Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Pakistan's First Ever Suspended Flyover Bridge Azadi Chowk Interchange will Open Soon
07-07-2014, 05:38 PM (This post was last modified: 07-07-2014 05:45 PM by Salman.)
Post: #1
Pakistan's First Ever Suspended Flyover Bridge Azadi Chowk Interchange will Open Soon
LAHORE - The Lahore Development Authority (LDA) on Saturday has completed constructing Azadi Chowk Signal Free Junction and new Circular Road Projects in a record time of 165 days at a total cost of Rs5.35 billion.
Punjab Chief Minister Shahbaz Sharif will formally inaugurate the projects very soon, an LDA spokesperson said.
Work on the Azadi Chowk Signal Free Junction was started by Traffic Engineering and Transportation Planning Agency (TEPA) on January 15 this year which has been completed at a cost of Rs4.5 billion on 29 June.
A flyover and an elevated roundabout have also been constructed under this project at Ravi Road. The roundabout has three up-ramps and three down-ramps; two up-ramps and two down-ramps on Ravi Road, starting from Texali Chowk and ending at Timber Market. One up-ramp and a down-ramp have also been constructed on Ahmad Ali Road. The overall length of the interchange is 2.53 kilometers.
Traffic leading to Circular Road from Data Darbar, Shahdara and Timber Market will use this flyover for going to Maulana Ahmed Ali Road, Lorry Adda and other points at Circular Road. On average, over two hundred thousand vehicles will daily pass through this junction, saving fuel of Rs9 million per annum.
New Circular Road was also part of this project, which has been completed at a cost of Rs1.35 billion. Total length of this road is 1.6 km. This dual carriage way is 14.7 meters wide on each side. Each side comprises of four lanes and every lane is 3.3 meter wide. A roundabout and two U-turns were also made on this road. This new road was started from Maulana Ahmed Ali Road and then connects Minar-e-Pakistan, Lorry Adda, Badami Bagh, Masti Gate and Circular Road.
Mayo projects inaugurated
Adviser to Chief Minister on Health Kh Salman Rafiq and Chief Secretary Punjab Naveed Akram Cheema on Saturday inaugurated various projects completed with the financial assistance of philanthropists at Mayo Hospital.
Philanthropists provided Rs354 million for setting up Dialysis Centre in Nephrology Department, construction of roads outside OPD, addition of one floor at Pediatric Department building, installation of tube-well, construction of mosque, provision of meal to 1600 patients twice of day, upgrade of Orthopedic and Traumatology department.
Addressing the inaugural ceremony, Kh Salman Rafiq said that donors were the real heroes who were spending millions of rupees for the public welfare. He said that government had allocated Rs121 billion for health sector and special attention was paid to the prevention of diseases.
He lauded the services of philanthropists who had provided 354 million for the Mayo Hospital development projects.
The chief secretary said that though the government had enhanced health budget by 16 per cent, role of philanthropists was important in providing best treatment facilities to the deserving patients. He appreciated philanthropists for donating huge amount for the suffering humanity.

[Image: attachment.php?aid=1237]

[Image: attachment.php?aid=1231]

[Image: attachment.php?aid=1233]

[Image: attachment.php?aid=1235]

[Image: attachment.php?aid=1236]

[Image: attachment.php?aid=1234]

[Image: attachment.php?aid=1232]


Attached File(s)
.jpg  Azadi Chowk.jpg (Size: 74.6 KB / Downloads: 23021)
.jpg  Azadi Chowk Flyover.jpg (Size: 62.48 KB / Downloads: 17430)
.jpg  Azadi Chowk Flyover Inaguration.jpg (Size: 30.21 KB / Downloads: 7844)
.jpg  Azadi Chowk Flyover completed.jpg (Size: 21.92 KB / Downloads: 13048)
.jpg  10404523_756296787742263_5957035451860442482_n.jpg (Size: 62.23 KB / Downloads: 12367)
.jpg  10511177_756296784408930_6194302248444089102_n.jpg (Size: 65.58 KB / Downloads: 13962)
.jpg  Azadi Chowk Flyover Work.jpg (Size: 127.49 KB / Downloads: 41046)
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  LDA City Lahore Development Progress: Chenab Road Bridge | C Block Possession Updates LRE-Azan 0 503 11-22-2023 07:15 PM
Last Post: LRE-Azan
  Masjid Chowk DHA Lahore LRE-Azan 0 566 06-26-2023 06:22 PM
Last Post: LRE-Azan
  Capital Smart City Development | Interchange & Other Infra Works | Working Day & Nigh LRE-Azan 0 767 10-28-2022 05:38 PM
Last Post: LRE-Azan
  Aerial Tour: Shahkam Chowk Flyover to Bahria Town Lahore Eiffel Tower | December 2021 LRE-Azan 0 1,321 12-17-2021 07:33 PM
Last Post: LRE-Azan
  Etihad Town Lahore | Apartment Booking Open | 2 Bed Is Recommended | Booking Open Now LRE-Azan 0 1,777 04-16-2021 12:22 PM
Last Post: LRE-Azan
  DHA Bahawalpur Main Entrance Bridge Near Completion Latest Update by LRE Dec 2018 LRE-Azan 0 2,219 12-13-2018 09:06 PM
Last Post: LRE-Azan
  DHA City Karachi Latest Update on Interchange M9 LRE-Azan 0 2,243 07-12-2018 01:20 PM
Last Post: LRE-Azan
  CDA has prepared a PC-1 worth PKR 31 Billion For the Construction of an Interchange LRE-Azan 0 2,838 11-01-2017 03:44 PM
Last Post: LRE-Azan
  Longest interchange In Lahore will be Completed soon Salman 0 2,267 10-16-2017 03:29 PM
Last Post: Salman
  Orange Line Metro Project (Arch Bridge) Salman 0 3,150 09-06-2016 04:05 PM
Last Post: Salman
  Lake city interchange is part of 6 full interchanges as per Punja Govt Salman 0 4,179 05-30-2016 11:42 AM
Last Post: Salman
  Lakshami Chowk Orange Line Metro Train UnderPass Salman 0 5,186 05-27-2016 12:59 PM
Last Post: Salman
  Peshawar Mor Interchange to be completed in 3 months Salman 0 3,318 06-19-2015 05:30 PM
Last Post: Salman
  LDA will construct sigbal free route from Qartaba chowk to Liberty for Rs. 1.3 billio Salman 0 2,934 02-09-2015 04:39 PM
Last Post: Salman
  LDA plans bridge from Hussain Chowk to DHA Salman 0 3,351 08-02-2014 05:27 PM
Last Post: Salman
  Shahbaz opens Azadi Chowk flyover built in record time Salman 0 4,198 07-14-2014 01:32 PM
Last Post: Salman
  Rs 2.22bn approved for Ghazi Road Interchange Salman 0 2,750 07-07-2014 05:19 PM
Last Post: Salman
  Azadi Chowk flyover to complete in July Salman 0 3,229 06-30-2014 01:54 PM
Last Post: Salman
  Kashmir Highway Bridge opened for traffic Salman 0 3,864 06-04-2014 07:16 PM
Last Post: Salman
  Marrir Chowk expansion faces delay due to slow pace of work Salman 0 3,287 06-02-2014 02:01 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)