Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Lahore Ring Ring Development Update : Govt considering change to Southern Loop design
07-05-2013, 02:41 PM (This post was last modified: 07-05-2013 02:43 PM by Salman.)
Post: #1
Lahore Ring Ring Development Update : Govt considering change to Southern Loop design

Proposed changes would push road closer to Ravi in city’s southwest.

LAHORE:

The government is considering changing the design of the Ring Road’s Southern Loop, pushing it closer to the River Ravi in the city’s southwest. The proposed changes affect the fourth section of the Southern Loop and would introduce a fifth section not included in the original design.

Meanwhile, construction of the first three sections, or packages, has been approved by the provincial government. These will extend the Ring Road from Kamahan to Maraka on Multan Road. Bid documents for these packages have already been prepared.

The National Engineering Services of Pakistan (Nespak) is preparing a more detailed design for the new route and this will be formally presented to the chief minister by the Lahore Ring Road Authority (LRRA) in a meeting which has not yet been scheduled.

The proposed design changes were shown to the chief minister and prime minister at a meeting on June 22 in the form of lines drawn on satellite images and cost estimates. If approved, the changes will add around 14 kilometres, and many billions of rupees in construction costs, to the original Southern Loop design.

The idea behind the realignment of the Southern Loop closer to the River Ravi was to build economic zones along the route in order to create revenue-generating opportunities for the LRRA, according to officials. The Transport Department, which was preparing to auction 88 sites for D-class parking stands, has postponed the bidding at 66 sites in view of the proposed changes to the Ring Road route.

The 40-km Northern Loop of the Ring Road, running clockwise from Ghulshan-i-Ravi to Kamahan, was finished last year. According to the current design, the Southern Loop is to run for 49 kilometres from Kamahan to Thokar Niaz Beg, from where traffic could use the Motorway (M2) to travel to Babu Sabu. From there, a two-kilometre section would be built till Gulshan-i-Ravi to complete the circle. The total construction cost for the Southern Loop was estimated at around Rs70 billion.

Under the proposed changes, the fourth section of the Southern Loop would be pushed further towards the Ravi. Seven kilometres would be added to the initial design so that this package would be 25km long. The added stretch would run parallel to the M2, which would then not be needed to complete the ring. A new fifth package of 8km would then be added, 6km of it running alongside Package 1 of the Northern Loop/Bund Road. The Southern Loop would join the Northern Loop at Niazi Interchange. With the additions, the project would cost an estimated Rs93 billion to build.

A Punjab government official said that additions could result in the overall cost of the Southern Loop, which is to be constructed in partnership with private entities, spiralling from around Rs200 billion to Rs260 billion. If approved, the changes would also delay the bidding of the construction contract for five or six months so new concession agreements could be drawn up for packages 4 and 5.

LRRA Chairman Rashid Mehmood Langrial said that no decision had yet been made on the proposed design changes. He said that the Steering Committee for Public-Private Partnerships had approved construction of sections one to three of the Southern Loop.

Package 1 of the Southern Loop would consist of 9.35km of road connecting the Ring Road to Ferozepur Road, with a construction cost of Rs18.65 billion. Package 2 from Ferozepur Road (Gajju Mata) to Adda Plot would be 13km long and cost Rs31.94 billion to build. Package 3, from Adda Plot to Maraka, would be 8km long and cost Rs13.60 billion.


http://tribune.com.pk/story/572737/ring-...op-design/
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Rawalpindi Ring Road Set for Grand Inauguration on August 14, 2024 LRE-Azan 0 1,056 01-25-2024 03:41 PM
Last Post: LRE-Azan
  Commissioner Announces Key Milestones and Schedule for Rawalpindi Ring Road Project LRE-Azan 0 1,180 01-23-2024 03:37 PM
Last Post: LRE-Azan
  Rawalpindi Commissioner Confirms Limited Access to Rawalpindi Ring Road for Housing S LRE-Azan 0 625 01-10-2024 06:07 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Anticipated Launch in August LRE-Azan 0 559 01-05-2024 07:12 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road (RRR) Project: 12% Completion, Anticipated Opening in August LRE-Azan 0 643 01-02-2024 06:14 PM
Last Post: LRE-Azan
  CM Mohsin Naqvi Reviews Impressive 60% Completion of Lahore Ring Road Southern Loop-3 LRE-Azan 0 671 12-28-2023 12:49 PM
Last Post: LRE-Azan
  NHA and CDA Resolve T-Chowk Design Dispute Amicably LRE-Azan 0 559 11-14-2023 02:56 PM
Last Post: LRE-Azan
  CM Punjab Visits Ring Road Southern Loop-3 Ahead of its Opening LRE-Azan 0 623 10-14-2023 03:24 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 635 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Accelerates Towards Completion in One Year LRE-Azan 0 747 10-04-2023 07:17 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Faces Complication of Missing Land Record LRE-Azan 0 713 09-13-2023 07:36 PM
Last Post: LRE-Azan
  Ring Road SL3 Impact on Housing Societies: In-Depth Analysis LRE-Azan 0 636 09-02-2023 02:53 PM
Last Post: LRE-Azan
  SSH, An International Construction Company, To Design Its First Signature Tower Proje LRE-Azan 0 1,001 02-11-2023 05:48 PM
Last Post: LRE-Azan
  Lahore: Ring Road Authority Increased Toll Tax from Rs. 5 to 50 LRE-Azan 0 1,432 12-23-2021 07:34 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Among Rs265.281bln Projects Approved By ECNEC LRE-Azan 0 2,055 12-23-2021 07:27 PM
Last Post: LRE-Azan
  Capital Development Authority Update LRE-Azan 0 1,568 12-18-2021 02:21 PM
Last Post: LRE-Azan
  Capital Development Authority Update LRE-Azan 0 1,558 12-11-2021 07:52 PM
Last Post: LRE-Azan
  Ravi Development Authority Update LRE-Azan 0 1,574 11-20-2021 03:16 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project New Design is Ready LRE-Azan 0 1,672 11-20-2021 12:22 PM
Last Post: LRE-Azan
  Rawalpindi: Ring Road Project, Rs. 24 Billion Approved in PC-1 LRE-Azan 0 1,480 10-27-2021 01:04 PM
Last Post: LRE-Azan

Forum Jump:


User(s) browsing this thread: 1 Guest(s)