Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Islamabad: Zero Point Interchange project: CDA opens two loops to ease traffic flow
11-27-2009, 08:24 AM
Post: #1
Islamabad: Zero Point Interchange project: CDA opens two loops to ease traffic flow
By Fazal Sher

ISLAMABAD: Capital Development Authority (CDA) on Thursday opened two loops of the under-construction Zero Point Interchange (ZPI) for traffic to facilitate the motorists.

The first loop connects Islamabad Highway with Kashmir Highway (towards Peshawar Mor) and the second links Kashmir Highway from Peshawar Mor side to Faisal Avenue. CDA Chairman Imtiaz Inayat Elahi visited the site to view the progress on the project. CDA Member Engineering Abdul Jabbar Malano, Project Director Mumtaz Hussain and Senior Superintendent of Police (Traffic) Dr Moeen Masood were present on this occasion.

CDA has opened two loops of Zero Point Interchange on the directives of CDA chairman, however, Prime Minister Syed Yousuf Raza Gilani will formally inaugurate the project on CDA’s request, said a senior official of CDA.

Elahi directed the CDA member engineering and other officials concerned to take appropriate steps to ensure smooth flow of traffic.

He directed the officials to make an exit from Sector G-8 in the wake of increased traffic flow due to opening of the two loops of the interchange.

The member engineering told the CDA chairman that to deal with the situation a roundabout had been constructed at Service Road East at the junction of Sector G-8/3 and G-8/4 and opened for traffic. He said the existing entry point to Sector G-8 at ZTBL crossing had been closed and shifted about 200 meters ahead, where a new roundabout has been constructed.

This would not only provide enough space for free movement of traffic coming from Kashmir Highway onto Faisal Avenue but it would also help ease the traffic taking U-turn from Faisal Avenue to enter Sector G-8, said the member engineering.

Elahi advised the officials concerned for timely completion of the ZPI project so that the public may get the benefit as envisaged. The project would complete in two years.

The authorities had started its construction in September 2008 and it would be completed in September 2010. The design is in shape of cloverleaves. It includes four loops and four ramps with a length of 10 kilometers, he said.

http://www.dailytimes.com.pk/default.asp...009_pg11_1
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  CDA Unveils Blueprint for Model Village Project in Islamabad Capital Territory LRE-Azan 0 602 01-17-2024 06:13 PM
Last Post: LRE-Azan
  Funds Approved for Various Development Projects, Including Link Road Interchange in K LRE-Azan 0 652 01-01-2024 02:03 PM
Last Post: LRE-Azan
  CDA Proposes New Dam Project to Meet Islamabad Water Demand LRE-Azan 0 606 10-13-2023 07:55 PM
Last Post: LRE-Azan
  LDA extends tender opening date of Babu Sabu Interchange project LRE-Azan 0 1,006 01-26-2023 03:14 PM
Last Post: LRE-Azan
  IJP Road to open to traffic by the end of month LRE-Azan 0 931 01-26-2023 03:05 PM
Last Post: LRE-Azan
  (CDA) NHA Employees Residential Apartments Housing Project Islamabad Approved LRE-Azan 0 1,224 01-24-2023 03:16 PM
Last Post: LRE-Azan
  Rawal Dam Chowk Interchange likely to be completed by June 2022 LRE-Azan 0 1,766 12-15-2021 05:48 PM
Last Post: LRE-Azan
  Islamabad Expressway widening project on the cards Salman 0 5,960 04-09-2015 04:20 PM
Last Post: Salman
  Nine pre-qualify for Islamabad portion of metro bus project Salman 0 5,659 03-28-2014 02:28 PM
Last Post: Salman
  Islamabad Safe City Project to be launched Salman 0 5,234 03-22-2014 06:06 PM
Last Post: Salman
  CDA allocates Rs 4.3m for beautifying Zero Point Salman 0 3,944 01-20-2014 07:33 PM
Last Post: Salman
  Work on Azadi Chowk Interchange, New Circular Road Project starts Salman 0 8,674 01-16-2014 01:55 PM
Last Post: Salman
  Islamabad Bus Service Project approved Salman 0 4,905 01-06-2014 11:39 AM
Last Post: Salman
  CDA Yet To Start Construction Of Footpaths Along ZPI (Zero Point Interchange) Salman 0 8,052 10-31-2013 02:29 PM
Last Post: Salman
  Islamabad bus rapid transit project looks scrapped Salman 0 7,380 10-25-2013 12:24 AM
Last Post: Salman
  Rawalpindi-Islamabad metro bus project to launch in November Salman 0 5,704 06-20-2013 12:32 PM
Last Post: Salman
  Newly constructed flyover closed for traffic Salman 0 4,195 06-05-2013 06:40 PM
Last Post: Salman
  Shahbaz announces to start metro bus project from Lahore to Islamabad Salman 0 8,651 03-30-2013 11:38 AM
Last Post: Salman
  CM opens Model Town underpass Salman 0 5,672 01-15-2013 12:45 PM
Last Post: Salman
  Sixth Road flyover opened to traffic Salman 0 4,517 01-07-2013 12:27 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)