Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Gwadar port faces hurdles
09-28-2008, 10:31 AM
Post: #1
Gwadar port faces hurdles
By Aftab Maken
ISLAMABAD: The government’s lack of political will and some hidden forces are the main hurdles in the way of fully operationalising the Gwadar deep-sea port, it is reliably learnt.

The port, which is the third deep-sea port in the country, was inaugurated in March 2005 by then president Pervez Musharraf and became operational in March this year when first ship carrying 52,000 tonnes of wheat from Canada berthed at the port.

“Without the federal government’s active support, the Gwadar port cannot be operational and it will remain a dream to make it a hub of activities in the area and an alternative port for the rest of the country,” said Muhammad Salim Khan, Secretary Ports and Shipping, when asked for comments.

The federal government provided not only funds but also infrastructure facilities to the two main ports in Karachi in the recent past, he said.

According to experts, the port would prove to be a trade corridor for central Asian states, China and the Gulf as 60 per cent trade of oil and gas is done through this route. China has provided 80 per cent of Gwadar port’s $248 million initial development cost.

“It is the political will of the government that can only make the port operational, otherwise it is not economically viable to ship imported goods from other ports of the world,” said a member of a committee formed by the Economic Coordination Committee to report on the economic viability of the port.

The ECC of the cabinet, after the request of Balochistan Chief Minister Nawab Aslam Raisani, directed the authorities concerned to allow one-third of total imported wheat to be shipped to Gwadar but later changed the decision saying that the allocation should be made after reviewing economic viability of the shipments. Finally, the ECC formed a committee to submit a report for making the port operational.

“None of the shipping companies and importers were ready to offer lower bids for shipments to the Gwadar port compared to the Port Qasim and Karachi Port thus leaving no option for the authorities but to receive imported commodities at the two main ports,” said another member of the committee.

Another problem for imported goods at Gwadar is that the importers need extra Rs2,200 per tonne to transport the goods from Gwadar to Karachi or to Quetta via Sukkur as infrastructure facilities were yet to be completed, the official added.

Putting aside all these reservations about the Gwadar port, the ports and shipping secretary said, “there was celebration in the town when first ship from Canada docked at the port last year and businesses like hotelling and other related activities were in full swing.”

Citing another hurdle in the way of Gwadar port, a national leader from Balohcistan was of the view that a powerful lobby from Karachi was mainly behind this to block it as it would hurt activities at the ports in Karachi.

http://www.thenews.com.pk/daily_detail.asp?id=138291
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Senate Committee Explores Railway Connectivity Plans for Gwadar Port Linking ML-1 and LRE-Azan 0 660 01-19-2024 06:45 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Faces Complication of Missing Land Record LRE-Azan 0 719 09-13-2023 07:36 PM
Last Post: LRE-Azan
  Master plan for Gwadar smart port city to be finalized soon Salman 0 3,887 08-09-2017 03:02 PM
Last Post: Salman
  Gwadar Would Be Made A Modern Port City of International Standard Salman 0 4,964 07-19-2017 02:15 PM
Last Post: Salman
  Hurdles in dev of Park enclave housing project to be removed Salman 0 5,505 01-02-2014 01:31 PM
Last Post: Salman
  Linkage of Gwadar Port with Karakorum Highway will multiply Pakistan exports to China Salman 0 8,609 09-24-2013 11:42 AM
Last Post: Salman
  Agreement signed to hand over Gwadar Port to Chinese company Salman 1 13,557 02-20-2013 02:15 AM
Last Post: LRE
  CDA op against Afghan Basti faces glitch Salman 0 3,697 02-11-2013 08:51 PM
Last Post: Salman
  Pirwadhai Mor Flyover faces bottleneck Salman 0 3,695 01-10-2013 01:27 PM
Last Post: Salman
  CDA's Legal Action Slowed Down By Legal Hurdles Salman 0 3,749 01-03-2013 06:17 PM
Last Post: Salman
  Legal hurdles slow down CDA legal actions Salman 0 3,800 12-26-2012 12:22 PM
Last Post: Salman
  Handing over Gwadar port to China best solution: PEW Salman 0 5,936 09-12-2012 11:45 AM
Last Post: Salman
  Pakistan: CHEC Set to Run Gwadar Port LRE 0 5,570 09-04-2012 09:42 PM
Last Post: LRE
  PSA Sold Gwadar Port Rights to Chinese Company @ $ 288.00 Million LRE 0 8,339 08-31-2012 09:29 PM
Last Post: LRE
  Gwadar port to be taken over by Chinese company: Minister informs Senate body | Pak Navy Asked to Vacate Land LRE 3 13,978 08-30-2012 10:49 PM
Last Post: LRE
  Singapore port operator on way out of Gwadar LRE 0 5,830 08-11-2012 01:07 AM
Last Post: LRE
  The potential of Pakistan Gwadar Port Salman 0 5,606 08-03-2012 02:21 PM
Last Post: Salman
  China to Take Over Gwadar Port on Aug12, 2012 LRE 0 6,566 07-28-2012 11:47 PM
Last Post: LRE
  Gwadar Port to be Handed Over to China LRE 3 11,068 07-21-2012 03:53 AM
Last Post: LRE
  ‘Education City Project’ to move without any hurdles Salman 0 4,557 06-15-2012 01:43 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)