One Central DHA Lahore moves steadily toward completion, showcasing modern master planning and infrastructure benchmarks. The development blends open environment aesthetics, walkable pathways, and advanced utility management to create a forward-looking community.
A core highlight of One Central DHA Lahore is its generous allocation of 27 percent of the project area to open spaces and environmental design. Expansive green grounds and broad walks promote walkability and ease of movement throughout the neighbourhood. An integrated smart network system supports community operations and infrastructure oversight with modern efficiency.
What sets One Central DHA Lahore apart is its dedicated focus on flood mitigation through rainwater harvesting. Throughout site infrastructure development, water management receives prioritized attention to safeguard the area from monsoon challenges and heavy downpours.
The flood mitigation mechanism operates through a systematic water harvesting and drainage cycle that begins as soon as rainfall occurs:
- 1. Surface Run-Off Collection When rain falls over the project, surface run-off is promptly captured through a comprehensive network of storm water drains, preventing water accumulation on streets and public walkways.
- 2. Diversion to Harvesting Tank From the storm drainage lines, the collected rainwater is routed directly into an on-site rainwater harvesting storage tank, centralizing excess run-off for controlled management.
- 3. Power and Pumping Activation To manage the storage levels effectively, dedicated generators and Variable Frequency Drives (VFD) are switched on to supply power to the heavy-duty pumping system. Once energized, the pumps activate to draw the stored water out of the harvesting tank.
- 4. Controlled Water Discharge The extracted storm water is directed away from the development and discharged into the Rohi Nala / Charrar Drain. This coordinated flow efficiently disposes of surplus volumes without burdening the local community roads.
This integrated rainwater harvesting and drainage system enables One Central DHA Lahore to effectively manage excess rainwater, substantially reduce flood risks, and maintain smooth, uninterrupted operations across varying weather conditions.
Contact information Name: Choudry Mujahid Yasin ( CMY ) Phone: +923224929992 Whatsapp Available