Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Latest Updates on Cheel Chowk Flyover and Walton Road ADA Nala Project in Lahore
11-12-2024, 11:11 AM
Post: #1
Latest Updates on Cheel Chowk Flyover and Walton Road ADA Nala Project in Lahore
Latest Updates on Cheel Chowk Flyover and Walton Road ADA Nala Project in Lahore

Lahore's transportation landscape is undergoing a significant transformation with the construction of the Cheel Chowk Flyover and Walton Road ADA Nala Project. These projects aim to improve traffic flow, reduce congestion, and enhance connectivity within the city.

Cheel Chowk Flyover

The Cheel Chowk Flyover is a major infrastructure project designed to ease traffic congestion at one of Lahore's busiest intersections. The project involves the construction of a 1.2-kilometer elevated flyover at the Cheel Chowk intersection on Walton Road. The flyover will provide dedicated lanes for through traffic, reducing wait times and improving overall traffic flow.

Walton Road ADA Nala Project

The Walton Road ADA Nala Project is a long-awaited stormwater management project that aims to prevent flooding and improve environmental conditions in Lahore. The project involves the construction of an underground drainage system along Walton Road, which will collect and divert stormwater into the nearby Ravi River. This project will significantly reduce the risk of flooding, improve sanitation, and create a cleaner and healthier environment for residents.

Latest Progress

Both the Cheel Chowk Flyover and Walton Road ADA Nala Project are progressing steadily. According to the latest updates, the flyover structure is complete, and work is underway on the ramps and approach roads. The drainage system for the Walton Road ADA Nala Project is also nearing completion.

Benefits

Upon completion, these projects will provide numerous benefits to Lahore residents, including:

  • Reduced traffic congestion
  • Improved traffic flow
  • Reduced flooding
  • Improved environmental conditions
  • Enhanced connectivity
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  CM Naqvi Drives Forward Controlled Access Corridor Band Road Project in Lahore LRE-Azan 0 1,021 01-24-2024 06:40 PM
Last Post: LRE-Azan
  Commissioner Announces Key Milestones and Schedule for Rawalpindi Ring Road Project LRE-Azan 0 1,217 01-23-2024 03:37 PM
Last Post: LRE-Azan
  Latest News Lahore-Sialkot Motorway Link Road Project Set to Open in January LRE-Azan 0 692 01-16-2024 02:26 PM
Last Post: LRE-Azan
  Lahore-Sialkot Motorway Link Road Project Set to Open in January LRE-Azan 0 941 01-16-2024 02:25 PM
Last Post: LRE-Azan
  CBD Punjab Boulevard and Walton Project Advancements Revealed LRE-Azan 0 600 01-09-2024 03:27 PM
Last Post: LRE-Azan
  Deadline Set for the Opening of Shahdara Chowk and Ravi Bridge LRE-Azan 0 671 01-04-2024 01:58 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road (RRR) Project: 12% Completion, Anticipated Opening in August LRE-Azan 0 663 01-02-2024 06:14 PM
Last Post: LRE-Azan
  CBD Punjab CEO Imran Amin Leads Final Inspection of Renamed Ghora Chowk Flyover Honor LRE-Azan 0 518 12-22-2023 06:18 PM
Last Post: LRE-Azan
  Signal-Free Walton Road Project: Tackling 18-Kilometer Infrastructure and Drainage Is LRE-Azan 0 624 12-11-2023 04:06 PM
Last Post: LRE-Azan
  Deadline Set for Completion of Ghora Chowk and Cavalry Ground Projects in Lahore LRE-Azan 0 645 11-18-2023 04:09 PM
Last Post: LRE-Azan
  NHA and CDA Resolve T-Chowk Design Dispute Amicably LRE-Azan 0 595 11-14-2023 02:56 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 646 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Massive PKR 8 Billion Project Initiated to Tackle Drainage Issues on Lahore's Walton LRE-Azan 0 608 10-02-2023 03:28 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Faces Complication of Missing Land Record LRE-Azan 0 737 09-13-2023 07:36 PM
Last Post: LRE-Azan
  Traffic Plan Amid Cavalry Chowk Underpass Construction Issued LRE-Azan 0 662 09-12-2023 05:47 PM
Last Post: LRE-Azan
  PCBDDA Plans to Open Kalma Chowk Underpass by February 2023 LRE-Azan 0 1,072 01-25-2023 02:06 PM
Last Post: LRE-Azan
  Lahore New: Saggian-Sharaqpur Road Project is inaugurated by CM Parvez Elahi LRE-Azan 0 1,126 01-21-2023 01:04 PM
Last Post: LRE-Azan
  Rawalpindi: Kachehri Chowk Signal Free project, Hearing of Objections Completed LRE-Azan 0 1,541 03-02-2022 06:54 PM
Last Post: LRE-Azan
  Lahore Gulberg to Defence Chowk to be Made 5km Signal Free Corridor LRE-Azan 0 1,521 01-01-2022 06:51 PM
Last Post: LRE-Azan
  Lahore: Setiing New Rates for Shahkam Flyover project Lands LRE-Azan 0 1,775 12-23-2021 07:33 PM
Last Post: LRE-Azan

Forum Jump:


User(s) browsing this thread: 1 Guest(s)