Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Second phase of Muslim Town Flyover completed
04-21-2012, 12:35 PM
Post: #1
Second phase of Muslim Town Flyover completed
Second phase of Muslim Town Flyover completed

LAHORE - Muslim Town Flyover constructed at a cost of Rs 3.66 billion in a record period of five months will be inaugurated on Saturday.
This the second portion of the flyover. One leg of the flyover has already been opened.
More than 4 lakh 27 thousand 262 vehicles will pass over this 1.25 km long flyover daily. The construction of the flyover would not only save the time of the people but also reduce fuel expenses and environment pollution. It may be mentioned that it took five to six minutes for the vehicles to travel from Ichhara to Muslim Town Mor due to heavy rush of traffic which, with the construction of the flyover, will reduce the time to only 70 seconds. According to statistics it cost around 2.60 billion to the people annually in fuel expenses due to traffic jams in the area which will be substantially reduced due to construction of the flyover.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  DHA Lahore Phase 9 Town Block-D Drone Tour | Plot Prices & Development Insights LRE-Azan 0 49 11-12-2024 11:43 AM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 636 10-11-2023 07:13 PM
Last Post: LRE-Azan
  All DHA Phase 6 7 8 9 Prism Town, Bahria Town, LDA City Lahore Blockwise Rates Plot P LRE-Azan 0 666 08-21-2023 06:11 PM
Last Post: LRE-Azan
  Good news: Margalla Avenue to be Completed ‘Very Soon’ – Chairman CDA LRE-Azan 0 1,200 01-21-2023 01:15 PM
Last Post: LRE-Azan
  HYDERABAD-SUKKUR MOTORWAY TO BE COMPLETED IN 2 YEARS LRE-Azan 0 900 01-18-2023 03:07 PM
Last Post: LRE-Azan
  Rawal Dam Chowk Interchange likely to be completed by June 2022 LRE-Azan 0 1,767 12-15-2021 05:48 PM
Last Post: LRE-Azan
  Lahore DHA Town Phase 9 Commercial Area CCA Development Pictures Salman 0 9,621 10-20-2014 05:39 PM
Last Post: Salman
  LOS dual carriageway to be completed by May Salman 0 4,431 01-27-2014 07:10 PM
Last Post: Salman
  CBR Town Phase-2 Islamabad Balloting on December 21, 2013 Salman 0 10,185 12-19-2013 03:11 PM
Last Post: Salman
  Property Tax Survey Completed By Excise Department Salman 0 6,488 11-19-2013 04:51 PM
Last Post: Salman
  Railway bridge project to be completed by November 30 Salman 0 11,007 10-10-2013 01:22 PM
Last Post: Salman
  All NHA projects to be completed in stipulated time: Arbab Salman 0 9,430 08-17-2013 12:55 PM
Last Post: Salman
  Pir Wadhai project to be completed by June 31 Salman 0 4,923 06-04-2013 11:38 AM
Last Post: Salman
  RDA expedites work, but project unlikely to be completed on time Salman 0 5,298 06-01-2013 03:29 PM
Last Post: Salman
  7,100 MW Bunji Dam’s detailed engineering design completed Salman 0 5,202 05-07-2013 06:37 PM
Last Post: Salman
  Work restarts, project likely to be completed next month Salman 0 5,118 04-23-2013 12:08 PM
Last Post: Salman
  Work on service roads could not be completed despite passage of deadline Salman 0 4,849 03-12-2013 07:38 PM
Last Post: Salman
  Mareer Tunnel project to be completed in time Salman 0 5,466 03-11-2013 07:51 PM
Last Post: Salman
  Mareer Chowk tunnel project to be completed by March 15 Salman 0 5,350 01-10-2013 01:25 PM
Last Post: Salman
  Sixth road fly over to be completed by Jan 6 Salman 0 4,151 01-02-2013 12:44 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 2 Guest(s)