Tag: Safari Villas

  • Tour & Safari Homes: bahria Orchard Phase 4

    Bahria Orchard Phase 4 offers a well-planned environment for both residential living and commercial investments. Situated directly on Main Raiwind Road, opposite Phase 2, the sector provides direct connectivity for commuters traveling toward Raiwind from Adda Plot. At the entrance, visitors encounter significant commercial infrastructure, including large retail developments such as SQ Mall and Times Square Mall, which feature multi-story structures hosting commercial outlets, retail spaces, and apartments in various stages of completion.

    The layout of Phase 4 is structured into multiple distinct sectors, comprising Blocks G-1 through G-7. Across these sectors, buyers can find residential plot sizes catering to diverse needs, including five-marla, ten-marla, and one-kanal plot cuttings. Wide roadways serve as the backbone of the community, highlighted by a main boulevard of approximately 150 feet in width with a designated speed limit of 50 km/h, flanked by dedicated service lanes, landscaped green belts, and palm-lined medians.

    Community infrastructure within Phase 4 emphasizes resident convenience and daily living standards. The area includes prominent religious and recreational facilities, such as Jamia Masjid Riaz located near the initial sectors, neighborhood parks, and dedicated green spaces like the Fruit Garden developed in October 2018. Essential educational institutions, including Lahore Brain School, are established along the boundary adjoining Jia Bagga Road.

    Security operates around the clock with gated checkpoints, ensuring controlled entry across the sector's arterial roads. A key residential highlight in Block G-6 is the Safari Homes development, known for its Safari Villas. These two-story, five-marla homes feature an efficient layout designed for modern families.

    The ground level includes a secure front gate opening to a car porch suitable for a sedan, leading into a spacious main living hall with an optional partition for a drawing room. Adjacent to the living area is an open-concept kitchen with an attached rear laundry utility courtyard, as well as a ground-floor master bedroom equipped with built-in wardrobes and an en-suite bathroom. The upper level of a Safari Villa is accessed via an internal marble-finished staircase.

    The first-floor landing connects to an open terrace overlooking the front street, a dedicated storage alcove, and an expansive rear balcony. Accommodation upstairs includes two additional bedrooms and an attached washroom, creating a total three-bedroom layout. With multiple completed units, active finishing works, and high-rise commercial buildings rising along the main boulevards, Phase 4 continues to demonstrate steady development and growing on-ground occupancy.

    Contact information
    Name: Choudry Mujahid Yasin ( CMY )
    Phone: +923224929992 Whatsapp Available