Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Completion of Walton Road dualisation costs Rs 221m :Lahore
04-08-2009, 07:34 AM
Post: #1
Completion of Walton Road dualisation costs Rs 221m :Lahore
Wednesday, April 08, 2009
By Our Correspondent

LAHORE

The project for rehabilitation and dualisation of the Walton Road, starting from the Ferozepur Road to the Khayabane-e-Iqbal Junctions, in the Lahore cantonment area, has been completed at a cost of Rs. 221 million.

LDA Director General Shahid Mehmood said this during a meeting here on Tuesday. He said dual carriageway was 36-feet wide on each side and a separate cycle track, with a width of three feet, had also been established along both sides of the road.

The director general said the remodelling of the two junctions had also been carried out under this project, besides constructing an underground drain for quick disposal of storm water for avoiding early depletion of road and ensuring its permanence. A six-feet wide footpath has been built on this drains for pedestrians, he added.

He said that traffic safety devices had been put up on this road and separate traffic lanes had been earmarked for speedy and slow moving vehicle, besides putting up traffic signs for the convenience of vehicles.

He said the work on the Lahore Roads Rehabilitation Programme (Phase-II), at a cost of more than Rs 14 billion, was being carried out vigorously and future requirements of city traffic were also being taken care of while designing the projects.

Beside remodelling and widening of a number of existing roads as well as constructing new roads linking the far flung areas of the city, the programme also includes building of Shalimar interchange in Mughal Pura at a cost of more than Rs 2 billion.

http://www.thenews.com.pk/daily_detail.asp?id=171359
Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Latest Updates on Cheel Chowk Flyover and Walton Road ADA Nala Project in Lahore LRE-Azan 0 58 11-12-2024 11:11 AM
Last Post: LRE-Azan
  PM Kakar Emphasizes Pakistan-China Collaboration for CPEC Project Completion LRE-Azan 0 628 01-23-2024 03:31 PM
Last Post: LRE-Azan
  CBD Punjab Boulevard and Walton Project Advancements Revealed LRE-Azan 0 586 01-09-2024 03:27 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road (RRR) Project: 12% Completion, Anticipated Opening in August LRE-Azan 0 647 01-02-2024 06:14 PM
Last Post: LRE-Azan
  CM Mohsin Naqvi Reviews Impressive 60% Completion of Lahore Ring Road Southern Loop-3 LRE-Azan 0 671 12-28-2023 12:49 PM
Last Post: LRE-Azan
  Signal-Free Walton Road Project: Tackling 18-Kilometer Infrastructure and Drainage Is LRE-Azan 0 598 12-11-2023 04:06 PM
Last Post: LRE-Azan
  Deadline Set for Completion of Ghora Chowk and Cavalry Ground Projects in Lahore LRE-Azan 0 633 11-18-2023 04:09 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Accelerates Towards Completion in One Year LRE-Azan 0 749 10-04-2023 07:17 PM
Last Post: LRE-Azan
  Massive PKR 8 Billion Project Initiated to Tackle Drainage Issues on Lahore's Walton LRE-Azan 0 589 10-02-2023 03:28 PM
Last Post: LRE-Azan
  NHA ready to begin dualisation of Rawalpindi-Kahuta Road LRE-Azan 0 997 01-18-2023 03:04 PM
Last Post: LRE-Azan
  Emergency and disaster management NOC Mandatory on Building Completion in Capital Isl LRE-Azan 0 1,540 11-08-2021 08:08 PM
Last Post: LRE-Azan
  LWMC has Launched an Operation to make Mall Road a Model road of the City LRE-Azan 0 4,502 08-09-2018 06:35 PM
Last Post: LRE-Azan
  CDA chief for speedy completion of parks’ uplift projects Salman 0 4,615 02-25-2014 01:18 PM
Last Post: Salman
  CDA Chairman stresses early completion of Kashmir Highway Salman 0 4,992 02-12-2014 07:48 PM
Last Post: Salman
  Lahore Ring Road Update : Southern Loop of Ring Road to be re-assessed Salman 0 10,114 01-10-2014 12:48 PM
Last Post: Salman
  Khaira Distributory Road that links Package 17 of Ring Road to Ferozepur Road Salman 0 10,599 11-30-2013 12:48 PM
Last Post: Salman
  KMC Administrator Ordains Early Completion Of Flyovers Salman 0 5,119 10-23-2013 12:22 PM
Last Post: Salman
  Delay in completion of project irks Pindiites Salman 0 7,279 09-30-2013 03:45 PM
Last Post: Salman
  Road From LOS To Multan Road, Construction Work On The Go Salman 0 12,783 09-23-2013 03:18 PM
Last Post: Salman
  Timely completion of projects being ensured: CM Salman 0 10,063 08-03-2013 12:55 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 2 Guest(s)