Wapda envisages 42,000 megawatts installed capacity by the end of 2016
10-04-2008, 07:02 AM
Post: #1
Wapda envisages 42,000 megawatts installed capacity by the end of 2016
MUHAMMAD SALEEM
LAHORE (October 04 2008): The Water and Power Development Authority (Wapda) is vigorously carrying out feasibility studies and engineering designs for various hydropower projects with accumulative generation capacity of more than 25,000 MW and most of these studies are at an advanced stage of their completion. These studies, which are under way, include Bunji (5,400 MW) and Kohala (1,100 MW).

After the completion of these projects, the installed capacity is expected to be around 42,000 MW by the end of year 2016, sources told Business Recorder on Friday. Sources said Pakistan had been blessed with ample water resource, but it could develop only 13 percent storage capacity of the annual flow of its rivers, and that too were fast depleting due to sedimentation.

Under the Wapda's National Water Resource and Hydropower Development Programme - Vision 2025 - five mega hydropower projects are to be completed by 2016 with the generation capacity of 9,500 MW. Two projects were ready for awarding construction works, while three projects were in the stage of feasibility studies and preparation of tender documents, the sources added.

According to the sources, Neelum-Jhelum hydropower project has 969 MW installed capacity and will generate 5.15 billion KWh of annual energy. The project is expected to be completed in 2016. Diamer Basha Dam project, having total capacity of 4,500 MW, will produce annual energy of 16.7 billion KWh. The project had a live storage of 7.9 billion m3. The expected year of commission was 2016 with an approximate cost of 9.5 billion dollars, the sources said.

The sources said that today, the total generation capacity exceeded 17,366 MW and all big cities, towns, and a large number of big villages had the benefit of electricity. The number of consumers had also gone up to over 17.7 million, the sources said, adding that length of the lines had crossed the figures of 447,349 kilometres and the number of grid stations had increased to with 601 transmission capacity of more than 12,745 MVA.

To bridge the supply-demand gap and to do away with the load shedding, the Wapda on its part was taking many a corrective measures, which included improvement in power plants efficiency, energy loss-reduction through erection of extra high tension lines of 500 KV capacity and replacing old and worn out and overloaded distribution lines and transformers with that of high capacity etc, the sources said. According to sources, the Wapda's SCARP programme has raised new hopes for the control of the twin menace of salinity and water logging, which had gathered menacing proportions as a result of the unlined irrigation system.

http://www.brecorder.com/index.php?id=816522
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Pakistan’s first waste-to-energy plant with 40-megawatt Production Capacity LRE-Azan 0 4,460 07-18-2018 04:26 PM
Last Post: LRE-Azan
  Islamabad : Wapda Town Residential Plots for Sale, Apply Till January 31, 2014 Salman 0 10,242 01-06-2014 11:50 AM
Last Post: Salman
  Biometrics Systems Installed In 20 Cooperative Housing Schemes Salman 0 7,338 10-25-2013 07:08 PM
Last Post: Salman
  Turkish investment: Punjab signs MoU on capacity building Salman 0 4,366 10-23-2013 12:14 PM
Last Post: Salman
  LED Street Lights To Be Installed In Cooperative Housing Societies Salman 0 8,502 09-18-2013 06:29 PM
Last Post: Salman
  Punjab sets 1,000 megawatts power generation target in a year Salman 0 7,780 08-22-2013 12:17 PM
Last Post: Salman
  20,000 MW hydel projects underway: WAPDA Salman 0 3,917 04-12-2012 01:18 PM
Last Post: Salman
  Mirani Dam affectees demand action against WAPDA planners Salman 0 4,530 03-17-2012 02:18 PM
Last Post: Salman
  Wind power projects: 12 projects of 1,000 MW capacity to be functional in 2013 Salman 0 5,927 12-30-2011 03:37 PM
Last Post: Salman
  WAPDA to initiate hydropower projects Lahore_Real_Estate 0 3,812 11-19-2011 11:57 AM
Last Post: Lahore_Real_Estate
  UK-based company plans to set up 21 megawatts power plant in Karachi Lahore_Real_Estate 0 4,532 10-13-2010 12:51 PM
Last Post: Lahore_Real_Estate
  Gwadar Corridor Planned for Central Asina States; Oil Refineries to be Installed LRE 1 6,343 10-07-2010 09:37 AM
Last Post: LRE
  No More Free Electricity for WAPDA Employees LRE 0 4,451 05-04-2010 06:58 PM
Last Post: LRE
  Scanners installed in federal capital Lahore_Real_Estate 0 3,289 04-06-2010 12:42 PM
Last Post: Lahore_Real_Estate
  Scanners installed in federal capital Lahore_Real_Estate 0 3,241 04-06-2010 12:39 PM
Last Post: Lahore_Real_Estate
  WAPDA exempts Mirpur from load shedding Lahore_Real_Estate 0 3,603 03-25-2010 03:12 PM
Last Post: Lahore_Real_Estate
  Solar Powered Tube Wells to be Installed LRE 1 7,308 01-20-2010 03:41 PM
Last Post: LRE
  Raja Pervez Ashraf & his Brothers Defaulters of IESCO/WAPDA! LRE 1 7,291 01-16-2010 12:52 AM
Last Post: LRE
  Scanner gates to be installed in Peshawar LahoreEstate 0 3,312 11-23-2009 04:36 AM
Last Post: LahoreEstate
  Laproscopy machines installed at Mayo Hospital Naveed Yaseen 0 3,377 11-20-2009 09:17 AM
Last Post: Naveed Yaseen

Forum Jump:


User(s) browsing this thread: 1 Guest(s)