Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Poor condition of service roads needs immediate attention
11-05-2012, 12:01 PM
Post: #1
Poor condition of service roads needs immediate attention
Rawalpindi : The service roads on both sides of the under-construction flyover between Rahmanabad and Sixth Road are damaged and broken creating problems for motorists and commuters and resulting in traffic jams for most part of the day.

The labourers throw wastewater on service roads, which multiplies problems for motorists and pedestrians. While passing through these roads, one feels that rain has occurred or a water pipe or sewerage pipeline has leaked because dirty water accumulates in big and small ditches. The 10-foot wide roads on both sides are carpeted by only 5 feet, while the remaining 5-foot patches are covered with mud. Due to non-carpeting of 5-foot roads on both sides, a large number of motorists prefer to use the carpeted road while passing through these service roads, which also causes traffic jams.

The motorists expressed their anguish and concern over the poor planning and strategy adopted by the Communication and Works Department (C&WD) during work on the flyover project.

Arsalan Hafeez, whose car was stuck in traffic jam, expressed his annoyance over the condition of roads broken at different points and the non-carpeting of full 10-foot wide roads. He said that the concerned department should have first carpeted the entire road in addition to doing patchwork.

Owais Aslam, whose bike was stuck in a deep cavity of the broken road covered with water, expressed concern. He said that the concerned authorities should have first worked on improving the condition of service roads for smooth flow of traffic. The entire traffic has choked due to the broken road, he stated. People are suffering badly because of improper planning before starting work on the flyover project, he remarked.

Other motorists also expressed similar views and blamed the C&WD for its inefficiency and incompetence with regard to poor planning.

The motorists appealed to Punjab Chief Minister Mian Shahbaz Sharif and PML-N MNA Hanif Abbasi to take notice of the issue.

When this correspondent contacted C&WD Superintendent Engineer Farhat Munir, who is supervising the flyover project, he did not receive calls despite several attempts.

However, Rawalpindi Development Authority (RDA) Spokesman Umar Farooq stated that the construction and carpeting of service roads was the component of the flyover project, executed by the C&WD, on the orders of the Punjab chief minister. The RDA has nothing to do with the project, he added.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  IMF condition on proposal to impose tax on property sector in upcoming budget LRE-Azan 0 737 05-15-2023 01:46 PM
Last Post: LRE-Azan
  Metro Bus service will start functioning by the end of the next month. Salman 0 5,596 04-30-2015 05:19 PM
Last Post: Salman
  Inauguration of Metro Bus Service delayed yet again Salman 0 5,145 03-20-2014 06:13 PM
Last Post: Salman
  Commercialisation: LDA to assume control of buildings on 147 roads Salman 0 5,017 03-20-2014 02:54 PM
Last Post: Salman
  Metro Bus Service gets final nod from CDWP Salman 0 5,120 03-15-2014 04:53 PM
Last Post: Salman
  Five firms pre-qualify for metro bus service project Salman 0 6,485 02-10-2014 02:49 PM
Last Post: Salman
  PC-1 of Metro Bus Service project approved Salman 0 5,509 02-10-2014 02:46 PM
Last Post: Salman
  CDA to purchase 33 buses for city service Salman 0 4,333 01-13-2014 07:08 PM
Last Post: Salman
  Islamabad Bus Service Project approved Salman 0 4,908 01-06-2014 11:39 AM
Last Post: Salman
  CDA Gives Approval For Bus Service Project Salman 0 4,918 01-02-2014 01:24 PM
Last Post: Salman
  Cantonment areas to have signal-free roads Salman 0 5,910 12-21-2013 12:34 PM
Last Post: Salman
  LDA to install 136,000 LED lights on city roads Salman 0 7,061 12-02-2013 01:52 PM
Last Post: Salman
  LDA Plans To Install LED Lights On Roads Salman 0 6,445 12-02-2013 01:48 PM
Last Post: Salman
  CDA allocates Rs 8 millions for roads’ repair Salman 0 7,836 09-24-2013 11:43 AM
Last Post: Salman
  CDA demolishes all illegal kiosks from G-6 service road Salman 0 8,538 09-21-2013 02:04 PM
Last Post: Salman
  CDA yet to start maintenance work on damaged roads Salman 0 5,150 09-16-2013 04:41 PM
Last Post: Salman
  CDA to launch metro bus service in collaboration with PMBA Salman 0 7,379 08-30-2013 01:39 PM
Last Post: Salman
  Chief Justice Declares That The Money Of The Poor Will Not Be Plundered With Salman 0 6,620 08-26-2013 03:19 PM
Last Post: Salman
  National assets: PM prioritises repair of roads Salman 0 6,310 07-19-2013 12:13 PM
Last Post: Salman
  Energy, roads to consume much of Rs1.15tr PSDP Salman 0 4,030 06-13-2013 01:19 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)