The following warnings occurred:
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 802 - File: showthread.php PHP 7.4.29 (Linux)
File Line Function
/showthread.php 802 errorHandler->error





Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Elevated Super Expressway: CM to inaugurate work on Oct 1
09-13-2008, 05:41 PM
Post: #1
Elevated Super Expressway: CM to inaugurate work on Oct 1
CM to inaugurate work on Oct 1



Saturday, September 13, 2008
Saeed Ahmed

Rawalpindi

The work on the Elevated Super Expressway would kick off on October 1 as Punjab Chief Minister Mian Shahbaz Sharif will inaugurate the work at Shamshabad.

Sources told ‘The News’ Friday that the chief minister is determined to resolve traffic snarls at Murree Road, which is aggravating with each passing day. He has directed the Rawalpindi Development Authority to start work on the project which include its survey, study and designing. The project costing Rs25 billion would be built from Mareer Chowk to Faizabad, which would be completed in two years time.

The work has been awarded to Nespak. An amount of Rs20 million for carrying out study and design work on the project has been allocated and would be released after inauguration of the project. “If Eid ul Fitr falls on the same day, the date of inauguration could be extended by a week, the sources said.

The components of the project include construction of flyover from Marrir Chowk to Faizabad connecting Rawalpindi directly with the capital. The traffic plying on Murree Road would not be affected during work on the Elevated Express, the sources said. The other components include expansion of Railway Bridge with construction of additional two lanes at Marrir Chowk. The flyover would also bisect other areas as well including Tipu Road from Liaquat Bagh, inner localities in Committee chowk, Asghar Mall, Rehmanabad, Sixth Road and Liaquat Road. The flyover would be meant for those who want to go directly to Islamabad from Marrir Chowk. The people residing in inner localities could use Murree Road. With the completion of the project, the traffic problem would be resolved for the next 30 years i.e. the year 2040 without any hurdle or blockades.

Director General RDA Makeen Shahbaz confirmed the report of the inauguration of Elevated Express. After its inauguration, development projects including Business and Community Centre at Committee Chowk and Parking cum Shopping Plaza in Raja Bazaar would be started, he added. Wrk on Leh Expressway would also be initiated before the next monsoon season but work on the component of flood control channel would be initiated and completed at the earliest, he told.

http://www.thenews.com.pk/daily_detail.asp?id=135473
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
Elevated Super Expressway: CM to inaugurate work on Oct 1 - LRE - 09-13-2008 05:41 PM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Chief Minister Naqvi Reviews Advancements in LRR SL-3, Gujranwala Expressway, and Dad LRE-Azan 0 634 01-23-2024 03:34 PM
Last Post: LRE-Azan
  DHA Multan Prepares for Groundbreaking of Expressway LRE-Azan 0 558 10-20-2023 05:01 PM
Last Post: LRE-Azan
  Exciting Developments Unveiled by DHA Quetta: Expressway Reopens, Cutting-Edge Lab La LRE-Azan 0 633 09-14-2023 04:33 PM
Last Post: LRE-Azan
  Faisalabad: Demolition of Illegal Commercial Market on Canal Expressway LRE-Azan 0 1,369 03-02-2022 06:50 PM
Last Post: LRE-Azan
  Rawalpindi: Lai Expressway Project, Section 4 Notification Issued for Land LRE-Azan 0 1,406 12-18-2021 02:18 PM
Last Post: LRE-Azan
  Rawalpindi: Lai Expressway Project, Section 4 Notification Issued for Land Acquisitio LRE-Azan 0 1,439 12-18-2021 02:16 PM
Last Post: LRE-Azan
  PM announces Sialkot-Lahore expressway Salman 0 5,692 04-30-2015 05:21 PM
Last Post: Salman
  Islamabad Expressway widening project on the cards Salman 0 5,960 04-09-2015 04:20 PM
Last Post: Salman
  Govt gives green signal to Leh Expressway project Salman 0 4,955 02-20-2014 01:52 PM
Last Post: Salman
  CDA Plans To Inaugurate More Residential Communities In Islamabad Salman 0 5,195 12-27-2013 04:37 PM
Last Post: Salman
  Need for early completion of Lyari expressway project stressed Salman 0 5,287 06-20-2013 12:37 PM
Last Post: Salman
  Pedestrians may soon find a wall on Expressway Salman 0 4,489 03-14-2013 05:41 PM
Last Post: Salman
  Shahbaz orders fresh feasibility study on Nullah Leh Expressway Salman 0 4,701 02-26-2013 11:39 AM
Last Post: Salman
  Residents For Head-Bridge Over Expressway Salman 0 4,612 02-02-2013 01:49 PM
Last Post: Salman
  Dawn.com Newspaper Lyari Expressway SHC stays demolition of houses in Liaq Salman 0 4,975 01-10-2013 01:29 PM
Last Post: Salman
  Expressway-II Project gets attention of city bosses Salman 0 4,829 12-12-2012 01:58 PM
Last Post: Salman
  Super Highway development activities Salman 0 5,154 11-28-2012 01:06 PM
Last Post: Salman
  CM to inaugurate work on Friday Salman 0 3,942 11-14-2012 01:17 PM
Last Post: Salman
  CM to inaugurate work on 15th Salman 0 3,878 11-07-2012 12:23 PM
Last Post: Salman
  President wants expressway to Zulfikarabad built Salman 0 4,731 11-02-2012 04:34 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)