The following warnings occurred:
Warning [2] count(): Parameter must be an array or an object that implements Countable - Line: 802 - File: showthread.php PHP 7.4.29 (Linux)
File Line Function
/showthread.php 802 errorHandler->error





Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Punjab approves 22 uplift projects worth Rs 34 billion
04-10-2014, 02:52 PM
Post: #1
Punjab approves 22 uplift projects worth Rs 34 billion
The Punjab Government on Tuesday approved twenty-two development schemes of different economic and welfare sectors with an estimated cost of Rs 34,038.914 million. These schemes were approved in the 38th meeting of Provincial Development Working Party of current fiscal year 2013-14 presided over by the Punjab Planning and Development Board Chairman Muhammad Irfan Elahi.

Provincial Secretary P&D Arif Anwar Baloch, all members of the Planning and Development Board, Provincial Secretaries concerned and other senior representatives of the relevant Provincial Departments also attended the meeting. According to spokesman P&D, the approved development schemes include:

1. Re-Designing and Up-Gradation of Under-Construction Building of Murree Arts Council, Murree. (PC-II) at the cost of Rs 7.000 million;

2. Establishment of 60 Bedded Hospital at Sabzazar Scheme Lahore at the cost of Rs 287.502 million;

3. Provision of Missing Specialties for Up-Gradation of DHQ Hospitals (AIMH and GSBH Sialkot) to Teaching Hospitals at the cost of Rs 2,054.460 million;

4. Survey, Soil Investigation and Detail Architectural/Structural Designing of Construction of Parking Plazas with Shopping Malls at Faisalabad (PC-II) at the cost of Rs 599.041 million;

5. Construction of Canal Express Way from Gatt Wala Bridge to Sahian Wala (M-3) Interchange, Faisalabad (length=24.50km) at the cost of Rs 5,825.351 million;

6. Construction of Metro Bus Transit System for Lahore-Ferozepur Road Corridor, Package-II Construction of MTS from Kalma Chowk to Qartaba Chowk (Elevated Section) length-4.9 km (Revised) at the cost of Rs 5,966.902 million;

7. Complete Repair and Renovation of Sewerage System Including PCC. Drains, Water Channels, Soling, Tuff Tiles, etc, in Basirpur, District Okara at the cost of Rs 277.734 million;

8. Dualization and Beautification of Mianwali Muzaffargarh Road passing through Chowk Munda from km No 226.50 to 229.50 length 3.00km District Muzaffargarh at the cost of Rs 209.150 million;

9. Construction of Southern Bye-Pass Muzaffargarh-Alipur Road to Dera Ghazi Khan Road (N-70) length-9.25km District Muzaffargarh at the cost of Rs 282.867 million;

10. Lahore Ring Road (Package-10) Construction of Interchange at GT Road (Revised) at the cost of Rs 1,929.595 million;

11. Lahore Ring Road Construction of road Portion from Niazi Chowk to Mehmood Booti (Package-3) (2nd Revised) at the cost of Rs 3,212.651 million;

12. Lahore Ring Road (Package 11A) Widening/Improvement of Ghazi Road from Package-11 of LRRP to Rehman Villas including Improvement of Bhatta Chowk at the cost of Rs 213.106 million;

13. Lahore Ring Road Construction of Link to GT Road at Daroghawala (Package-13A) (Revised) at the cost of Rs 288.468 million;

14. Lahore Ring Road Construction of Interchange at Bedian Road (length-1.40 km) (4th Revised) (Package-15) at the cost of Rs 2,185.002 million;

15. Lahore Ring Road Construction of road portion from Bedian Road Intersection to Khaira Distributary (2nd Revised) (Package-16) at the cost of Rs 868.202 million;

16. Lahore Ring Road Construction of road along Khaira Distributary from Package 17 to Ferozepur Road (length-3.16km) (2nd Revised) at the cost of Rs 496.450 million;

17. Construction of Kasur Bye-Pass Connecting Ferozepur Road with Depalpur Road (length 9.6-km) at the cost of Rs 1,541.000 million;

18. Construction of Kasur Sports Complex, Khem Karan Road, Kasur at the cost of Rs 377.430 million;

19. Construc-tion-Improvement of Maulana Shaukat Ali Road to Multan Road via Kareem Block Market at the cost of Rs 1,765.435 million;

20. Widening and Improvement of Main Road Sheikhupura at the cost of Rs 2,444.498 million;

21. Construction of Link Connecting Motorway at Shahpur Kanjran to Raiwind Road and Khayaban-e-Jinnah, Lahore at the cost of Rs 2,314.570 million; and;

22. Construction of Underpass at Sheikhupura Gujranwala Road and Sheikhupura Hafizabad Road, Sheikhupura at the cost of Rs 892.50 million.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
Punjab approves 22 uplift projects worth Rs 34 billion - Salman - 04-10-2014 02:52 PM

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Why DHA Lahore Phase 9 Prism A-Block Still Worth to buy? | To Know The Details Plz Wa LRE-Azan 0 447 11-30-2023 05:56 PM
Last Post: LRE-Azan
  DHA Lahore Phase 6 Commercial: Prices Updates & Recommended CCA | Is It Worth Investi LRE-Azan 0 500 10-27-2023 02:13 PM
Last Post: LRE-Azan
  DHA Lahore Phase 7 CCA 3 Commercial Prices, Development Status | Is it Worth for Inve LRE-Azan 0 481 09-07-2023 07:06 PM
Last Post: LRE-Azan
  Invest in DHA Lahore Phase 9 Town Complete Briefing About Its Worth for Investor & En LRE-Azan 0 471 07-20-2023 05:55 PM
Last Post: LRE-Azan
  Is it Worth to Invest in DHA Rahbar Phase 11 sector 4 In Current Market LRE-Azan 0 559 07-12-2023 06:00 PM
Last Post: LRE-Azan
  Lahore Smart City Commercial Updates: Does it Worth Investing in Current Market? LRE-Azan 0 570 05-22-2023 06:18 PM
Last Post: LRE-Azan
  DHA Phase 6 Lahore A Block | Still Worth For Investment? | Drone Video | May 2021 LRE-Azan 0 1,708 04-30-2021 05:40 PM
Last Post: LRE-Azan
  Rs78.6 billion rupees will be spent on 781 Development Projects in Bahawalpur LRE-Azan 0 2,301 12-13-2017 02:16 PM
Last Post: LRE-Azan
  Prime Minister SK Abbasi approves 10 more projects under CPEC LRE-Azan 0 2,738 11-20-2017 04:30 PM
Last Post: LRE-Azan
  CDA acquire land worth Rs20 billion vacated from Centaurus Mall LRE-Azan 0 2,324 11-11-2017 03:36 PM
Last Post: LRE-Azan
  Sindh Government has approves several projects under public LRE-Azan 0 2,684 11-11-2017 03:22 PM
Last Post: LRE-Azan
  Development projects worth Rs1400b under execution: NHA Salman 0 2,437 11-09-2017 01:47 PM
Last Post: Salman
  CDA has prepared a PC-1 worth PKR 31 Billion For the Construction of an Interchange LRE-Azan 0 2,832 11-01-2017 03:44 PM
Last Post: LRE-Azan
  Punjab Property News : PKR 15 billion reserved for sewerage schemes in rural areas Salman 0 2,325 10-31-2017 01:38 PM
Last Post: Salman
  Worth reading it. Its from highly respected business organization Salman 0 3,332 05-18-2016 11:53 AM
Last Post: Salman
  Railways recovers land worth over PKR 27 million Salman 0 2,850 12-03-2015 12:13 PM
Last Post: Salman
  PM Gets Briefing on Ongoing Uplift Projects Salman 0 2,666 10-16-2015 04:53 PM
Last Post: Salman
  PDWP approves 12 uplift schemes Salman 0 3,171 08-04-2015 08:34 PM
Last Post: Salman
  Punjab approves 17 development schemes worth Rs 37.40 billion Salman 0 3,299 06-21-2015 11:13 AM
Last Post: Salman
  Rs.185 billion allocated for highways projects in next budget: Dar Salman 0 2,769 06-10-2015 04:39 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)