Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Chandni Chowk flyover will be completed in March
01-10-2012, 12:36 PM
Post: #1
Chandni Chowk flyover will be completed in March
Chandni Chowk flyover will be completed in March

RAWALPINDI - The Chandni Chowk flyover review committee was informed on Monday that 40 percent of the flyover’s construction had been completed and it would be open to the public by March 13. The meeting, chaired by MNA Muhammad Hanif Abbasi, was held at the Chief Commissioner office. The chair directed the contractor to stop the Chandni Chowk traffic police post reconstruction until the project design was approved.
During the meeting it was decided that two pedestrian bridges would be constructed to cross the Murree Road and connect with the flyover. One of these bridges would be connected to the Benazir Bhutto Shaheed Hospital (BBH) and the other to Rehmanabad Chowk. The land of two petrol pumps situated adjacent to the BBH would be released after 12th January and would also be used for construction. Abbasi also directed the contractor to level both sides of the road adjacent to the flyover to ensure smooth traffic flow and to avoid any inconvenience to the commuters. The Rawalpindi Commissioner Zahid Saeed directed WAPDA authorities to remove electric poles from both sides of the construction site. The WAPDA authorities informed that most of the poles had been shifted while the rest would be moved by January 18.
The Commissioner also directed the Rawalpindi Development Authority to install the pedestrian bridge, removed from BBH, near Gulshan Daden Khan on Murree Road.
Abbasi also appealed to the citizens to use alternate routes to avoid inconvenience. The meeting was attended by the Rawalpindi commissioner and other officers concerned.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Latest Updates on Cheel Chowk Flyover and Walton Road ADA Nala Project in Lahore LRE-Azan 0 64 11-12-2024 11:11 AM
Last Post: LRE-Azan
  Deadline Set for the Opening of Shahdara Chowk and Ravi Bridge LRE-Azan 0 651 01-04-2024 01:58 PM
Last Post: LRE-Azan
  CBD Punjab CEO Imran Amin Leads Final Inspection of Renamed Ghora Chowk Flyover Honor LRE-Azan 0 503 12-22-2023 06:18 PM
Last Post: LRE-Azan
  Deadline Set for Completion of Ghora Chowk and Cavalry Ground Projects in Lahore LRE-Azan 0 634 11-18-2023 04:09 PM
Last Post: LRE-Azan
  NHA and CDA Resolve T-Chowk Design Dispute Amicably LRE-Azan 0 567 11-14-2023 02:56 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 636 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Traffic Plan Amid Cavalry Chowk Underpass Construction Issued LRE-Azan 0 643 09-12-2023 05:47 PM
Last Post: LRE-Azan
  PCBDDA Plans to Open Kalma Chowk Underpass by February 2023 LRE-Azan 0 1,053 01-25-2023 02:06 PM
Last Post: LRE-Azan
  Good news: Margalla Avenue to be Completed ‘Very Soon’ – Chairman CDA LRE-Azan 0 1,200 01-21-2023 01:15 PM
Last Post: LRE-Azan
  HYDERABAD-SUKKUR MOTORWAY TO BE COMPLETED IN 2 YEARS LRE-Azan 0 900 01-18-2023 03:07 PM
Last Post: LRE-Azan
  Rawalpindi: Kachehri Chowk Signal Free project, Hearing of Objections Completed LRE-Azan 0 1,520 03-02-2022 06:54 PM
Last Post: LRE-Azan
  Lahore Gulberg to Defence Chowk to be Made 5km Signal Free Corridor LRE-Azan 0 1,498 01-01-2022 06:51 PM
Last Post: LRE-Azan
  Rawal Dam Chowk Interchange likely to be completed by June 2022 LRE-Azan 0 1,768 12-15-2021 05:48 PM
Last Post: LRE-Azan
  Flyover on Azadi Chowk : LHC extends stay against demolition Salman 0 4,965 02-26-2014 10:23 PM
Last Post: Salman
  Rs. 1.5 billion Allotted For Azadi Chowk Flyover Salman 0 5,981 02-07-2014 07:34 PM
Last Post: Salman
  LOS dual carriageway to be completed by May Salman 0 4,434 01-27-2014 07:10 PM
Last Post: Salman
  Work on Azadi Chowk Interchange, New Circular Road Project starts Salman 0 8,678 01-16-2014 01:55 PM
Last Post: Salman
  Mareer Chowk Railway Bridge finally becomes operational Salman 0 5,287 01-08-2014 02:43 PM
Last Post: Salman
  Property Tax Survey Completed By Excise Department Salman 0 6,488 11-19-2013 04:51 PM
Last Post: Salman
  Rs 1,600m approved for Azadi Chowk shifting Salman 0 9,598 11-18-2013 12:16 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)