Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
WASA completes work at 6th Road Flyover: Dy MD
03-13-2013, 03:17 PM
Post: #1
WASA completes work at 6th Road Flyover: Dy MD
RAWALPINDI – Deputy Managing Director Water and Sanitation Agency (WASA), Muhammad Akram Soban, said that civic body has completed all the work at 6th Road Flyover pertaining to WASA in the given timeframe.

The Water Supply line of 24 inches diameter with length of 700 feet was laid on 24 January 2013 within shortest period of 4 days and sewerage line was completed on 15 February 2013 except 200 feet length due to non-excess to the site by Provincial Highway Department (PHD), which was also completed by the end of February 2013.

These facts have been conveyed time and again to PHD and district administration in writing but PHD continuously shifting their responsibilities to other service departments. He further told that due to some problems PHD failed to complete at grade road (service road) and road drainage system despite the inauguration of Flyover on 10th January 2013.
TRENDING DISCUSSIONS
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Latest Updates on Cheel Chowk Flyover and Walton Road ADA Nala Project in Lahore LRE-Azan 0 95 11-12-2024 11:11 AM
Last Post: LRE-Azan
  Lahore: Shadra Flyover And Band Road Underpass Approved LRE-Azan 0 1,562 12-02-2021 07:51 PM
Last Post: LRE-Azan
  LWMC has Launched an Operation to make Mall Road a Model road of the City LRE-Azan 0 4,511 08-09-2018 06:35 PM
Last Post: LRE-Azan
  NHA Work on 17 Road Infrastructure Projects is continuing in backward Areas LRE-Azan 0 4,912 01-17-2018 05:24 PM
Last Post: LRE-Azan
  LDA completes 2.1km-long link road Salman 0 5,606 04-27-2015 01:40 PM
Last Post: Salman
  Work on Azadi Chowk Interchange, New Circular Road Project starts Salman 0 8,694 01-16-2014 01:55 PM
Last Post: Salman
  Khaira Distributory Road that links Package 17 of Ring Road to Ferozepur Road Salman 0 10,621 11-30-2013 12:48 PM
Last Post: Salman
  Road From LOS To Multan Road, Construction Work On The Go Salman 0 12,795 09-23-2013 03:18 PM
Last Post: Salman
  Sewerage Systems Of Four Cooperative Housing Societies To Be Connected To WASA Salman 0 10,299 09-19-2013 05:44 PM
Last Post: Salman
  Road Work To Begin In Wahga Town Salman 0 6,607 09-17-2013 02:57 PM
Last Post: Salman
  The Budget Bill For Urban Development Wing, WASA And TEPA, Passed Salman 0 6,895 07-30-2013 02:36 PM
Last Post: Salman
  The Budget Bill For Urban Development Wing, WASA And TEPA, Passed Salman 0 6,382 07-30-2013 02:36 PM
Last Post: Salman
  Karachi Development News : Flyover road inaugurated Salman 0 5,268 05-30-2013 06:39 PM
Last Post: Salman
  Work at Pirwadhai Flyover stalled Salman 0 3,579 02-04-2013 11:45 AM
Last Post: Salman
  Sixth Road flyover opened to traffic Salman 0 4,531 01-07-2013 12:27 PM
Last Post: Salman
  Sixth Road Flyover likely to be completed in five days Salman 0 4,946 01-01-2013 07:05 PM
Last Post: Salman
  Delay in 6th Road flyover feared Salman 0 4,243 12-15-2012 05:20 PM
Last Post: Salman
  CM lays foundation of Rs1.4 billion flyover,underpass at Peshawar Road Salman 0 5,630 12-03-2012 11:59 AM
Last Post: Salman
  6th Road flyover to be completed in December Salman 0 4,999 11-14-2012 01:15 PM
Last Post: Salman
  CM KP directs for rapid work on road Salman 0 5,183 11-06-2012 01:36 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)