Post: LRE
  India bound to inform Pakistan before releasing water into rivers' Lahore_Real_Estate 0 3,892 08-28-2010 12:27 PM
Last Post: Lahore_Real_Estate
  Complaint Against WASA: 3 Residents/Affectees Arrested!!! LRE 0 5,291 07-25-2010 03:01 PM
Last Post: LRE
  Performance of Citizen Complaint Centre 1339 reviewed Lahore_Real_Estate 0 4,102 05-01-2010 10:16 AM
Last Post: Lahore_Real_Estate
  Pak Rivers turned into "ganda nala" LRE 0 3,614 03-16-2010 11:09 AM
Last Post: LRE
  Girameen Bank, Bangladesh & IMF! LRE 0 3,016 02-02-2010 11:34 AM
Last Post: LRE
  thanks to america: india gets what india was dying for (trade with afghanistan through Wagah) LRE 13 37,303 01-27-2010 11:33 AM
Last Post: LRE
  7 Days in BanglaDesh LRE 0 3,146 11-27-2009 02:23 PM
Last Post: LRE
  India says it can construct more dams on western rivers Naveed Yaseen 0 3,360 11-26-2009 08:44 AM
Last Post: Naveed Yaseen
  Lahore: CDA shelves plan to install 20 more filtration plants Naveed Yaseen 0 3,875 11-12-2009 05:45 AM
Last Post: Naveed Yaseen
  Lahore: CDGL shelves plans for parking lots at MM Alam, The Mall LahoreEstate 0 3,636 10-26-2009 07:30 AM
Last Post: LahoreEstate
  India: Massive war games show deepening India-US ties Naveed Yaseen 0 4,429 10-13-2009 05:46 AM
Last Post: Naveed Yaseen
  Islamabad: CDA shelves Rapid Mass-Transit and CNG bus service projects Naveed Yaseen 0 4,344 10-10-2009 07:00 AM
Last Post: Naveed Yaseen
  CM’s Complaint Cell officials quarrel to address complaint of singer Humaira Arshad Naveed Yaseen 0 7,844 10-08-2009 07:40 AM
Last Post: Naveed Yaseen
  Lahore: UAE shelves Rs102b tallest building project in City: Pervaiz LahoreEstate 0 4,702 09-13-2009 03:51 AM
Last Post: LahoreEstate
  India plans 6,000MW power project in Iran Naveed Yaseen 0 3,085 08-25-2009 07:43 AM
Last Post: Naveed Yaseen
  Bangladesh exports up 10.3% Naveed Yaseen 0 3,085 08-06-2009 06:56 AM
Last Post: Naveed Yaseen

Forum Jump:


User(s) browsing this thread: 1 Guest(s)