The following warnings occurred:
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 802 - File: showthread.php PHP 7.4.29 (Linux)
File Line Function
/showthread.php 802 errorHandler->error





Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Rawalpindi: Rs 10 billion elevated expressway project work begins after Eid
09-28-2008, 10:11 AM
Post: #1
Rawalpindi: Rs 10 billion elevated expressway project work begins after Eid
By Aamir Yasin
RAWALPINDI: Punjab Chief Minister and Pakistan Muslim League-Nawaz (PML-N) President Shahbaz Sharif will inaugurate the ambitious Elevated Expressway Project after Eidul Fitr.

The Rs10 billion expressway would be built over Benazir Bhutto Shaheed Road aKa Murree Road from the Mall to Faizabad, sources in Rawalpindi Development Authority (RDA) told Daily Times.

The expressway will be completed in three years and will facilitate the flow of traffic on Benazir Bhutto Shaheed Road that remains chock-a-block with traffic most of the time causing longs snarl-ups and wastage of precious fuel and time.

National Engineering Services Pakistan (Nespak) is preparing the design of the expressway. At present, the company is conducting the topographic survey that is likely to be completed early next year.

According to a recent study, around 100,000 vehicles daily use Benazir Bhutto Shaheed Road and the construction of expressway would save around 200,000 people boarding 60,000 vehicles from traffic delay and serious accidents.

The expressway will run over Murree Road from the Mall (Flashman Hotel) and join Islamabad Highway via Faizabad Interchange.

The expressway would have six lanes with interchanges at Marir Chowk, Chandni Chowk, Sixth Road and Shamsabad. After its completion the motorists would be able to cover a distance of around 25 kilometers within 10 to 15 minutes, saving their precious time and fuel.

The sources said that the project would be completed in three phases. The Mall to Marir Chowk stretch of the expressway falls in the first phase; Marir Chowk to Chandni Chowk stretch in the second phase; and Chandni Chowk to Faizabad section in the third phase.

They said Marir Chowk to Chandni Chowk section of the expressway would be completed within 36 months while the remaining work would be completed within 46 months.

Rawalpindi Development Authority (RDA) Director General M Makeen Shahbaz said that the project was scheduled to be inaugurated on October 1, but the date was changed in view of Eidul Fitr. He said the new date would be announced after Eid vacations.

He said the RDA had completed its homework to start the project.

Meanwhile, Leader of Opposition in the National Assembly Ch Nisar Ali Khan on Saturday said that the Punjab Chief Minister Shahbaz Sharif will inaugurate work on the Rs 10 billion Elevated Expressway Project after Eidul Fitr.

He said this while talking to a delegation headed by CM Inspection Team Chairman Chaudhry Sarfaraz Afzal.

Nisar said the government would take all essential measures to ensure protection of public life and property. He said development funds would be distributed among union councils (UCs) equally to sustain consistency in increasing prosperity of the city.

Khan directed the police to take action against gamblers and drug peddlers. He said the Punjab government was committed to eradicating corruption, poverty, injustice and illiteracy from the society under the headship of Shahbaz Sharif.

http://www.dailytimes.com.pk/default.asp...008_pg11_7
Quote this message in a reply
Post Reply 


Messages In This Thread
Rawalpindi: Rs 10 billion elevated expressway project work begins after Eid - Naveed Yaseen - 09-28-2008 10:11 AM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Commissioner Announces Key Milestones and Schedule for Rawalpindi Ring Road Project LRE-Azan 0 1,181 01-23-2024 03:37 PM
Last Post: LRE-Azan
  Chief Minister Naqvi Reviews Advancements in LRR SL-3, Gujranwala Expressway, and Dad LRE-Azan 0 635 01-23-2024 03:34 PM
Last Post: LRE-Azan
  Rawalpindi Commissioner Confirms Limited Access to Rawalpindi Ring Road for Housing S LRE-Azan 0 625 01-10-2024 06:07 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road (RRR) Project: 12% Completion, Anticipated Opening in August LRE-Azan 0 647 01-02-2024 06:14 PM
Last Post: LRE-Azan
  DHA Multan Prepares for Groundbreaking of Expressway LRE-Azan 0 558 10-20-2023 05:01 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 636 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Massive PKR 8 Billion Project Initiated to Tackle Drainage Issues on Lahore's Walton LRE-Azan 0 589 10-02-2023 03:28 PM
Last Post: LRE-Azan
  Exciting Developments Unveiled by DHA Quetta: Expressway Reopens, Cutting-Edge Lab La LRE-Azan 0 633 09-14-2023 04:33 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Faces Complication of Missing Land Record LRE-Azan 0 716 09-13-2023 07:36 PM
Last Post: LRE-Azan
  LDA Begins Development Work on Journalist Colony LRE-Azan 0 851 04-27-2023 03:25 PM
Last Post: LRE-Azan
  Sindh Government Approves Resumption Of Work On Malir Express Project LRE-Azan 0 903 04-25-2023 02:57 PM
Last Post: LRE-Azan
  CDA Approve A Multi-Billion Dollar Project For The Rural Belt LRE-Azan 0 884 03-02-2023 07:27 PM
Last Post: LRE-Azan
  Rawalpindi: Kachehri Chowk Signal Free project, Hearing of Objections Completed LRE-Azan 0 1,519 03-02-2022 06:54 PM
Last Post: LRE-Azan
  Faisalabad: Demolition of Illegal Commercial Market on Canal Expressway LRE-Azan 0 1,369 03-02-2022 06:50 PM
Last Post: LRE-Azan
  FBR: Negotiations Begins on New Property Rates LRE-Azan 0 1,411 01-01-2022 06:32 PM
Last Post: LRE-Azan
  Rawalpindi: Lai Expressway Project, Section 4 Notification Issued for Land LRE-Azan 0 1,406 12-18-2021 02:18 PM
Last Post: LRE-Azan
  Rawalpindi: Lai Expressway Project, Section 4 Notification Issued for Land Acquisitio LRE-Azan 0 1,439 12-18-2021 02:16 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project New Design is Ready LRE-Azan 0 1,674 11-20-2021 12:22 PM
Last Post: LRE-Azan
  Rawalpindi: Ring Road Project, Rs. 24 Billion Approved in PC-1 LRE-Azan 0 1,481 10-27-2021 01:04 PM
Last Post: LRE-Azan
  PM announces Sialkot-Lahore expressway Salman 0 5,693 04-30-2015 05:21 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 2 Guest(s)